Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on March 3, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bldg 87 Exterior Door Replacement

Awarded
FA4419-09-T-0105Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

Contract Value

$31,450

NAICS

423390 - Other Construction Material Merchant Wholesalers

Place of Performance

308 N 1st Street, Suite 2301, ALTUS AFB, OK, 73523, USA

Set-Aside

NONE

Award Issued Date

Documents

3

SOW - Replace Exterior Doors, Bldg 87, Altus AFB

DOC, High priority: read this firstsow
High

MAP.jpg

JPG

SoW+Pictures.doc

DOC

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline time changed from 10:30 PM UTC to 9:30 PM UTC on Jan 22, 2009. The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4419 97 Conf Cc
Contacts2 people available
OfficeALTUS AFB, OK, 73523-5002, USA
Office AddressALTUS AFB, OK, 73523-5002, USA
Contacts
Michael F SchumanContracting Officer

Full Description

Show more
Questions and Answers: Building 87 Exterior Doors Site Visit 12 January 2009 FA4419-09-T-0105 Q: Will the contractor be responsible for - headers (door frame) on the doors with surrounding glass? A: No. The word - headers in the Statement of Work (SOW) refers to the removable stop on the inside of the door frame. Q: Is the contractor responsible for removing the magnetic locks on the doors, and replacing them after installation? A: No, the Building 87 facility manager is responsible for removing and replacing of the magnetic locks. The contractor is responsible, however, for ensuring the doors have a place and necessary reinforcement (per SOW part 2.1) for the magnetic locks to be re-installed. Q: How much notice does the facility manager need to ensure the magnetic locks are removed before work starts? A: It is recommended to make contact with the facility manager at least a day before work starts. Work on each entrance must be started and completed on the same day, as no temporary enclosures are permitted, due to possible security breaches per SOW part 3. Q: Does the glass for the doors require any special treatment, or need to be a specific type of glass? A: Yes. Refer to SOW 2.7 for complete description of the required specifications for the glass. Q: Does the threshold need to meet any specifications? A: Yes, the thresholds should match the existing ones, being brushed aluminum. Q: Do the doors need a specific type of weather stripping on the bottom? A: Yes, the weather stripping should be brush type or equivalent on all doors, including the emergency door. Q: Is a specific type of hinge required on the emergency door? A: Yes, only a continuous hinge is permitted for the emergency door. Q: Do the stops on the emergency door need to be replaced? A: Yes. Q: Does the contract include the interior doors on the double entryways? A: No, the contractor is only responsible for the replacement of exterior doors. Q: Do the requirements listed at the beginning of SOW part 2.1 apply to all doors? A: Yes, the requirements listed apply to all door types, to include the emergency door. NOTE: For all double doors (Door Type B) keyed, removable mullions are required, as specified in the SOW part labeled - Type B (Entrances 1, 4, and 6).

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS