Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Georgia was posted on August 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Boiler Equipment Supply

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract calls for the supply of two Patterson-Kelley Modufire N1500MFD boilers, each rated at 1,500,000 BTU and designed as non-condensing units, with mandatory compliance to ASME Section IV and ANSI Z21.13/CSA 4.9 standards. No substitutions for these specific models are permitted, ensuring exact technical specifications are met. The equipment is being procured under a subcontract solicitation issued by the City of Albany in Georgia, with the NAICS code 333414 indicating classification within boiler and heat exchanger manufacturing. All responses must be submitted by the deadline of August 21, 2026, and the solicitation was posted on August 7, 2026. The place of performance and detailed contact information are not specified, and the contract is managed through the Georgia Department of Administrative Services portal.

General Info

Two Patterson-Kelley Modufire N1500MFD boilers, 1.5M BTU each, ASME and ANSI compliant, due August 21, 2026.

Documents

This scope was carved out of 26-050-R.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Bid Ref. #26-050-R Boiler Replacement 225 Judicial Building

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Albany
ContactsNo contacts available
OfficeN/A
Organization / AgencyGeorgia → City of Albany
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of two Patterson-Kelley Modufire N1500MFD 1,500,000 BTU non-condensing boilers with ASME Section IV and ANSI Z21.13/CSA 4.9 compliance. No substitutions allowed.

More opportunities from Georgia → City of Albany

Same awarding agency

NAICS: 541330
New
SLED
27-034 ROADWAY ENGINEERING AND TRAFFIC SIGNAL DESIGN SERVICES
Solicitation # 27-034
The City of Albany, Georgia, is soliciting qualified professional engineering firms to provide roadway engineering and traffic signal design services for various citywide improvements. The scope of work includes the full project lifecycle, from concept development and preliminary engineering to final design and right-of-way acquisition. Specific technical requirements encompass sidewalk installation, intersection improvements, roundabout design, traffic calming devices, signal timing studies, and traffic impact studies per GDOT criteria. The selected consultant will also provide support services such as surveying, environmental studies, utility coordination, and construction phase inspection. Selection will be conducted in accordance with the Brooks Act, focusing on the most highly qualified firms based on a review of professional certifications, past performance on similar projects, proposed methodology, and management capability. Interested firms must submit one original labeled copy, one electronic PDF copy, and five hard copies by November 23, 2026, at 5:00 p.m. to the Procurement Division. Submissions must be clearly marked as a Sealed Submittal and include required certifications regarding non-collusion, drug-free workplaces, and federal debarment status. The contract anticipates using Engineers Joint Contract Documents Committee standards and requires the consultant to maintain comprehensive insurance, including general liability, professional liability, and product liability, each with limits of at least 1 million dollars. Additionally, firms must comply with the Georgia Security and Immigration Compliance Act and agree to the governing law and venue of Dougherty County, Georgia. The City strongly encourages participation from small businesses and Disadvantaged Business Enterprises.
Engineering Services

POSTED

4 days ago

DEADLINE

in 28 days
View Details
NAICS: 238220
SLED
RFP #27-031 DOCO Jail HVAC Rebuild & Cooling Tower Installation
Solicitation # 27-031
The City of Albany is soliciting competitive sealed proposals under RFP #27-031 for the HVAC rebuild and cooling tower installation at the Dougherty County Jail. The scope of work includes replacing existing units with new Marley stainless-steel towers featuring internal walkways and providing all necessary labor, materials, and rigging. The contractor may be required to provide temporary rental towers or air-cooled chillers during the transition. Key technical requirements include a full load cooling efficiency of 0.5423 kW/ton for the chiller, a 24-hour standing pressure test before service, and a five-year warranty on installed equipment. Proposals must be submitted in writing, consisting of one original and six copies, to the Procurement Division by 5:00 PM on November 13, 2026. Award decisions will be based on a weighted evaluation of experience and qualifications (35%), references and portfolio (30%), project approach and understanding (25%), and the fee proposal (10%). Qualified firms must demonstrate financial stability, maintain a permanent office, and provide at least three references from the past seven years. Insurance requirements include $1,000,000 per occurrence for automobile, general, and errors and omissions liability, with a $2,000,000 annual aggregate, as well as statutory workers compensation. Additionally, the successful contractor must comply with the Georgia Security and Immigration Compliance Act and the Federal Work Authorization Program. The contract allows for termination for convenience with 60 calendar days' written notice.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

11 days ago

DEADLINE

in 18 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS