Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Building Demolition - Circle V Property

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Joaquin River Conservancy is initiating the demolition of all existing structures on the Circle V Property in Madera, California, to eliminate safety hazards posed by vacant and deteriorating buildings. The scope includes removal of two residential structures, a shed, a pool, a well, and septic tanks, with strict adherence to safety protocols for handling hazardous materials such as lead paint and asbestos found in flooring. All contaminated debris will be disposed of using approved methods to ensure environmental compliance and public safety. The project also requires obtaining necessary permits for the proper abandonment of the well and septic systems. All work will be conducted under the oversight of the Conservancy, with Jennifer Tucker serving as Project Director and Kari Daniska as Chief Executive Officer, ensuring accountability and regulatory alignment throughout the process.

General Info

Demolish hazardous structures on Circle V Property, remove contaminants, comply with environmental rules, obtain permits, overseen by Conservancy.

Agency

California → San Joaquin River Conservancy

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

42388 Avenue 11, Madera, CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin River Conservancy
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Joaquin River Conservancy
Office AddressN/A
Contacts
Jennifer TuckerProject Director
Kari DaniskaChief Executive Officer

Full Description

Show more
The proposed project includes demolition of all existing structures on the property owned by San Joaquin River Conservancy including the two (2) existing residential structures, a shed structure, a pool, a well, and septic tanks. The vacant structures are creating a safety hazard. The project scope includes standard safety measures during demolition activities to address the presence of lead paint and asbestos in the flooring. Proper disposal methods will be implemented for lead and asbestos contaminated debris. Appropriate permits will be obtained for the demolition/abandonment of the well and septic tanks.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SEA S Concourse Evolution (SCE) – Bid Package 02
Solicitation # sea-s-concourse-evolution-sce-bid-package-02
The Seattle-Tacoma International Airport S Concourse Evolution (SCE) Project Bid Package 02 is a solicitation managed by Hensel Phelps, acting as the General Contractor/Construction Manager. This 8(a) Small Disadvantaged Business set-aside opportunity involves a comprehensive scope of work across twelve subsystems, including demolition and abatement, building concrete retrofit, structural steel, fire suppression, site paving, runway and taxi marking, site demolition and earthwork, deep foundations, site utilities, aviation fueling systems, and baggage handling systems. The estimated total contract value ranges from 124,206,500 to 143,700,000 dollars, with individual subsystem budgets varying significantly, such as demolition and abatement ranging from 43 million to 50 million dollars. The project is governed by a Project Labor Agreement (PLA) and requires all subcontracts to be executed on Hensel Phelps standard subcontract forms. Key compliance requirements include a Workers Compensation Waiver of Subrogation for all subcontractors and performance bonds for subcontracts exceeding 100,00. Bids must be submitted via email to the designated point of contact using the provided bid form and bond forms. The response deadline for this solicitation is September 1, 2026, with the place of performance located in Washington.
Hensel Phelps

POSTED

about 9 hours ago

DEADLINE

in 18 days
View Details
NAICS: 238910
New
Federal
Demo Mini mute sites
Solicitation # FA480326Q0094
The U.S. Government, through the Department of Defense at Shaw Air Force Base, South Carolina, is conducting a sources sought initiative under solicitation number FA480326Q0094 to identify qualified small businesses capable of performing demolition and site restoration services at two locations—Olanta Site and Kingstree Site. This is a pre-solicitation notice with no formal offer submission permitted at this time; the sole purpose is to gather information on industry capability, capacity, and eligibility under a Total Small Business Set-Aside (FAR 19.5). Respondents are required to provide their business capability statement, NAICS code 238910, SBA small business certification status, CAGE code, current SAM.gov registration status, and point of contact details. Work includes full demolition of mini-mute sites comprising lightning towers, concrete footings, underground electrical infrastructure, fencing, and related structures, followed by site restoration involving grading and hydroseeding. The performance period is 60 calendar days from Notice to Proceed, with all activities governed by UFC, UFGS, NFPA, NEC, and Shaw AFB Design Standards, with UFC taking precedence. Contractors must comply with environmental regulations set by SCDHEC and EPA, properly document and dispose of hazardous materials including refrigerants, and submit daily RAKEN reports, dump receipts, and video documentation. Equipment must be new, installed per manufacturer instructions, and all engineering drawings require sealing by a South Carolina-licensed Professional Engineer. Payment requires submission of the DD1354 form, and debris must be transported in covered containers along approved routes to authorized landfills. No pricing, contract value, or award evaluation factors are included as this is strictly an information-gathering action prior to potential IDIQ contract award.
FA4803 20 Cons Lgca

POSTED

about 13 hours ago

DEADLINE

in 7 days
View Details