Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Kentucky was posted on May 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Boone County Water Expansion Group 3.1

Closed
BCFY26-72State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveys, preconstruction video, and traffic control. Norstar Plumbing and Engineering, Inc. is managing the solicitation and is specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website, and coordination is handled by primary points of contact Nathan and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 6 hours ago

DEADLINE

in about 19 hours
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, site grading, and the provision of a fully operating pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with responsiveness contingent upon the submission of a completed EJCDC C-410 Bid Form, a bid bond, and required MWBE documentation, including a Good Faith Efforts Form and Table A. The contractor must provide performance and payment bonds equal to the contract price and maintain insurance with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to achieve substantial completion. Payments are processed monthly via applications for payment submitted to the Engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Bids will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 21 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of the Mountain Avenue Lift Station with two submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operational service. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. All bids and quotes must be submitted by October 29, 2025, at 2:00 PM.
Filanc

POSTED

about 6 hours ago

DEADLINE

in about 19 hours

AI Contract Overview

Show more

The Boone County Fiscal Court is soliciting bids for the Boone County Watermain Expansion – Group 3.1 project, involving the installation of approximately 19,700 linear feet of 8-inch ductile iron watermain along with all related materials, labor, and equipment. Bids are to be submitted electronically through the Open Gov procurement website by May 20, 2026, at 2:00 p.m. local time, with no late submissions accepted. Bidders must provide a bid bond equal to 5% of their bid and, upon award, furnish a performance surety bond for 100% of the contract amount. The project scope includes compliance with detailed design and construction specifications consistent with AWWA standards, Kentucky Department of Transportation guidelines, and local health and safety requirements. Key deliverables include installation, hydrostatic testing, disinfection, record documentation, shutdown scheduling, and site restoration, all subject to strict owner inspection and acceptance procedures. Award evaluation will be conducted using a best-value trade-off process, which balances price with responsibility factors such as financial stability, relevant experience, performance history, licensing, equipment adequacy, and integrity. Responsiveness to bid requirements is mandatory, and bidders failing to meet required documentation or qualifications will be disqualified. The contractor must coordinate closely with utility companies, implement traffic control for public safety, and comply with safety and sanitation provisions. Payment is to be processed within 30 days of invoice submission, which requires notarized original copies and is conducted manually rather than electronically. Insurance coverage proofs and W-9 tax forms are mandatory, with additional certification required if claiming Disadvantaged Business Enterprise status. The contract will be firm fixed price, with FOB destination delivery terms, and includes provisions prohibiting blasting unless authorized and mandating approved material substitutions. The project site is within Boone County, Kentucky, and administration will be handled through the Boone County Fiscal Court offices in Burlington. Key contract documents and detailed bid specifications are available electronically through the official procurement portal.

General Info

Boone County seeks bids for 19,700 feet watermain installation; submit by May 20, 2026.

Documents

10

Appendix C BCWME Group 3.1 Bid Plans Geotechnical Notes

PDF, High priority: read this firstspecifications
High

Boone County Water District Water Main Design Specifications

PDF, High priority: read this firstspecifications
High

Boone County Water Expansion Group 3.1 Invitation to Bid BCFY26-72

PDF, High priority: read this firstitb
High

Boone County Water Expansion Group 3.1 Permit Conditions

PDF, High priority: read this firstpermit-conditions
High

Boone County Water Main Expansion Group 3.1 Bid Specifications

PDF, High priority: read this firstifb
High

Boone County Water Main Expansion Group 3.1 Bid Specifications

DOCX, High priority: read this firstrfb
High

Geotechnical Exploration Report Boone County Water Main Expansion Group 3.1

PDF, High priority: read this firstgeotechnical-report
High

KYTC Encroachment Permit Completion Notice 06-2025-00955

PDF, High priority: read this firstencroachment-permit
High

Boone County Water Expansion Group 3.1 KDOW Approval Letter

PDF, Low priorityapproval-letter
Low

KYR10 Coverage Acknowledgment Letter for Boone County Water Main Expansion

PDF, Low prioritypermit-coverage-letter
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKentucky → Public Works
Contacts2 people available
OfficeBurlington, KY, 41005, USA
Organization / AgencyKentucky → Public Works
Office AddressBurlington, KY, 41005, USA
Contacts
Robert FranxmanCounty Engineer
Greg CrabbeSenior Procurement and Compliance Specialist

Interested Companies (20)

RVi Planning + Landscape ArchitectureTampa, FL
Queen City MechanicalsCincinnati, OH
ConstructConnectCincinnati, OH

See All 20 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Boone County Fiscal Court invites the submittal of pricing bids for the Boone County Watermain Expansion – Group 3.1 project for the Boone County Fiscal Court. Electronic submission of offers will be accepted through the Open Gov website until May 20, 2026, 2:00 p.m. ("local time"), for the Boone County Watermain Expansion – Group 3.1 project which consists of the installation of approximately 19,700 LF of 8" watermain and appurtenances, including all labor, materials, and equipment necessary to complete the project. Late submissions will not be accepted by Boone County. A bid bond executed by the Bidder and acceptable sureties in an amount equal to five (5) percent of the bid shall be submitted (electronically) with each bid. The bidder to whom the contract is awarded will be required to furnish a surety bond in an amount equal to one-hundred percent (100%) of the contract amount. Bid security furnished in bond form shall be issued by a surety company or corporation licensed in the state of Kentucky to provide said surety.

More opportunities from Kentucky → Public Works

Same awarding agency

NAICS: 237310
SLED
FY 2027 Asphalt Resurfacing Program
Solicitation # BCFY27-17
The Boone County Fiscal Court is soliciting bids for the FY 2027 Asphalt Resurfacing Program, solicitation number BCFY27-17, to perform milling and paving services on identified county roads and streets. The scope of work includes improving profiles and cross sections using Class 2 Asphalt Surface 0.38D PG64-22, which involves milling existing pavement at a minimum width of six feet from the gutter line, road preparation, and the installation of trackless tack coat. The contractor is also responsible for adjusting manholes, drainage structures, and valve boxes, as well as providing pavement markings and temporary traffic control in accordance with KYTC and MUTCD standards. The project is scheduled for a purchase order issuance on December 1, 2026, with a final completion deadline of June 1, 2027. Eligibility is limited to contractors prequalified by the Kentucky Transportation Cabinet. Bidders must submit an electronic bid bond equal to 5% of the bid, and the successful awardee must provide a surety bond for 100% of the contract amount from a Kentucky-licensed surety. The contract will be awarded to the lowest responsive and responsible bidder, with considerations for Kentucky resident and qualified bidder preferences. Required submittals include a W-9 form, a certificate of insurance, and a Critical Path Method schedule. Performance is subject to strict quality inspections regarding mix design, compaction, and ride quality, with a penalty of 2,500 dollars per day for failure to complete the work by the final deadline.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in 14 days
View Details
NAICS: 336211
SLED
Animal Control Truck Upfits
Solicitation # 27-11
Kenton County Public Works is soliciting bids under solicitation number 27-11 for the purchase, installation, and delivery of two animal control upfits for 2026 Chevrolet Silverado 3500HD SRW trucks. The county requires either Jackson Creek Model CM17L units or an approved equivalent. These upfits must be constructed from all-aluminum to ensure durability, ease of sanitization, and a professional appearance. Key technical requirements include high-efficiency LED interior lighting wired to factory switches, the reinstallation of the factory rear camera, and the inclusion of one #222 Pet Step Folding Ramp per unit. Vendors are encouraged to provide advanced climate control integration, ergonomic escape-proof latches, and structural framing that minimizes vibration wear. The contract will be awarded to the lowest responsible bidder who meets all specifications. Bidders must submit their proposals by October 30, 2026, and provide a W-9, Certificate of Insurance, and a Kenton County Occupational License. All installations must certify compliance with Federal Motor Vehicle Safety Standards (FMVSS) and be delivered fully operational to the Public Works facility in Independence, Kentucky. Contractors must also adhere to the Kentucky Human Rights Act, the Employment Discrimination Act, and OSHA regulations. The county reserves the right to accept or decline credits for the removal of factory-installed beds.
Motor Vehicle Body Manufacturing

POSTED

12 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS