Blue Springs Winwater and Flex Development
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
EPIC Concrete Construction is seeking subcontractor bids for the development of two new buildings at Winwater in Blue Springs, Missouri. The project consists of a 20,400 square foot two-story office and warehouse with a mezzanine and a 19,000 square foot single-story flex space featuring nine tenant suites. Work is expected to begin on November 2, 2026, with a projected completion date of May 31, 2027. Bids are due by October 21, 2026, at 5:00 PM CDT, with pre-bid RFIs required by October 16, 2026. Requested trades include a wide range of interior and exterior finishes, MEP services, and site work such as paving and landscaping. EPIC will self-perform concrete, earthwork, and site utilities, while PEMB packages and security systems are sole-sourced. Submissions must provide lump-sum pricing per building and clearly state all inclusions and exclusions.
General Info
Place of Performance
Blue Springs, MO, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Interested Companies (7)
See All 7 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description
Number 10052026
Bids Due Oct 21, 2026 at 5:00 PM CDT
Location 2601 Northwest Jefferson Street, Blue Springs, MO 64015
Pre-Bid RFIs Due Oct 16, 2026 at 12:00 PM CDT
Expected Start Nov 2, 2026
Expected Finish May 31, 2027
Architect Powell CWM
Project Description below:
EPIC Concrete Construction, as developer and general contractor, is requesting subcontractor bids for two new buildings at Winwater in Blue Springs, MO.
· Winwater Office: a two-story office and warehouse of about 20,400 SF, with a 1,764 SF mezzanine and a sprinklered pre-engineered metal building shell.
· Flex Spaces: a single-story building of about 19,000 SF with nine tenant suites. It is a sprinklered grey-box shell, and tenant fit-out is by others.
Trades requested:
· Both buildings: structural and misc. steel, rough carpentry, insulation, sealants and flashing, doors, frames and hardware, overhead doors, storefront and glazing, metal framing and drywall, acoustical ceilings, flooring, painting, stone veneer, CMU trash enclosure, toilet accessories and signage, fire sprinkler (design-build), plumbing, HVAC, testing and balancing, and electrical.
· Site: asphalt paving, striping, fencing, landscaping and site lighting.
Not part of this bid: EPIC is self-performing concrete, earthwork and site utilities. Both PEMB packages are sole-sourced to MAR Building Solutions, and the security systems (video surveillance, access control and vehicle gate access control) are sole-sourced to Kenton Brothers Systems for Security. Electrical, fencing and gate bidders must coordinate rough-in, power and gate locations with Kenton Brothers.
Bid documents: Architectural and MEP bid sets for Flex, architectural plans for Office, and Site Civil Plans Rev 2 (9-29-26).
Bids due: Wednesday, October 21, 2026 at 5:00 PM CT.
Submission: Submit lump-sum pricing by building, with alternates listed separately. State all inclusions, exclusions and clarifications. Direct questions in writing to Bart Fisher, 816-861-3300, bart@epiccc.com or Casey Williams, 816-935-4239, casey@epiccc.com.
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
