Vandenberg Village Pavement Preservation Project (CAPM)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Vandenberg Village Pavement Preservation Project (CAPM) is a transportation infrastructure initiative by Caltrans District 5 to rehabilitate approximately six miles of State Route 1 in Santa Barbara County, spanning from post mile 23.000 to 29.891 near Lompoc. The scope includes comprehensive pavement restoration using Rubberized Hot Mix Asphalt, the replacement of 1,900 linear feet of guardrail to MASH compliance standards, rehabilitation of 21 ADA-accessible curb ramps, installation of bicycle conflict markings at eight intersections, widening of shoulders to accommodate bike turn lanes, repair of three culverts, and upgrade of four roadside signs for improved retroreflectivity. Work is scheduled to occur between summer and winter of 2027, with an anticipated duration of 170 to 200 working days, and is tied to a federally influenced yet state-administered procurement process under Caltrans standard specifications rather than traditional FAR contract clauses. The contract requires strict adherence to environmental regulations including Section 404 and Section 401 permits, a Streambed Alteration Agreement with the California Department of Fish and Wildlife, and a Mitigation and Monitoring Plan that governs habitat protection, erosion control, and stormwater management. All construction activities must comply with Caltrans Earthwork Standards, including 95% compaction requirements, and emissions reduction protocols aligned with California Air Resources Board rules. Specific bio-protection measures restrict aquatic work to June through October, mandate ESA fencing around sensitive areas, enforce immediate spill response, and require pre-construction surveys for special-status species such as the California red-legged frog, with protocols for work stoppage and agency consultation if encountered. The project mandates use of recycled materials, minimization of diesel idling, and implementation of long-life pavement design to reduce lifecycle emissions. Contractors must develop a Transportation Management Plan and follow detailed BMPs for staging, waste handling, and water quality protection, with all compliance obligations documented in an Environmental Commitments Record. While no formal contract value or pricing structure is provided, the project is administered under Caltrans' Capital Preventative Maintenance framework and is subject to oversight by the designated lead agency representative, Lucas Marsalek, Senior Environmental Scientist, who serves as the primary point of contact for environmental and technical coordination. Proposals were accepted through November 30, 2025, and all submissions required alignment with CEQA environmental documentation standards, including submission through designated state portals and email.
General Info
Agency
NAICS
Place of Performance
W Lompoc Casmalia Rd/ Purisima Rd, Lompoc, CA, 93437Set-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
