Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on April 13, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Building 37100 Upgrade Communication Infrastructure at Kirtland Air Force Base, Bernalillo County, New Mexico

Awarded
W912PP-17-T-0047Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Installation of Buried Fiber Optic Cable Stanton North Substation to Hoskins Substation
Solicitation # 26085
The Nebraska Public Power District is soliciting bids for Request for Bid No. 26085 to install approximately six miles of underground fiber optic cable between the Stanton North and Hoskins Substations in northeast Nebraska. The scope of work encompasses all labor, materials, and supervision required for staking, material coordination, property owner contacts, and right-of-way restoration. Specifically, the contractor will install 48-strand buried fiber optic cable provided by the contractor and 48-strand all-dielectric fiber provided by the District. The project must adhere to RUS Form 515a and IEEE Standard 1333-1994 for guided boring. Work is expected to be awarded by November 25, 2026, with a final completion deadline of April 15, 2027. Bids are due by November 13, 2026, and must include a completed pricing spreadsheet and current all-inclusive equipment and labor rates. Evaluation factors for the award include quoted price, conformance with specifications, past schedule performance, and the bidder's financial responsibility and experience. To qualify, bidders must certify the completion of at least three similar buried fiber optic installation projects within the last five years. Payment terms specify that 95 percent of the price is paid within 30 days of acceptable performance, with 5 percent retained until final acceptance. An optional pre-bid teleconference is scheduled for November 5, 2026, to review contract specifications.
Nebraska Public Power District

POSTED

about 11 hours ago

DEADLINE

in 15 days
NAICS: 237130
New
Federal
B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback
Solicitation # W9126G27R1CSY
The U.S. Army Corps of Engineers, Fort Worth District, is conducting market research via a Sources Sought notice for the B-21 Utilities and Site Improvements project at Dyess Air Force Base, Texas. This initiative aims to establish high-reliability primary electrical power distribution and dedicated fiber-optic communications infrastructure to support the bed-down of the B-21 weapons system. The scope includes the installation of single-mode fiber optic cables, telephone system expansion, power cabling in concrete encased ducts, pole-mounted conductors, and associated transformers and switchgear. The project also encompasses site improvements such as earthwork, grading, and erosion control. The estimated Construction Cost Limitation is $28,550,000, though an $8 million electric substation and specific end-user network equipment are expressly excluded from this contract. The government is currently evaluating whether to utilize a traditional Federal Acquisition Regulation based contract or an Other Transaction Agreement under 10 U.S.C. section 2808a. If a collaborative procurement framework is chosen, a two-phase selection process will be implemented, focusing first on technical capability, past performance, and collaborative execution history, followed by an evaluation of final technical and price proposals. The project must adhere to strict Department of Defense standards, including UFC 1-200-01 for general building requirements, UFC 4-010-01 for antiterrorism, and UFC 4-010-06 for cybersecurity of facility-related control systems. The anticipated period of performance is 690 calendar days from the notice to proceed, with a required beneficial occupancy date of March 8, 2030.
W076 Endist Ft Worth

POSTED

about 12 hours ago

DEADLINE

in 14 days
NAICS: 237130
New
SLED
De Palma Road Electrical Conduit Installation Project
Solicitation # TLARC-819
The County of Riverside is soliciting bids for the De Palma Road Electrical Conduit Installation Project (Project No. D4-0072) located in the Community of Horsethief Canyon, California. The project involves the excavation and backfill of approximately 1,000 feet of trenching, the installation of 685 feet of 1.5-inch and 350 feet of 3-inch electrical conduit and handholes, and the installation of 6-inch Type D concrete curb per County Standard No. 204. All work must adhere to Southern California Edison plans and be completed within 30 working days from the commencement date specified in the County's written order. The estimated project cost is 209,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals by December 2, 2026, at 1:30 P.M. Pacific Time, including a non-collusion declaration and a bid guarantee of 10 percent of the total bid. The awarded contractor must provide performance and payment bonds, comply with California State Labor Code prevailing wage requirements, and adhere to specific affirmative action plans based on contract value and employee count. Payments will be made monthly, with the Owner paying 90 percent of the value of labor and materials incorporated into the work and 75 percent of materials stored on site, subject to certification by the Architect.
COUNTY OF RIVERSIDE

POSTED

about 17 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Installation Of Street Lighting On Raymond Avenue From Maple Street To North City Limits
Solicitation # 2026-IFB-CIV-0549
The City of Pasadena Department of Public Works is soliciting bids under solicitation number 2026-IFB-CIV-0549 for the installation of a new street lighting system on Raymond Avenue, extending from Maple Street to the North City Limits. The project requires the contractor to furnish and install concrete street lighting standards, foundations, LED luminaires and fixtures, conduits, conductors, pull boxes, and other appurtenant work. Key technical deliverables include 29W or 50W LED replacements, galvanized steel conduits, and 6 foot Type S Scroll Arms. The contractor must provide all necessary labor, materials, and equipment, ensuring compliance with the ADA, CBC, Title 24, and PROWAG accessibility guidelines. Bids must be submitted electronically via the City of Pasadena eProcurement Portal by 2:00 pm on November 17, 2026. Qualified bidders must provide evidence of experience with two similar governmental projects and submit several mandatory documents, including Form AA-1, Form AA-2 for labor exceeding 25,000 dollars, a non-collusion declaration, and a DHS contract disclosure. A bid security of five percent of the total bid price is required, and the successful awardee must provide material and faithful performance bonds for 100 percent of the base bid. Work must commence within 15 calendar days of the Notice to Proceed and be completed within 20 working days. Invoicing is handled through the city's Vendor Invoice Portal, with payments issued on Tuesdays and Thursdays.
City of Pasadena Department of Public Works

POSTED

about 17 hours ago

DEADLINE

in 19 days
NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This contract, solicitation number W912PP-17-T-0047, involves upgrading the communication infrastructure at Kirtland Air Force Base in Bernalillo County, New Mexico. The project focuses on several buildings, including 37100, 37029, 37030, 37031, and 37046, and is managed by the Department of Defense through the W075 Endist Albuquerque. The scope of work includes the installation of a 100 pair figure eight aerial cable from Building 37100 to Building 37031, which requires ensuring all poles are structurally sound and installing necessary guy wires and grounding. Additionally, the contractor must install lockable boxes and splice cases at specific telephone poles and replace existing six pair cabling with new lines properly grounded on protector blocks. Specific upgrades for Building 37100 include installing new conduit from the entrance to room Q, performing required core drills, and rerouting existing cabling. The project also requires relocating equipment to a new 4 x 8 backboard and installing protector blocks for all outside plant cables. To minimize operational disruption, the contractor is required to coordinate any service outages with the customer at least one week in advance.

General Info

Contract Value

$143,724.14

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

NM, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W075 Endist Albuquerque
Contacts1 person available
OfficeALBUQUERQUE, NM, 87109-3435, USA
Office AddressALBUQUERQUE, NM, 87109-3435, USA
Contacts
Glenda D. KohlieberContract Specialist

Full Description

Show more
a. Construction Bldg. 37100, 37029, 37030, 37031, and 37046 1. Install a 100 pair figure eight aerial cable from B37100 to B37031 across existing poles. The new aerial cable shall be installed in accordance with all applicable guidelines in regards to road crossings, powerlines, tension, and sag. Install or replace new poles and structures along the path to ensure all poles are structurally sound. 2. Install splice cases at the telephone poles at B37029, B37030, and B37031. Place a sufficiently sized lockable box six feet off the ground at al splice locations with a 100 through and through splice case. 3. Remove the existing six pair cable and install a new six pair from the telephone pole to B37031. Ensure cable terminations at B37028 and B37031 are on protector blocks and properly grounded. 4. Install any and all required guy wires and grounding on all poles installed and utilized. Bldg. 37100 5. At B37100 install a new appropriately sized conduit from the entrance to room Q. 6. Provide any required core drills to complete the installation of the required conduit. 7. Pull back the existing six pair cable from B37100 to B37028 and pull through the new conduit to room Q. 8. Relocate all existing equipment from the existing backboard to a new 4 x 8 backboard. Place new protector blocks to support all new and existing OSP cables. 9. All outages due to the installation or rerouting of cables needs to be coordinated with the customer one week prior to ensure proper coverage of facilities during the expected down time.

More opportunities from Department Of Defense → W075 Endist Albuquerque

Same awarding agency

NAICS: 237310
New
Federal
Special Notice - Announcement of Industry Day - Progressive Design-Build (PDB) Other Transaction (OT) for FY28 High Speed Test Track, Holloman Air Force Base, Otero County, Mexico
Solicitation # W912PP27Z1CUU
The U.S. Army Corps of Engineers, Albuquerque District, is issuing a special notice for a Progressive Design-Build Other Transaction agreement under the authority of 10 U.S.C. 2808a for the FY28 High Speed Test Track at Holloman Air Force Base in Otero County, New Mexico. This Firm-Fixed-Price project focuses on the repair and upgrade of critical infrastructure, including girder repair and restoration, the replacement of 3,963 linear meters of track connection tie-down points, the widening and replacement of STAPP East and West access roads, and repairs to the Camera Pad Road. The completed track must maintain an operational lifespan of at least ten years beyond construction. The procurement will follow a streamlined, two-step competitive selection process to identify the most qualified progressive design-build entity. In the first step, interested parties must submit a Statement of Qualifications, and up to three selected companies will proceed to the second step, which consists of pitch meetings. The project is structured into two phases: Phase 1 covers design and pre-construction services, while Phase 2 encompasses final design and construction. Cybersecurity Maturity Model Certification requirements will be determined based on guidance available during the first step of the request. Interested parties are advised to monitor sam.gov for the official solicitation announcement and complete proposal instructions.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 14 days
View Details
NAICS: 236220
Federal
REQUEST FOR INFORMATION/SOURCES SOUGHT
Solicitation # W912PP27RA003
The U.S. Army Corps of Engineers Albuquerque District is conducting a sources sought market survey for the construction of the Space Rapids Capabilities Office at Kirtland Air Force Base in New Mexico. This preliminary planning effort seeks to identify qualified industry sources for a competitive, firm-fixed-price, design-bid-build contract. The project involves the construction of a 67,833 square foot, two-story facility featuring controlled office spaces, a 200-seat auditorium, and specialized infrastructure including reinforced foundations and secure communications. The estimated construction value is between 50 million and 100 million dollars, with an anticipated solicitation issuance date around April 22, 2027. Key requirements for the project include compliance with Department of Defense antiterrorism and force protection standards, as well as Unified Facilities Criteria for permanent construction. The facility must support controlled networks and accreditation with physical and electronic security measures. Prospective prime contractors must demonstrate experience with ICD 705 and AV/ESS requirements, the design-bid-build process, and federal antiterrorism provisions. Additionally, the scope includes the installation of a LenelS2 OnGuard alarm system, requiring all contracted personnel to hold a Secret security clearance and adhere to DD Form 254 specifications. The government is also soliciting feedback on the potential use of Project Labor Agreements for this large-scale effort.
Commercial and Institutional Building Construction

POSTED

11 days ago

DEADLINE

in 7 days
View Details
NAICS: 541330
Federal
Combined Synopsis/Solicitation for; W912PP25RA009 INDEFINITE-DELIVERY, INDEFINITE-QUANTITY (IDIQ), MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR CIVIL WORKS PLANNING STUDIES AND ASSOCIATED DESIGN ARCHITECT-ENGINEER (A-E) SERVICES, ALBUQUERQUE DISTRICT, N
Solicitation # W912PP25RA009
Solicitation W912PP25RA009 is an Indefinite-Delivery, Indefinite-Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Civil Works planning studies and associated Architect-Engineer (A-E) services supporting the U.S. Army Corps of Engineers (USACE) Albuquerque District. The contract covers a regional area of operations spanning New Mexico, Southern Colorado, and Southwest Texas. With a shared capacity of 49.9 million dollars, the government intends to award contracts to five to seven firms across unrestricted and small business reserve pools. The scope of work includes interdisciplinary design, hydrologic and hydraulic analysis, river modeling, and construction support for water resource structures such as dams and levees. Selection is based on professional qualifications per the Selection of Architects and Engineers Statute, with a primary focus on specialized experience in flood control studies within the Albuquerque District. Evaluation criteria include professional qualifications, past performance over the last seven years, capacity to execute simultaneous task orders, and knowledge of the locality. Minimum requirements include proficiency in AutoCAD Civil 3D, ESRI products, and familiarity with USACE Spatial Data Standards for Facilities, Infrastructure, and Environment (SDSFIE). Offerors must submit a complete SF330 via the Procurement Integrated Enterprise Environment (PIEE) portal by November 6, 2026.
Engineering Services

POSTED

14 days ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS