Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

Big River Trap 31 CP Pilot Project

Awarded
W912P926R8917Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Big River Trap 31 CP Pilot Project, identified by solicitation number W912P926R8917, is a total small business set-aside under NAICS code 237990, issued by the U.S. Army Corps of Engineers in Saint Louis, Missouri. The project aims to construct an off-channel sediment trap at River Mile 31 of the Big River to facilitate the controlled deposition of lead-impacted sediments near sensitive freshwater mussel beds. Only current PL84-99 MATOC holders are eligible to respond to this requirement. Amendment 0001 includes a Hold Harmless Agreement for contractor review, and Amendment 0002 adds bonding requirements and publishes official Q&A responses. A mandatory site visit is scheduled for May 7, 2026, at 9 a.m. at the location marked by the red circle on Attachment 4, and all potential bidders are expected to inspect the site before submitting proposals. Questions must be submitted through the ProjNet Bidder Inquiry Portal no later than 9:00 a.m. CDT on Monday, May 11, 2026, and proposals are due by 10:00 a.m. CDT on May 22, 2026. Primary point of contact for inquiries is Jessica Nies, reachable via email or phone.

General Info

Big River Trap 31 CP project for small businesses to manage lead-contaminated sediments, mandatory site visit May 7, 2026, proposals due May 22, 2026.

Agency

Department Of Defense → W07V Endist St LouisView Agency

NAICS

237990 - Other Heavy and Civil Engineering Construction View NAICS

Place of Performance

Please see Attachment 4 ? Pre-Bid Site Visit Map for project location, MO

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Louis
Contacts1 person available
OfficeSAINT LOUIS, MO, 63103-2833, USA
Organization / Agency
Department Of Defense → W07V Endist St Louis
View Agency Profile
Office AddressSAINT LOUIS, MO, 63103-2833, USA

Full Description

Show more
Big River Trap 31 Amendment 0002 Adds Bond clauses and posts the Q and A recieved. Amendment 0001 attaches the Hold Harmless Agreement for Contractor Review. FOR CURRENT PL84-99 MATOC HOLDERS ONLY!!!!! Request for Task Order Proposal for Big River Trap 31 CP Pilot Project. Project will construct an off-channel sediment trap at River Mile 31 of the Big River to establishcontrolled deposition of targeted lead-impacted sediments in the immediate vicinity of known freshwater mussel beds.ALL QUESTIONS SHALL BE SUBMITTED VIA THE BIDDER INQUIRY PORTAL in ProjNet at http://www.projnet.org/projnet. Offerors should submit questions by 9:00AM CDT, Monday, May 11, 2026.The site visit for this requirement will be 9 a.m. on 07 May 2026. Individuals are to meet at the red circle depicted on Attachment 4 ? Pre-Bid Site Visit Map. Accordingly, offerors are urged and expected to inspect the site where the work will be performed. Following the site visit potential offerors are encouraged to submit any questions in accordance with the solicitation instructions.Your proposal due date is 22 May 2026 at 10:00 a.m. CDT.

Similar Contracts

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a comprehensive renovation and enhancement of airfield infrastructure at the Port of Seattle, focusing on critical safety, operational efficiency, and environmental compliance improvements. Key components include replacing aging airfield lighting circuits with poor megger readings with modern LED fixtures and signs to improve visibility and reliability while reducing energy consumption and maintenance needs. Simultaneously, failing pavement sections and essential utility systems will be replaced to maintain structural integrity and ensure uninterrupted airfield operations. Wildlife hazard mitigation is addressed through the removal of turf edge dams along runways, taxiways, and access roads, the installation of anti-perching devices on signage to deter birds, and the implementation of regrading and storm drainage infrastructure to eliminate ponding that attracts hazardous wildlife. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid and unimpeded access for emergency response teams. This project is part of a larger initiative under the Airfield 2029 All Projects classification and is being managed by the Aviation Project Management Group within the Port of Seattle. The work is critical to sustaining airfield safety, regulatory compliance, and long-term operational readiness. The solicitation was posted on July 4, 2026, and is classified under NAICS code 237990 for other heavy and civil engineering construction. Primary point of contact for inquiries is Yanet Maldonado of the Port of Seattle, reachable via phone or email provided in the contract details. All work is expected to be performed at the airport facility, with no specific set-aside designation indicated, and interested parties are directed to the official portal for further submission requirements and documentation.
Aviation Project Management Group

POSTED

about 6 hours ago

DEADLINE

N/A
View Details