BM01 Culvert Replacement Project

Closed
BM01-0403State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423860
New
NRP,SON LNCH DIST V — 1680016443714 — SPRPA127QWA20
Solicitation # SPRPA127QWA20
Solicitation SPRPA127QWA20 is an emergency acquisition issued by the Department of the Navy via the DLA Aviation office in Philadelphia for the procurement of NSN 7RH 1680-01-644-3714 CB, described as NRP, SON LNH DIST V. The requirement specifies a delivery timeline of 90 days with shipping terms set as FOB Destination. Inspection and acceptance will occur at the origin. The government intends to make a single award to a technically acceptable offeror, with the evaluation prioritizing past performance over price. Risk assessments may be conducted using the DoD Supplier Performance Risk System to evaluate item, price, and supplier risks. The contract mandates strict adherence to military packaging and marking standards, including MIL-STD-2073-1 for system stock and MIL-STD-129 for labeling. Specific requirements are outlined for electrostatic discharge protection per ANSI/ESD S20.20-2021 and shelf-life markings, requiring at least 85 percent of the Navy shelf-life to remain upon receipt. Administrative requirements include the use of the Wide Area WorkFlow system for electronic invoicing and payment requests. Compliance with the Buy American Act and safeguarding covered defense information under DFARS 252.204-7012 is required. Offerors must provide current catalogs or price lists and validate their status in the System for Award Management.
Pa DLA Aviation At Philadelphia

POSTED

5 days ago

DEADLINE

in about 17 hours
NAICS: 423860
SLED
RFQ-171-270000000015-2 | 472/23129.KMM; Woodland C.F. - Site Mechanical Underground
Solicitation # 472/23129
Solicitation 472/23129.KMM is a project managed by the Michigan Department of Technology, Management and Budget for site mechanical underground work at the Woodland Correctional Facility in Whitmore Lake, Michigan. The scope of work involves updates to the sanitary sewer and water main systems, requiring contractors to handle utility location, hydro excavation, dewatering, and project phasing. Bidders must adhere to specific technical specifications and obtain necessary permits from agencies such as DLARA, MDOT, and EGLE. Due to the secure nature of the Michigan Department of Corrections facility, all personnel requiring access to the secure perimeter must undergo a background check via a LEIN request. The bidding process requires submissions through the SIGMA VSS portal, with a final response deadline of November 18, 2026. Key requirements include proof of State Project Registration and attendance at a mandatory site walk-through. The project incorporates specific guidelines from a geotechnical data report regarding soil conditions and trenchless crossings for water mains. Additionally, the contract includes a material allowance in the bid schedule and mandates compliance with MDOC utility and security shut down standards, as well as responsibilities for restoring areas disturbed during previous construction phases.
DTMB

POSTED

9 days ago

DEADLINE

in 22 days
NAICS: 423860
SLED
Locomotive Overhaul Kit
Solicitation # 195772A
Metra is soliciting bids under solicitation number 195772A for the procurement of Locomotive Overhaul Kits to support the in-house rehabilitation and modernization of F40PH-3 locomotives. This indefinite quantity contract is established for a five year period with a total value not to exceed 19 million dollars. The award will be granted to the lowest responsive and responsible bidder based on gross individual unit prices or the gross bid total. Key requirements for responsiveness include bidding on all items, providing a signed contract signature page, acknowledging all addenda, and submitting a correctly executed Buy America Certificate for FTA funded procurements exceeding 150,000 dollars. The scope includes the provision of materials and overhaul kits delivered F.O.B. Destination within the Chicagoland Six County Area, specifically to the 47th Street Maintenance Facility. Pricing must be all inclusive of packaging, transport, handling, and remanufactured costs. The contract mandates a one year warranty period and requires compliance with various federal and state regulations, including 49 CFR Part 26 for Disadvantaged Business Enterprises, the Americans with Disabilities Act, and FTA Circular 4220.1G. Bidders must provide notarized non collusion affidavits and certifications regarding debarment and suspension. The successful contractor is responsible for performing all inspection and acceptance testing of items prior to delivery.
Metra

POSTED

15 days ago

DEADLINE

in 13 days
NAICS: 423860
International
Multiple Victoria-Class Spares - Anti- Flash Device, Cooler,Fluid,Industrial, Cartridge,Check Valve, Parts Kit, Fluid Pressure Filter, Valve, Safety Relief
Solicitation # W8482-275589/A
The Department of National Defence is soliciting proposals under solicitation number W8482-275589/A for the procurement of various Victoria-Class spares. The required items include anti-flash devices, industrial fluid coolers, check valve cartridges, fluid pressure filter parts kits, and safety relief valves. These components are to be delivered in equal quantities to CFB Esquimalt and CFB Halifax. All goods must be new and delivered Free Carrier (FCA) per Incoterms 2020. Bids are due by November 9, 2026, at 14:00 EST, with the Department of National Defence reserving the right to negotiate delivery dates around March 31, 2027. The contract mandates strict quality and packaging standards, including specific marking requirements for manufacturer names and part numbers, and the use of PDF417 bar code symbols for unique identification. Certain items require permanent stamping or etching and must adhere to specific shelf-life requirements, ensuring at least 75 percent of the authorized shelf life remains upon delivery. Bidders proposing equivalent or substitute products must provide comprehensive technical specifications and compliance statements to prove full interchangeability. Payment for undisputed invoices will be issued within 30 days of receipt.
Department of National Defence

POSTED

about 1 month ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The BM01 Culvert Replacement Project involves the removal of an existing culvert and the fabrication and installation of a new precast concrete box culvert with wingwalls, alongside approach roadway work that follows the existing alignment. The scope includes re-establishing superelevation, installing erosion and sediment controls, pavement markings, scour protection, and guide rails, with vehicular and pedestrian traffic detoured during construction. The project is overseen by the Allegheny County Department of Public Works in Pennsylvania, with an estimated contract size between $500,000 and $1.5 million, and a completion deadline of September 30, 2026. The solicitation was posted on November 7, 2025, with responses due by December 3, 2025, and bids are to be submitted electronically via Bonfire. The contract documentation emphasizes compliance with multiple technical and environmental standards, including PennDOT and AASHTO design specifications, environmental permits, and special provisions for materials like rock lining, stream diversion, and environmental protection measures. It incorporates detailed requirements for environmental compliance, such as clean diesel standards, concrete washout procedures, and stream bypass systems, alongside strict adherence to prevailing wage laws and minority/women business enterprise participation goals. Bidders must certify their prequalification, submit detailed subcontractor and supplier commitments, and demonstrate good faith efforts toward MBE/WBE participation. The project also mandates comprehensive record-keeping, utility coordination, and environmental monitoring, with specific provisions for inspection, acceptance, and payment processes. The procurement process involves a formal bid opening, with evaluation based on responsiveness and compliance with the outlined requirements, although explicit evaluation factors are not detailed in the available documents. Overall, the project entails a complex integration of structural, environmental, and administrative standards aimed at ensuring a high-quality, compliant construction effort within the specified timeline and budget parameters.

Documents

56

BM01 Culvert Replacement Contract Description of Work

PDF, High priority: read this firstsow
High

BM01 Culvert Replacement Project Advertisement for Bids

PDF, High priority: read this first2 pages · ifb
High

BM01 Culvert Replacement Project - Advertisement for Bids BM01-0403

PDF, High priority: read this firstadvertisement-for-bids
High

Precast Reinforced Concrete Box Culvert Section 8510 0001

PDF, High priority: read this first5 pages · sow
High

Section 0108 - Performance and Progress

PDF, High priority: read this first1 page · sow
High

Temporary Stream Diversion Channel Bypass Section 9000-0004

PDF, High priority: read this first2 pages · sow
High

11-0066A Notice to Bidder

PDF, Low priority1 page · other
Low

12-0066G Clean Diesel Specification

PDF, Low priority5 pages · other
Low

13-0066B Governing Specifications and Special Provisions

PDF, Low priority1 page · other
Low

16-0101 Abbreviations and Definitions of Terms

PDF, Low priority4 pages · other
Low

17-0102 Bidding Requirements and Conditions

PDF, Low priority4 pages · other
Low

18-0100 - General Provisions

PDF, Low priority1 page · other
Low

19-0110 Payment Section 0110 Special Provision

PDF, Low priority3 pages · other
Low

31-9000-0001 Compost Filter Sock Concrete Washout Pit Section

PDF, Low priority1 page · other
Low

44-0025 Instructions to Bidders

PDF, Low priority1 page · other
Low

53-0103 Award and Execution of Contract Section 0103

PDF, Low priority3 pages · contract-document
Low

7-0050B Bidder's Bond Instructions

PDF, Low priority1 page · other
Low

9-0065 Special Provisions Section

PDF, Low priority1 page · other
Low

Anticipated Notice To Proceed Date - Section 0066D

PDF, Low priority1 page · other
Low

Bidder Certification of Prequalification and Work Capacity - CS-4309

PDF, Low priority1 page · other
Low

Bidders Understanding of Conditions Section 0035

PDF, Low priority1 page · other
Low

BM01-0403 Construction Plans for Beam Run Bridge No. 1

PDF, Low priority52 pages · other
Low

BM01-0403 Culvert Replacement Contract Proposal

PDF, Low priority8 pages · other
Low

BM01-0403 Culvert Replacement Project Bidder's Bond

PDF, Low priority3 pages · contract-document
Low

BM010403 Dowel Holes 10 in Depth Modified Special Provision

PDF, Low priority1 page · other
Low

BM01-0403 GP-11 Permit Plans 12-21-22

PDF, Low priority3 pages · other
Low

BM01-0403 MBE-WBE Subcontractor Supplier Solicitation Sheet

PDF, Low priority1 page · other
Low

BM010403 Project Directory Section 0010

PDF, Low priority2 pages · other
Low

BM010403 Special Drawings and Special Design Requirements

PDF, Low priority3 pages · other
Low

BM010403 Survey Marker Special Provision

PDF, Low priority1 page · other
Low

BM01 Bridge Identification Plaque Special Provision

PDF, Low priority1 page · other
Low

BM01 Culvert Replacement Contract Component Item Schedule

PDF, Low priority4 pages · other
Low

BM01 Culvert Replacement Project MBE/WBE Goals Attainment Certification

PDF, Low priority1 page · other
Low

BM01 Culvert Replacement Project - Title Page

PDF, Low priority1 page · other
Low

Control of Work Section 0105 Special Provision

PDF, Low priority3 pages · other
Low

DBE Participation Confirmation Form for BM01 Culvert Replacement Project

PDF, Low priority1 page · other
Low

GP11 Approval Package 4-14-2023 - Beam Run Bridge No. 1 Culvert Replacement

PDF, Low priority26 pages · contract-document
Low

Letter of Assent Attachment C for BM01 Culvert Replacement Project

PDF, Low priority1 page · contract-document
Low

List of Subcontractors Section 0050A2 CS-4309

PDF, Low priority1 page · other
Low

Local Authority Contract Section 0066E

PDF, Low priority1 page · contract-document
Low

MBE-WBE Subcontractor Supplier Commitment Sheet for BM01-0403

PDF, Low priority1 page · other
Low

Prevailing Wage Act Section 0066C

PDF, Low priority1 page · other
Low

Prevailing Wage Rates for Beam Run Bridge No. 1 Replacement Project 25-09845

PDF, Low priority5 pages · other
Low

Public Work Employment Verification Act Section 0066F

PDF, Low priority1 page · other
Low

Public Works Employment Verification Form Attachment E

PDF, Low priority1 page · other
Low

Schedule of MBE/WBE/DBE Participation Attachment A

PDF, Low priority1 page · other
Low

Section 0066H Right-To-Know Law Contract Provisions

PDF, Low priority2 pages · contract-document
Low

Section 0107 Legal Relations and Responsibility to the Public

PDF, Low priority16 pages · other
Low

Section 0112 - Project Records

PDF, Low priority1 page · other
Low

Section 901 Maintenance and Protection of Traffic Rev 2-7-2025

PDF, Low priority11 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Allegheny County Department of Public Works
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
This work involves the removal of the existing culvert and fabrication and installation of a new precast concrete box culvert with precast wingwalls. The project also includes approach roadway work following the existing alignment and re-establishment of the superelevation, erosion and sediment controls, pavement markings, scour protection and guide rail. Vehicular and pedestrian traffic will be detoured to construct this project.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS