Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Michigan was posted on September 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Boiler System Removal and Disposal

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Rockford Public Schools in Michigan is seeking a subcontractor for the Boiler System Removal and Disposal project. The scope of work involves the safe disconnection, dismantling, and removal of existing boiler system components, including all associated piping, controls, and ancillary equipment. The selected contractor is responsible for the transport and disposal of all materials in strict accordance with environmental regulations. This opportunity was posted on September 26, 2025, and requires responses to be submitted by the deadline of October 16, 2025. The project is categorized under NAICS code 238990. Interested parties can find further details through the provided Sigma Michigan portal link.

General Info

Rockford Public Schools seeks a subcontractor for boiler system removal and disposal by October 16.

Documents

This scope was carved out of RFQ-RPS-250000000655-1.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

High School Boiler Replacement Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 15 days
  • PURIFIED WATER REPLENISHMENT SAN JACINTO VALLEY ADVANCED WATER PURIFICATION FACILITY SPECIFICATION NO. 1472WOpen now, due in 2 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMichigan → Rockford Public Schools
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Safely disconnect, dismantle, and remove existing boiler system components, including piping, controls, and ancillary equipment. Transport and dispose of materials in compliance with environmental regulations.

More opportunities from Michigan → Rockford Public Schools

Same awarding agency

NAICS: 238210
SLED
RFQ-RPS-270000000039-1 | Uninterruptible Power Supply
Solicitation # 3112
Rockford Public Schools is soliciting bids for the turnkey installation of a District Data Center Uninterruptible Power Supply (UPS) at the Rockford Freshman Center in Rockford, Michigan. The scope of work includes the demolition and disposal of the existing 3-phase UPS and all associated electrical work. The required equipment is a modular, scalable, and digital UPS, specifically a Vertiv AMP2 (Model 56SC030BNCNNA06) or an approved equal, rated at 30 KVA with 15 KVA capacity. The system must comply with Energy Star 2.0, UL listing, FCC Rules and Regulations Part 15, and IBC 2021 seismic ratings. All work must be performed by manufacturer-trained personnel, and the contractor is responsible for providing as-built drawings, instruction manuals, and certified test results. Bids are due by November 24, 2026, following a pre-bid meeting on November 5, 2026. Submissions must be provided in both a bound hard copy and on a USB drive, organized into four sections: Forms, Overview, Submittals, and Appendices. Required documentation includes a Michigan Familial Relationship Disclosure Statement, an Iranian Economic Sanctions Form, and references for at least three similar projects completed within the last two years. A 5% bid security is required with the proposal, and the selected contractor must provide performance and payment bonds equal to 100% of the bid amount. Payments will be processed monthly via approved AIA Payment Request Forms, subject to a 10% retainage until final project closeout.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

21 days ago

DEADLINE

in 7 days
View Details
NAICS: 238210
SLED
RFQ-RPS-270000000039-1 | Uninterruptible Power Supply
Solicitation # 3112
Rockford Public Schools is soliciting bids for the provision and installation of a modular, scalable, and digital Uninterruptible Power Supply (UPS) system. The project scope includes the full installation, certification, and support of a system designed to maintain AC power to critical loads during mains power failure. The system must be solid-state with sealed power semiconductors and comply with Energy Star 2.0, FCC Rules and Regulations Part 15, and IBC 2021 seismic ratings. The period of performance for this FY27 E-rate project spans from April 1, 2027, through September 2028. Bidders must submit their responses in both a bound hard copy and on a USB drive, organized into four sections: Forms, Overview, Submittals, and Appendices. Required documentation includes a bid bond equal to 5% of the total bid, a Michigan Familial Relationship Disclosure Statement, and an Iranian Economic Sanctions Form. Evaluation is based on technical compliance, a proven track record of at least three similar projects completed within the last two years, and manufacturer-qualified personnel. Awarded contractors must provide performance and payment bonds equal to 100% of the bid amount. Invoicing is conducted monthly based on the percentage of work completed, with a 10% retainage held until final project closeout.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

21 days ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS