Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on December 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BRUSH RUN WATER POLLUTION CONTROL PLANT – BELT FILTER PRESS REPLACEMENT

Awarded
Peters Township Sanitary Authority, Washington CountyState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 10 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 16 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The Peters Township Sanitary Authority is soliciting bids for the Belt Filter Press Replacement project at the Brush Run Water Pollution Control Plant in McMurray, Pennsylvania. While the Owner is procuring the belt filter press directly, the contractor is responsible for providing all other materials, labor, and equipment necessary for the replacement of the press, press feed pump, belt conveyor, and polymer system. The scope of work further includes the installation of HVAC equipment and all related electrical work. The project is divided into three distinct contracts: General Construction, Mechanical Construction, and Electrical Construction. Bids must be submitted electronically via the PennBid portal by 2:00 PM on January 30, 2026. Each submission must include a certified check or bid bond for at least ten percent of the total bid amount. The contract will be awarded based on the Lowest Price Technically Acceptable (LPTA) criteria to a responsive and responsible bidder. Performance requirements include strict adherence to industry standards such as ANSI/NFPA 70 and UL, with final acceptance contingent upon a Certificate of Substantial Completion and approval by the Engineer. All project documentation, including technical specifications for firestopping and fire-alarm systems, is managed through a digital Project Management Information System (PMIS).

General Info

Contract Value

$262,930

Place of Performance

Washington County, PA, USA

Set-Aside

NONE

Award Issued Date

Documents

13

12642006 - Brush Run WCPC RAS Pump Controls Upgrade Addendum No 3

PDF, High priority: read this firstamendment
High

12642006 Brush Run WPCP RAS Pump Controls Upgrade

PDF, High priority: read this firstrfb
High

12642006 - Brush Run WPCP RAS Pump Controls Upgrade Addendum No 1

PDF, High priority: read this firstamendment
High

12642006 - Brush Run WPC RAS Pump Controls Upgrade Addendum 2

PDF, High priority: read this firstamendment
High

Addendum No. 1 - Brush Run Water Pollution Control Plant Belt Filter Press Replacement Project

PDF, High priority: read this firstamendment
High

Addendum No. 2 - Brush Run Water Pollution Control Plant Belt Filter Press Replacement Project

PDF, High priority: read this firstamendment
High

Peters Township Sanitary Authority - Brush Run WPCP BFP Replacement

PDF, High priority: read this firstrfb
High

Peters Township Sanitary Authority RAS Pump Controls Upgrade - Bid Drawings

PDF, High priority: read this firstspecifications
High

Pricing Section (BT-69GQ)

PDF, High priority: read this firstbid-schedule
High

Pro-Tech Systems Group Quotation - PTSA Brush Run RAS Controls Upgrade

PDF, High priority: read this firstrfq
High

PTSA Brush Run WPCP BFP Replacement - Bid Documents

PDF, High priority: read this firstspecifications
High

Brush Run WPCP BFP Replacement Project Bid Results

PDF, Low prioritybid-tabulation
Low

Firestone Warranty No. 700363575 - Peters Township Sanitary Authority

PDF, Low priorityaward
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Solicitation

Notice updated

Response deadline changed from Jul 22, 2025 to Jan 30, 2026. The notice title changed. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Washington County
ContactsNo contacts available
OfficeWashington County, PA, USA
Office AddressWashington County, PA, USA
ContactsNo contact information available

Interested Companies (108)

Mele & Mele & SonsBraddock, PA
Serpentix Conveyor
JP Environmental

See All 108 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Owner is procuring the belt filter press directly. The Work includes all other materials, labor, and equipment necessary for replacement of the Belt Filter Press, Press Feed Pump, Belt Conveyor, Polymer System, installation of HVAC equipment, Electrical work related to the belt press system and HVAC, and associated miscellaneous Work as shown on the drawings and as specified. The project site is located at the Authority’s Brush Run Water Pollution Control Plant, 111 West Valley Brook Road, McMurray, PA, 15317.
All documents and solicitation details will be available at no cost at the PennBid website as of December 15th, 2025. To access this solicitation, go to https://pennbid.bonfirehub.com and click on “Bids” on the left-hand side of the website. Search the “number” column for “Peters Township Sanitary Authority Washington County - GHD”. The “title” of the project is “BRUSH RUN WATER POLLUTION CONTROL PLANT – BELT FILTER PRESS REPLACEMENT”.
Each Bid shall be accompanied by a Certified Check or Bid Bond payable to PETERS TOWNSHIP SANITARY AUTHORITY in an amount of not less than ten percent (10%) of the total bid in accordance with the provisions in the Instructions to Bidders. Each Bid must be complete and the right is reserved to reject any and all Bids and to accept any Bid deemed to be most favorable to the interests of PETERS TOWNSHIP SANITARY AUTHORITY.
A pre-bid meeting will be held January 6th 2:00 PM, at the Brush Run Water Pollution Control Plant.

More opportunities from Pennsylvania → Washington County

Same awarding agency

NAICS: 237310
SLED
Contract No. 26-01 - North Street Bridge Replacement
Solicitation # 26-01
Contract No. 26-01 is a solicitation issued by Robinson Township, Washington County, Pennsylvania, for the demolition and replacement of the North Street Bridge located in McDonald, PA. The project involves replacing an existing concrete bridge with an aluminum box culvert bridge, including the installation of footers, backfilling, riprap installation, storm line relocation, and the placement of Superpave WMA wearing course with keyway milling. Additional requirements include the installation of guiderails, traffic control, erosion and sediment control BMPs, and a permanent post-mounted sign acknowledging funding from the Commonwealth Financing Authority. Redcon Engineering, LLC serves as the project engineer. Sealed bids must be submitted electronically via PennBid by 2:00 PM on Thursday, October 29, 2026. Proposals must include a completed bid form, a non-collusion affidavit, a public works verification form, a nondiscrimination/sexual harassment clause, and a bid bond or certified check equal to 10 percent of the total proposal amount. The contract will be awarded to the lowest responsible and qualified bidder based on price, previous experience, financial ability, and technical data. The project must be completed within 120 calendar days from the issuance of the Notice to Proceed, with liquidated damages assessed at 500 dollars per day for delays. The successful contractor is required to maintain commercial general and umbrella liability insurance of at least 2 million dollars per occurrence and provide full bonding in accordance with the Public Works Contractor Bond Act 1967. All excavation is to be performed on an unclassified basis, and preference is given to domestic construction materials, subject to the Steel Products Procurement Act.
Highway, Street, and Bridge Construction

POSTED

about 1 month ago

DEADLINE

in 1 day
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS