Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on March 11, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Buckhorn Tailwater Bank Stabilization

Closed
W912QR2500BTFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)
Solicitation # IFB-395-26-JM
The City of Hollywood, Florida, is soliciting bids for the Water Treatment Plant Maintenance Package A Degasifier Package (Project No. 25-4261A). The scope of work involves the replacement of packing media in three degasifiers (units 2, 3, and 4) at the Water Treatment Plant located at 3441 Hollywood Boulevard. Key deliverables include power washing the vessels, replacing media support grids and differential pressure gauges, performing vessel disinfection, and resealing access doors. To ensure continuous plant operation, the contractor must work on only one unit at a time. The project requires a contractor with a project manager possessing at least five years of experience and a track record of at least five similar degasifier servicing projects, as well as the provision of a factory-trained service technician for performance testing. Bids must be submitted electronically via the OpenGov portal by November 4, 2026, at 3:00 PM. The contract will be awarded to the lowest responsive and responsible bidder. Financial requirements include a bid guarantee of 5 percent of the bid amount and the provision of performance and payment bonds. Comprehensive insurance coverage is mandated, including general liability, pollution liability, and vehicle liability, with the City of Hollywood named as an additional insured. The project timeline specifies substantial completion within 180 days and final completion within 210 days, with liquidated damages set at 500 dollars per day. Additionally, the contractor must comply with federal prevailing wage requirements for Broward County and provide a twelve-month warranty against poor workmanship and faulty materials.
Public Utilities

POSTED

about 10 hours ago

DEADLINE

in 21 days
NAICS: 237990
New
SLED
Addendum #1: BDC07-26/27 - Long Key State Park – Long Key Beach Nourishment and Campground Rebuild
Solicitation # BDC07-26/27
The Florida Department of Environmental Protection, Bureau of Design and Construction, is soliciting formal, competitive, sealed bids for the Long Key State Park Beach Nourishment and Campground Rebuild project, solicitation number BDC07-26/27. The scope of work requires the contractor to provide all labor, materials, equipment, supervision, and permitting necessary for the campground modification project at Long Key State Park in Long Key, Florida. All work must be designed and constructed in accordance with applicable green building standards pursuant to Executive Order 07-126 and Section 255.252(3), F.S. Bids must be submitted no later than 3:30 pm ET on Thursday, November 12, 2026, to Alisha Sadler at the Bureau of Design and Construction in Tallahassee. Bidder prequalification is mandatory; applicants must provide a biennial pre-qualification letter from the FDEP or, if not pre-qualified, submit a current State Contractor license certification and Corporate Charter registration. Additionally, the selected contractor must utilize the U.S. Department of Homeland Security’s E-Verify system for all employees and subcontractors. The Department encourages the use of diverse subcontractors to reflect the citizenship of Florida and ensures ADA accessibility for all bid-related activities.
Department of Environmental Protection

POSTED

about 14 hours ago

DEADLINE

in 22 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Buckhorn, KY, USA

Set-Aside

NONE

Documents

1

Buckhorn Tailwater Stabilization Pre-Solicitation Synopsis

PDF, Low prioritypresolicitation
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Louisville
Contacts1 person available
OfficeLOUISVILLE, KY, 40202-2230, USA
Office AddressLOUISVILLE, KY, 40202-2230, USA

Full Description

Show more
Buckhorn Tailwater Stabilization Pre-Solicitation Synopsis In accordance with FAR 5.204, this pre-solicitation notice is meant to inform industry of an anticipated, upcoming solicitation. This notice will not bind the government to any actions or awards. DESCRIPTION: The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a Invitation for Bid (IFB) for Buckhorn Tailwater Bank Stabilization in Buckhorn, Kentucky. This project is a Design/Bid/Build where the streambank of Squabble Creek on the west side of Buckhorn Campground in Buckhorn, Kentucky was affected by a flood event in 2022. The streambank experienced severe erosion which is now affecting the adjacent camper pads. Erosion damage to approx. 500-foot-long portion of the streambank along Squabble Creek is to be repaired. Main efforts include the following scope items: The repair will consist of regrading the stream bank and lining with rip rap stone protection. Additional repairs to several campsites will require grading, gravel camping pad and concrete camping pad placement. In addition, asphalt milling and overlay and subgrade repairs to the campground road will be included. Squabble Creek has endangered darter species and will require erosion control BMPs. Contract duration is 60 calendar days from the Notice to Proceed (NTP). TYPE OF CONTRACT AND NAICS: This IFB will be for one (1) Firm-Fixed-Price (FFP) contract. The North American Industrial Classification System Code (NAICS) for this effort is 237990 - Other Heavy and Civil Engineering Construction. TYPE OF SET-ASIDE: This acquisition will be advertised as 100% Small Business. SELECTION PROCESS: This is a Design/Bid/Build procurement, Invitation for Bid, sealed bid. CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be in the estimated cost range between $500,000 and $1,000,000 (FAR 36.204). ANTICIPATED SOLICITATION RELEASE DATE: The Government anticipates releasing the solicitation on or about 27 March 2025. Additional details can be found in the solicitation when it is posted to http://Sam.gov. SOLICITATION WEBSITE: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at the Contracting Opportunities website, http://Sam.gov. Paper copies of the solicitation will not be issued. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. To download the solicitation for this project, contractors are required to register at the Contracting Opportunities website at http://Sam.gov. Amendments, if/when issued, will be posted to the above referenced website for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offerors responsibility to check the website periodically for any amendments to the solicitation. REGISTRATIONS: Offerors shall have and shall maintain an active registration in the following database: System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at http://Sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror. POINT-OF-CONTACT: The point-of-contact for this procurement is Ethan Phillips, Contract Specialist, at contact@example.gov This announcement serves as the Advance Notice for this project. Responses to this synopsis are not required. This notice does not constitute a solicitation announcement, nor does it restrict the Government to an ultimate acquisition approach. No solicitation or technical scope of services is available at this time. Please ensure that no other government officials are contacted regarding this notice.

More opportunities from Department Of Defense → W072 Endist Louisville

Same awarding agency

NAICS: 237110
New
Federal
Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP)
Solicitation # W912QR27BA003
Solicitation W912QR27BA003 is a Design-Bid-Build project for the demolition and construction of the Axtel Wastewater Treatment Plant (WWTP) at Rough River Lake in McDaniels, Kentucky. The scope of work requires the contractor to remove the existing WWTP and fencing and install a new Aerobic Treatment Unit (ATU) and Drip Field System. This unrestricted procurement is estimated to have a construction magnitude between 1 million and 5 million dollars, with the award based on the lowest evaluated price. A 10 percent price evaluation preference will be applied to eligible HUBZone small business concerns. The contract is a Firm-Fixed-Price agreement under NAICS code 237110, with a total project duration of 400 calendar days from the Notice to Proceed. Performance is scheduled from December 18, 2026, to January 22, 2028, with a requirement to commence work within 10 calendar days of the notice. Key requirements include the submission of a Construction Quality Control (CQC) plan within 30 days of the notice to proceed, adherence to Davis-Bacon Act wage rates, and the provision of a Site Safety Health Officer. Liquidated damages for delays are set at 500 dollars per calendar day. Proposals must be submitted electronically via the PIEE Solicitation Module by the December 3, 2026, deadline.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Federal
Request for Information/Market Intelligence Notice: Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Fort Hunter-Liggett Water System Improvements
Solicitation # W912QR-PDB-FHLWATER
The U.S. Army Corps of Engineers, Louisville District, is seeking market intelligence through a Request for Information for the restoration and modernization of potable water and wastewater collection systems at Fort Hunter Liggett. With an estimated acquisition magnitude of 70 to 80 million dollars, the project scope includes the design and construction of a new tank farm with at least 2 million gallons of storage, a new transmission main, upgrades to water supply wells, modernized SCADA infrastructure, and the rehabilitation of sanitary sewer lines and treatment plant lagoons. All work must adhere to NSPC, UFC, and NFPA criteria to address aging infrastructure and operational deficiencies. The government is evaluating a Progressive Design Build strategy utilizing an Other Transaction Agreement under 10 U.S.C. section 2808a. This proposed approach would involve a qualifications-based selection process consisting of a statement of qualifications and pitch meetings. The award would be structured in two phases: an initial design and pre-construction phase followed by a construction phase based on an agreed-upon Guaranteed Maximum Price. Interested parties under NAICS code 237110 must submit their company profiles, collaborative delivery experience, and technical feedback via the designated online survey form by November 3, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS