This Solicitation opportunity from Pennsylvania was posted on April 23, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Bristol Township is inviting sealed bids for the 2024 Curb Ramp Construction Replacement Program, with bids due electronically via the PennBid platform by 11:00 A.M. on May 13, 2024. The project involves installing ADA and PennDOT compliant curb ramps, along with necessary sidewalks, curbing, and sign relocations at designated locations within the township. All work must adhere to PennDOT Publication 408 and township standards, with detailed bid documents available at no cost through PennBid. Bidders are required to submit a bid bond or certified check equal to at least 10% of their bid, along with proof of insurance, and the successful contractor must furnish performance, payment, and maintenance bonds for 100% of the contract amount. The project is subject to Pennsylvania’s Prevailing Wage Act and the township’s Responsible Contractor Ordinance, with wage rates and other requirements applicable for projects exceeding $10,000 and $25,000 respectively. Bristol Township reserves the right to reject any or all bids, eliminate items, or waive informalities, and bids must remain valid for 60 days after opening. The contract will be managed by Sean Nagy, and additional details can be accessed through the PennBid link provided.
PDF, High priority: read this firstsubmission-instructions
HighAI Summary for 00 21 13.1 - Electronic Bidding Instructions: This document provides detailed instructions for bidders on how to use the PennBid electronic bid management system to respond to a Request-for-Quotation. It outlines the process for downloading documents, asking questions, submitting and updating bids, and lists the specific required documentation (such as Bid Bond, Non-Collusion Affidavit, and Contractor Responsibility Certification) that must be uploaded as a single electronic file or zipped folder.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for 00 41 00 Bid Form: A bid form document (00 41 00) used for submitting formal price proposals in a procurement process.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 33-Doc 00 01 15 List of Drawings: A list of project drawings including Mill Drive and Blue Ridge section ramp designs, a ramp location map, and details and notes.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Appendix A: Prevailing Minimum Wage Determination: This document is Appendix A, which specifies the prevailing minimum wage determinations for the procurement.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Appendix B: Public Works Employment Verification Form: A Commonwealth of Pennsylvania compliance form requiring contractors and subcontractors to affirm their use of the federal E-Verify Program (EVP) to verify employment eligibility for all employees hired post-January 1, 2013, in accordance with the Public Works Employment Verification Act.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Appendix B: Public Works Employment Verification Form: A Public Works Employment Verification Form (Appendix B) used to verify labor compliance and employment standards for public works projects.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Bristol Township Contract 2024-00279: 2024 Curb Ramp Construction Replacement Program: Table of Contents for the 2024 Curb Ramp Construction Replacement Program (Contract No. 2024-00279). The document outlines the procurement and contracting requirements, including bid forms, bonds, and general conditions, as well as technical specifications for concrete, earthwork, and exterior improvements.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for Contract 2024-00279 Bidder Qualification Statement: A mandatory Bidder Qualification Statement for Contract No. 2024-00279 (Bristol Township 2024 Curb Ramp Construction Replacement Program). The document requires bidders to provide organizational background, work history for similar projects over the last five years, financial statements, references, and a notarized affidavit of certification. Failure to submit this completed form may result in bid rejection.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Contract 2024-00279: Bristol Township 2024 Curb Ramp Construction Replacement Program: Advertisement for Bids for Contract 2024-00279 regarding the Bristol Township 2024 Curb Ramp Construction Replacement Program. The project involves installing ADA/PennDOT compliant curb ramps, sidewalks, and curbing. Sealed bids are due via PennBid by 11:00 A.M. on May 13, 2024. Requirements include a 10% bid bond, performance/payment/maintenance bonds, and compliance with the Pennsylvania Prevailing Wage Act and the Township's Responsible Contractor Ordinance.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for Contract 2024-00279: Bristol Township 2024 Curb Ramp Construction Replacement Program - Bidder Acknowledgement Form: This document is the Bidder's Acknowledgement Form (00 43 00) for the Bristol Township 2024 Curb Ramp Construction Replacement Program (Contract 2024-00279). It outlines the bidder's agreement to the contract terms, representations regarding site conditions and legal compliance, certifications against collusive practices, and a list of required attachments including bid bonds and insurance certificates.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract No. 2024-00279: Bristol Township 2024 Curb Ramp Construction Replacement Program: Project Manual for Contract No. 2024-00279 regarding the 2024 Curb Ramp Construction Replacement Program for Bristol Township, PA. Prepared by Gilmore & Associates, Inc. in April 2024.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Document 00 21 13 - Instructions to Bidders: This document provides the formal Instructions to Bidders for a construction project. It outlines the rules for bid submission, bidder qualifications, site examination procedures, and the evaluation process. Key articles cover bid security, liquidated damages, the use of PennBid for document access, and the responsibilities of the bidder regarding site conditions and technical data.
PDF
PDF, High priority: read this firstbid-bond
HighAI Summary for Document 00 43 13 - Bid Bond: A standard bid bond form requiring execution by the Bidder and Surety. It establishes a legal obligation to pay the Owner a penal sum if the Bidder defaults by failing to deliver the executed Agreement and required performance/payment bonds after being awarded the contract.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Document 00 73 00 - Supplementary Conditions: This document contains the Supplementary Conditions for a construction contract, amending and supplementing the EJCDC No. C-700 (2007 Edition) General Conditions. It defines key terms, establishes contract commencement timelines, outlines the schedule of values, and specifies requirements for contract documents, subsurface conditions, and project manuals. It also references compliance with the Pennsylvania Prevailing Wage Act and the Public Works Employment Verification Act.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Document 00 91 13 - Addenda: This document outlines the procedure for issuing addenda to bidding documents, specifying that they will be included in the initial package or emailed to parties who downloaded documents via the PennBid Program.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for EJCDC Standard General Conditions of the Construction Contract: Standard General Conditions of the Construction Contract prepared by the Engineers Joint Contract Documents Committee (EJCDC). This document establishes the legal and operational framework for a construction contract, covering definitions, bonds, insurance, contractor and owner responsibilities, change orders, payment terms, and dispute resolution.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Job 2024-00279: Curb Ramp Construction Details - Bristol Township: Technical construction specifications and detailed notes for curb ramp installation in Bristol Township, Bucks County, PA. Dated 04/18/2024, the document outlines ADA and PennDOT accessibility requirements, including slope tolerances, detectable warning surfaces (DWS), material standards (Publication 408), and specific geometric requirements for ramps and sidewalks.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Project 24-04063 - Bristol Township 2024 Curb Ramp Program Prevailing Wage Rates: Prevailing wage rate determination issued by the Bureau of Labor Law Compliance for the Bristol Township 2024 Curb Ramp Program (Project 24-04063). The document specifies hourly rates and fringe benefits for various labor classifications, including carpenters, iron workers, and laborers, with a determination date of 4/22/2024 and a contract award date of 5/16/2024.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Section 01 11 13 - Summary of Work (Curb Ramps): This document provides the Summary of Work for the installation of ADA/PennDOT compliant curb ramps within Bristol Township. It details the scope of work, including removal of existing curbs and sidewalks, installation of stone bases and truncated domes, utility elevation adjustments, and site restoration. It also outlines contractor responsibilities regarding site use, safety compliance (OSHA), and coordination with the owner and utility companies.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 22 00 - Measurement and Payment: This technical specification document outlines the measurement and payment criteria for work performed under a unit price payment method. It specifically details the requirements for the removal and replacement of ADA/PennDOT compliant concrete curbs, curb ramps, sidewalks, and truncated domes, including references to PennDOT Publication 408 and Township Standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 29 00 - Contract Considerations: Technical specification section 01 29 00 detailing contract administration requirements, including the submission of the schedule of values, monthly application for payment procedures (EJCDC Form C-620), change order procedures, and the handling of alternates.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 31 00 - Coordination and Meetings: Technical specification section 01 31 00 detailing requirements for project coordination, field engineering, and the administration of preconstruction and progress meetings, including required attendees and agenda items.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 32 16 - Narrative Construction Schedule: Technical specification section 01 32 16 detailing the requirements for the preparation, maintenance, and revision of the construction project schedule. It specifies the need for an initial schedule based on the Notice to Proceed date, required activity details (description, duration, dates), and a workday calendar. It notes that progress payments may be withheld until an acceptable schedule is submitted and approved by the Owner.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 32 36 - Audio-Videotaping: Technical specifications for the professional audio-visual recording of existing conditions for municipal construction projects. It details requirements for the electrographer's qualifications, equipment standards (NTSC, CCD cameras), recording procedures, and the delivery of DVD/CD copies to the Engineer.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 33 00 - Submittals: This technical specification section outlines the requirements and procedures for project submittals, including construction progress schedules, product data, shop drawings, samples, design data, test reports, and certificates. It defines the submission process, review timelines, and documentation standards required for the Engineer's approval and project closeout.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 40 00 - Quality Control: Technical specification section 01 40 00 detailing quality control requirements for a construction project. It covers quality assurance, installation tolerances, reference standards, mock-up requirements, testing laboratory services, observation services, and manufacturer field services, as well as execution requirements for examination and preparation of substrates.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 50 00 - Construction Facilities and Temporary Controls: Technical specification section 01 50 00 detailing requirements for construction facilities and temporary controls. It covers temporary utilities (electricity, sanitary), site barriers, fencing, water and dust control, security, progress cleaning, and the removal of temporary facilities upon project completion.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 55 26 - Traffic Regulation: Technical specification section 01 55 26 detailing the Contractor's obligations for traffic regulation and control. It covers the implementation of Traffic Control Plans, notification requirements for emergency services and residents, parking controls, flag person requirements, haul routes, and the installation and removal of traffic signs and signals.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 60 00 - Material and Equipment: Technical specifications section 01 60 00 detailing requirements for products, transportation, handling, storage, protection, and the formal process for requesting product substitutions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 70 00 - Contract Closeout: Technical specifications detailing the requirements for contract closeout, including final cleaning, adjusting, project record documents, and required documentation for final payment.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 02 41 16 - Demolition: Technical specifications for demolition work, including the removal of concrete curbs and sidewalks. The document outlines requirements for site protection, utility coordination (Pennsylvania Act 172), debris disposal, and restoration of damaged pavement.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 03 11 00 - Concrete Formwork: Technical specifications for concrete formwork, including requirements for shoring, bracing, materials (wood and accessories), and execution standards. It references ACI 318 and ACI 347 standards and details procedures for form erection, release agent application, cleaning, and removal.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 03 20 00 - Concrete Reinforcement: Technical specifications for concrete reinforcement, including requirements for reinforcing steel bars, wire fabric, and accessories. The document outlines references to ACI and ASTM standards, submittal requirements, quality assurance protocols, and execution guidelines for placement in accordance with Pennsylvania licensing and AWS qualifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 03 30 00 - Cast-in-Place Concrete: Technical specifications for cast-in-place concrete, covering plain cement concrete curbs, curb ramps, and sidewalks. The document details required ACI and ASTM standards, material compositions (cement, aggregates, admixtures), mix requirements per PennDOT Publication 408, and execution procedures including placing, finishing, and quality control.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 10 14 53 - Post Mounted Signs: Technical specifications for the furnishing and installation of fabricated aluminum signs on steel S or W beam posts. The document references PennDOT Publication 408 and TC 8700 Standard Series for materials and construction standards, including requirements for post alignment and installation methods.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 23 33 - Excavation, Backfill and Compaction: Technical specifications for excavation, backfill, and compaction associated with utility construction and structure installation. The document details quality assurance requirements, compaction testing standards (ASTM D1557, D2922), required density percentages for various applications, and specific material requirements for pipe bedding and embedment based on pipe type and location (State Highways vs. Township Roads).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 01 17.61 - Polymer Modified Asphalt Joint and Crack Sealing: Technical specifications for the cleaning and sealing of pavement surface joints using polymer modified asphalt (PG 64S-22). The document details material requirements per PennDOT standards, certification processes, mixing procedures for reclaimed granulated rubber, surface preparation, and application constraints.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 12 00 - Bituminous Concrete Paving: Technical specifications for bituminous concrete paving, including requirements for asphalt roadways, subbase materials, and execution. The document mandates compliance with Pennsylvania Department of Transportation (PennDOT) Publication 408 and Bulletin 27 standards, detailing material types, installation tolerances, and environmental requirements for placement.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 12 23 - Restoration of Paved Surfaces: Technical specifications for the restoration of paved surfaces, including temporary and permanent paving, asphalt overlay, shoulder restoration, driveways, curb and gutter repairs, stormwater inlets, and street signage. The document mandates compliance with Pennsylvania Department of Transportation (PennDOT) Publication 408 and other related standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 13 13 - Portland Cement Concrete Paving: Technical specifications for Portland Cement Concrete Paving, covering the construction of sidewalks, steps, curbs, and driveway aprons. The document details quality assurance standards (ACI, ASTM, and PennDOT Publication 408), material requirements for forms and reinforcement, Class A concrete mix criteria (including compressive strength and slump), and execution procedures for subgrade preparation, forming, and finishing.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 17 23.33 - Hot Thermoplastic Pavement Markings: Technical specifications for the furnishing and installation of hot thermoplastic pavement markings, including stop bars, crosswalks, legends, and arrows. The document details material requirements per PennDOT Publication 408, application procedures, glass bead retroreflectivity standards, and quality guarantee requirements for a 180-day period.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 17 26 - ADA Detectable Warning Surface: Technical specifications for the installation of ADA and PennDOT compliant detectable warning surfaces (DWS). The document outlines requirements for installer qualifications (minimum 5 years experience), product materials (Polymer Composite, Brick Red), dimensional tolerances, and a five-year written guarantee against defects.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 92 00 - Finish Grading, Seeding, and Sodding: Technical specifications for finish grading, seeding, and sodding. The document details requirements for topsoil, fertilizer, lime, seed mixtures, and sod, including quality assurance standards (PennDOT Publication 408), submittal requirements, and execution procedures for subgrade preparation and topsoil placement.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Township of Bristol - ADA/PennDOT Curb Ramps Agreement: This is a formal agreement between the Township of Bristol (Owner) and a Contractor for the installation of ADA/PennDOT compliant curb ramps, sidewalks, curbing, and sign relocation. The document outlines the scope of work, designates Gilmore & Associates, Inc. as the Engineer, establishes a substantial completion timeline of 115 calendar days, and defines liquidated damages at $500.00 per day. It also details payment procedures, retainage percentages, and interest rates for overdue payments.
PDF
PDF, Low priorityspecifications
LowAI Summary for 2024-00279 Certificate of Insurance - Bristol Township Curb Ramp Construction: Document 00 62 16 specifies the insurance requirements for the Bristol Township 2024 Curb Ramp Construction Replacement Program (Contract 2024-00279). It identifies required additional insureds, including Bristol Township and Gilmore & Associates, Inc., and refers to Document 00 73 00 for specific coverage and limit requirements.
PDF
PDF, Low priorityother
LowAI Summary for Appendix C: Responsible Contractor Ordinance: This document is Appendix C, which pertains to the Responsible Contractor Ordinance.
PDF
PDF, Low prioritybid-tabulation
LowAI Summary for Bristol Township 24-00279 2024 Curb Ramp Program Bid Tabulation: Preliminary bid tabulation for the 2024 Curb Ramp Program (Project 24-00279) for Bristol Township, dated May 13, 2024. The document lists base bid totals from six contractors, with JDC Construction Services, Inc. as the lowest bidder at $273,025.00.
PDF
PDF, Low priorityother
LowAI Summary for BT2024 Curb Ramp Program Blue Ridge: The provided document content is largely empty or contains only page split markers and a single reference to 'FEET', making it unreadable for procurement analysis.
PDF
PDF, Low priorityother
LowAI Summary for BT2024 Curb Ramp Program - Mill Drive: The provided document content is empty or contains no readable text. Based on the filename, it appears to relate to a Curb Ramp Program for Mill Drive, but no substantive procurement details are available.
PDF
PDF, Low priorityother
LowAI Summary for Contract #2024-00279 - Agreement of Surety Company: A legal agreement form for a Surety Company to guarantee the execution and delivery of Performance and Payment Bonds (100% of contract amount) for the Bristol Township 2024 Curb Ramp Construction Replacement Program (Contract #2024-00279).
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyPennsylvania → Bristol Township, Bucks County
Sealed bids will be received by the Township of Bristol online via the PennBid website until 11:00 A.M., prevailing time on May 13, 2024 at which time the bids shall be opened electronically on PennBid for:
Contract 2024-00279: BRISTOL TOWNSHIP 2024 CURB RAMP CONSTRUCTION REPLACEMENT PROGRAM
This project involves a base bid for the installation of ADA/PennDOT compliant curb ramps, with all necessary sidewalks, curbing, and sign relocation/installation at specified locations within Bristol Township. All material, labor, and equipment necessary shall be in accordance with PennDOT Publication 408 and Township Standards.
All Bidding Documents and Solicitation details may be obtained at PennBid™ https://pennbid.bonfirehub.com. Click on the Open Public Opportunities” tab. All documents, specifications, and drawings can be obtained and secure bids submitted online at no cost. A nominal fee of 0.33% of the bid amount (up to $5,000) is assessed only to bidders who are awarded contracts. For bidders who are not the winning bid; there are absolutely no fees.
Each bid shall be submitted in accordance with Article 15 of Document 00 21 13 Instructions to Bidders and Document 00 21 13.1 Instructions – Submitting Electronic Bids, including but not limited to a Bid Bond or Certified Check for not less than ten percent (10%) of the Bid amount payable to the Township of Bristol and proof of insurance in accordance with Paragraph 1.10 of Document 00 73 00 Supplementary Conditions.
The successful Bidder shall be required to furnish performance bond for 100% of the amount of the contract, payment bond for 100% of the amount of the contract, and maintenance bond in such form as meets the approval of the Township of Bristol and having as security thereon such Surety company or companies as are approved by the Township of Bristol.
This project is subject to applicable provisions of Act 422, Pennsylvania Prevailing Wage Act, as amended, and the prevailing minimum wage rates issued by the Pennsylvania Department of Labor and Industry for work valued at over Twenty-Five Thousand Dollars ($25,000). The project is subject to applicable requirements of the Township’s Responsible Contractor Ordinance for work valued at over Ten Thousand Dollars ($10,000).
No Bidder may withdraw his bid within sixty (60) days after the date set for the opening of the bids.
Bristol Township reserves the right to reject any and all bids for any cause whatsoever, to eliminate any item or items from the contract, and to waive any informality in the bids.
Randee J. Mazur
Township Manager
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award