Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Boathouse Construction and Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entails the fabrication and installation of a new 16-foot by 40-foot boathouse designed to be supported by marine pilings, with construction requiring either crane or barge assistance to position and secure the structure. The project is classified under NAICS code 236220, indicating it falls under marine construction, and is structured as a subcontract within the broader scope of work managed by Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova, in California. The boathouse will be constructed to meet specific maritime environmental and structural standards, ensuring durability in a coastal or water-adjacent setting with exposure to tide, wind, and salinity. The work must be completed with precision to ensure stability and safety, leveraging specialized equipment for offshore or waterfront installation, and aligning with regional permitting and ecological requirements. The posting date of July 1, 2026, suggests this is a forward-looking procurement, potentially tied to upcoming seasonal timelines or federal funding cycles. The project's location and purpose indicate it supports wildlife management, recreational access, or operational needs for agency vessels or personnel, with all construction activities subject to compliance with state and federal environmental regulations governing waterfront development.

General Info

Fabricate and install 16x40ft boathouse on marine pilings using crane or barge, per maritime standards in California.

Agency

California → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of LAK-63787-R2.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Yeandle Boathouse (Lake Alteration Agreement EPIMS Notification No. LAK- 63787-R2)

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Fabrication and installation of a new 16-ft by 40-ft boathouse on marine pilings using crane or barge support.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
This subcontract opportunity is for the complete renovation of bathroom areas in two dormitory buildings at the Northlands Job Corps Center in Vergennes, Vermont. The project involves the renovation of four bathroom areas totaling approximately 944 square feet in Building 17 and five bathroom areas totaling approximately 1,260 square feet in Building 18. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED vanity lighting. All work must comply with ADA, OSHA, and National Electrical Code standards. To maintain center operations, contractors must follow a phased sequencing plan, renovating the dormitories one at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a completed bid sheet with an itemized cost breakdown separating labor and materials, a detailed project schedule specifying calendar days and working hours, current Vermont professional licensing, and certificates of insurance. The award is not based solely on the lowest bid, as Education and Training Resources serves as the sole judge of technical alignment and risk. Winning bidders must be registered in Sam.gov with a Unique Entity ID and provide a 100 percent performance and payment bond. The contract adheres to various Federal Acquisition Regulations, including the Davis-Bacon Act and the Service Contract Act, with standard payment terms of net 30 days following the completion of a signed punch list and submission of warranties.
Northlands Job Corps Center /ETR

POSTED

about 10 hours ago

DEADLINE

in 8 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation by J & J Contractors, Inc. is for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base in New London, Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G, and one Box H earth-covered high-explosive magazines. The scope includes comprehensive site work such as clearing, rock excavation, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building. Specialized requirements include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The contract requires pricing for a wide array of trades, including demolition of 18 existing magazines and two buildings, concrete, masonry, structural steel, roofing, electrical utilities, and mechanical systems. Paving for access roads and truck loading areas is also required. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must submit their responses by October 31, 2026, and should contact Rahul Maheshwari for bid invitations and documentation.
J & J Contractors, Inc

POSTED

about 10 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 236220
New
Federal
N33191-26-R-0032 D-B Maritime Center of Excellence Phase III Tunisia
Solicitation # N3319126R0032
Solicitation N33191-26-R-0032 is a firm fixed price design-build contract issued by NAVFACSYSCOM Europe Africa Central for the development of the Maritime Center of Excellence Phase III at the Tunisia Navy Base in Bizerte, Tunisia. The project has an estimated magnitude between 1,000,000 and 5,000,000 dollars and a total performance period of 600 calendar days, with work beginning within 10 days of award. The scope is divided into two primary phases, design and construction, and includes the delivery of a steel-framed rappelling tower and a helicopter landing zone as base bids, with optional requirements for a vehicle and equipment boat storage facility and a boat launch slipway with a small floating dock. All work must comply with Tunisian architectural and engineering codes, maintain local aesthetic character, and integrate sustainable design principles. Proposals are evaluated based on a cost efficiency ratio, focusing on the lowest priced technically acceptable offers. Evaluation factors include technical approach, corporate experience, safety, and past performance. Offerors must be registered in the System for Award Management and the Joint Contingency Contracting System for the AFRICOM area of responsibility. The contract requires the provision of performance and payment bonds and mandates strict adherence to safety standards, including the designation of an on-site Site Safety and Health Officer. Final acceptance is contingent upon an on-site inspection by the NAVFAC Contracting Officer's Representative and the beneficiary. Payment will be processed electronically through the Wide Area WorkFlow system.
Navfacsyscom Europe Africa Central

POSTED

about 14 hours ago

DEADLINE

in 8 days
View Details