Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Washington was posted on August 14, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bunker Sand Supply and Placement

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
SLED
Mechanical Site Prep: Jawbone Creek Item 2
Solicitation # RFP-2025-0154
Tuolumne County is soliciting proposals under RFP-2025-0154 for fuels reduction and mechanical site preparation for the Cherry West Project, also referred to as Jawbone Creek Item 2. This project, authorized by a Master Stewardship Agreement with the USDA Forest Service, involves mastication, piling, shredding, chipping, and hand thinning across approximately 796.26 to 835.60 acres within the Stanislaus National Forest. The primary objective is to protect and restore forest and watershed health while creating economic opportunities. Work is divided into priority units (K010C, K011B, K011C, and L001) to be completed by October 31, 2027, with all remaining units finished by October 31, 2028. The contract is for an initial two-year term and requires contractors to adhere to strict environmental and safety standards, including the RIM BMP Checklist, a comprehensive Fire Plan, and spill prevention procedures. Payment is contingent upon Forest Service acceptance, with full payment issued only if inspection results show 95 percent or higher work completion. Proposals are evaluated based on cost (40%) and qualifications/experience (30%), including the contractor's implementation plan and equipment capabilities. All work is subject to California Labor Code prevailing wage requirements, and contractors must provide detailed employment outcome reporting. Proposals must be submitted in PDF format via the online portal by November 15, 2026.
County Administration Office

POSTED

about 20 hours ago

DEADLINE

in 4 days
NAICS: 115310
New
SLED
Mechanical Site Prep: Cherry West Item 1
Solicitation # RFP-2025-0153
Tuolumne County is soliciting proposals under RFP-2025-0153 for fuels reduction and mechanical site preparation to support reforestation on approximately 496.52 to 535.90 acres within the Stanislaus National Forest. This project is executed under a Master Stewardship Agreement with the USDA Forest Service on behalf of the Yosemite Stanislaus Solutions Collaborative. The scope of work includes mastication, piling, hand thinning, chipping, and the creation of fuelbreaks. Priority units M014A and M014C must be completed between June 2027 and October 31, 2027, with at least 50 percent of total awarded acres finished by that date and all remaining work completed by October 31, 2028. Contractors must comply with California Labor Code prevailing wage requirements and possess a valid Department of Industrial Relations registration number. Award decisions are based on a weighted evaluation of reasonable cost (40 percent), qualifications and experience (30 percent), and service delivery methodology (30 percent), with a 10 percent preference given to local vendors based in Tuolumne County. Full payment is contingent upon Forest Service acceptance and inspection results showing 95 percent or higher work completion. Strict adherence to environmental and safety protocols is required, including the implementation of a comprehensive fire plan, spill prevention procedures, and Best Management Practices to minimize resource damage and sedimentation.
County Administration Office

POSTED

about 20 hours ago

DEADLINE

in 4 days
NAICS: 115310
New
International
PL28DMK002 - Summer Tree Planting in the Osilinka - 2 Million Trees
Solicitation # PL28DMK002
The Province of British Columbia Ministry of Forests is soliciting tenders for an Operational Services Contract, number 10005-40/PL28DMK002, for the summer planting of 2 million trees in the Osilinka region. The period of performance is scheduled from May 1, 2027, to December 31, 2027, with a target completion date of July 31, 2027, after which a late penalty of 1,000.00 CAD per day applies. The project involves planting seedlings across various designated blocks, such as FTG_001, FTG_002, FTG_003, FTG_004, HID011, OSI4, OSI_022, and OSI_030, utilizing specific technical mapping and geospatial data. Contractors are required to use Plant Wizard for tracking seedling movement and production and must maintain constant communication with the Mackenzie District Office via radiotelephone, satellite, or cell phone. To be eligible, bidders must demonstrate significant experience, including the completion of a tree planting contract of at least 1.5 million trees in the BC interior within a single year and a minimum production rate of 150,000 trees per day. Mandatory certifications include the BC Forest Safety Council SAFE Company program or an equivalent recognized safety scheme. The contract will be awarded to the lowest priced compliant tender. Payment is based on actual quantities planted, subject to a 10 percent holdback for 40 days post-completion. Quality is monitored via the Ministry of Forests Planting Quality Inspection System, requiring a minimum acceptable standard of 85 percent. Financial penalties are outlined for unplanted areas, seedling quality reductions, and failure to return reusable containers.
Ministry of Forests

POSTED

about 21 hours ago

DEADLINE

in about 2 months
NAICS: 115310
New
International
BR28TFD001 Manual Brushing 1 - Kootenay Lake
Solicitation # BR28TFD001
The BR28TFD001 solicitation is an operational services contract issued by the BC Timber Sales Branch of the Province of British Columbia for manual brushing services in the Kootenay Lake operating area. The primary objective is to support crop establishment by cutting competing vegetation within a 1.25m variable radius cylinder around crop trees using power saws or similar equipment. The project is scheduled to take place from early to mid-June 2027 through late August 2027, with a total agreement term running from April 1, 2027, to March 31, 2028. Performance requirements include a minimum production of 5 hectares treated per workday, or 0.5 hectares per worker per day for day rate units. The contract is awarded to the lowest compliant bidder based on the Total Bid Price, though unit rates take precedence for the actual contract. Eligibility requires bidders to be certified in the BC Forest Safety Council SAFE Company program and demonstrate technical capability and equipment. Mandatory requirements include a bid security of $5,000 or $10,000 depending on the tender value, and comprehensive insurance coverage, including $2 million for both Commercial General Liability and Automobile Liability. All work must adhere to the Wildfire Act and Regulations, and contractors must provide a BCFSC certified Falling Supervisor for hand falling activities. Payment is processed within thirty days of invoice receipt, contingent upon the availability of provincial appropriations.
BC Timber Sales Branch

POSTED

about 22 hours ago

DEADLINE

in 28 days
NAICS: 115310
New
SLED
ITB 27B-003 Econfina Creek Site Prep for Reforestation and Habitat Restoration
Solicitation # ITB 27B-003
The Northwest Florida Water Management District is soliciting bids for the 2027 Econfina Creek Site Prep for Reforestation and Habitat Restoration project. The scope of work involves heavy mechanical site preparation and chemical treatment of approximately 1,012 acres of commercially planted sand pine stands within the Econfina Creek Water Management Area across Bay and Washington counties. The contractor must remove all live and dead sand pine and designated hardwoods, ensuring stumps are cut no higher than six inches above the ground, and manage vegetative debris through removal or pile burning. Chemical treatment, utilizing specific concentrations of Imazapyr, Triclopyr, and a modified seed oil surfactant, must cover at least 95% of each unit using a GPS flagging system. The project is divided into two phases: Unit 1, consisting of at least 504 acres, must be completed by September 30, 2027, and Unit 2, consisting of the remaining 508 acres, must be completed by September 30, 2028. Chemical operations must be finalized by September 30 of each year to ensure effectiveness before January replanting. The contract will be awarded to the respondent offering the lowest total lump sum amount, with a point-based tie-breaking system favoring certified minority business enterprises, veteran's business enterprises, and those with a drug-free workplace program. Bidders must submit their responses electronically via DemandStar by December 3, 2026. Required security includes a bid bond and a performance bond of $50,000 or ten percent of the total contract amount. Payment is issued via electronic funds transfer within 30 days following inspection and approval of the work by the District Project Manager.
Northwest Fla Water Management Dist

POSTED

1 day ago

DEADLINE

in 22 days
NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning (PCT) contracts in the McAllister Creek area of the Colville Indian Reservation. The project encompasses a total of 23.77 acres, divided between Unit 313-040 (10.33 acres) and Unit 313-035 (13.44 acres). The scope of work requires the selection and retention of the most vigorous trees, strict adherence to boundary protections, and comprehensive slash management, including clearing all debris from roadways, trails, and streams. Contractors must ensure maximum stump heights do not exceed half the stump diameter and that all foreign debris is removed prior to final payment. Bids must be submitted in a sealed envelope labeled McAllister Creek PCT 2027 and placed in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 17, 2026. Required submission documents include a bid sheet, work plan, TERO compliance and utilization forms, and a certification regarding debarment and suspension. Payment is based on a bid price per acre, with 20 percent of each payment withheld until final acceptance. Contractors must provide liability insurance and comply with the Occupational Safety and Health Act of the Confederated Tribes of the Colville Reservation. An Indian preference policy is maintained for all applicable products and supplies.
Confederated Tribes of the Colville Reservation

POSTED

1 day ago

DEADLINE

in 6 days
NAICS: 115310
New
SLED
DNR fire assistance
Solicitation # 27-422DNR-RESCO-B-54807
The State of Illinois, through the Office of Resource Conservation, is soliciting a firm contract for DNR fire assistance to support prescribed fire operations across Heritage and INPC sites in southern Illinois. The scope of work involves providing trained crew members to perform site preparation, ignition, holding, and mop-up operations under the direction of an IDNR Certified Prescribed Burn Manager. Key tasks include installing 6-8 foot wide firebreaks and mitigating hazards such as burning snags across various counties, including Johnson, Saline, Pope, Hardin, Massac, Alexander, Pulaski, Jackson, Williamson, Perry, Franklin, and Union. The contract term begins upon the final signature and ends on April 15, 2029, with a maximum total term not to exceed ten years. Qualified vendors must provide personnel who are physically capable of working in smoke-filled environments and steep terrain, and who are proficient in English and fire terminology. Crew members must have completed S-130, S-190, and fire field day training, and have participated in at least two fire seasons. Chainsaw operators must hold SAWW or S-112 certifications. The vendor is responsible for providing all necessary personal protective equipment, including Nomex clothing and safety gear, as well as standard fire equipment like backpack blowers and hand tools. Administrative requirements include the submission of daily work logs and weekly email updates to the Primary Job Coordinator, with a notification requirement of at least 12 hours before starting a job. Payments are processed according to the State Prompt Payment Act, and the contract may be funded in part or in full by federal funds. Vendors must maintain comprehensive insurance, including $1,000,000 in general commercial liability and $2,000,000 in combined single limit for bodily injury and property damage. Bids are submitted on an hourly basis for an estimated 483 hours of work via the BidBuy portal.
RESCONSERV422 - Office of Resource Conservation

POSTED

1 day ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The City of Spokane is seeking a subcontractor for the supply and placement of Lane Mountain BTR bunker sand at a designated project site. A primary requirement of the contract is that all work must be executed with minimal disruption to active golf operations. This opportunity was posted on August 14, 2024, with a response deadline of September 9, 2024. The project falls under NAICS code 115310 and is managed by the City of Spokane in Washington.

General Info

City of Spokane seeks subcontractor for bunker sand supply and placement by September 9.

Place of Performance

WA, USA

Set-Aside

NONE

Documents

This scope was carved out of 6210-24.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Indian Canyon Bunker Renovation Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Spokane
ContactsNo contacts available
OfficeN/A
Organization / AgencyWashington → City of Spokane
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and placement of specified Lane Mountain BTR bunker sand at project site with minimal disruption to active golf operations.

More opportunities from Washington → City of Spokane

Same awarding agency

NAICS: 325998
New
SLED
Chemical and Surface Solutions for Combustion-Side Fouling and Slagging Control in Waste-to-Energy (WTE) Systems
Solicitation # RFI 6648-26
The City of Spokane, through its Solid Waste Disposal Department, has issued Request for Information RFI 6648-26 to identify chemical and surface solutions for combustion-side fouling and slagging control at its Waste-to-Energy Facility located in Spokane, Washington. The city is seeking technical, commercial, and performance data from qualified suppliers regarding ash-modifiers, slag-control, deposit-modification, and anti-fouling products, including chemical additives and surface coatings. The primary objective is to find proven solutions that modify ash behavior to create softer, less adherent deposits, thereby improving boiler availability, heat-transfer efficiency, and fuel flexibility while reducing maintenance costs and forced outages. This RFI is for information-gathering purposes only and does not constitute a formal solicitation for bids or a commitment to purchase. Interested respondents must submit their responses electronically via the ProcureWare portal by February 23, 2027, with a clarification deadline of February 12, 2027. Required submissions include detailed company and product overviews, technical performance data specifically related to municipal solid waste incineration, implementation requirements for injection or application equipment, and commercial pricing structures. Additionally, respondents must provide Safety Data Sheets and documentation regarding DOT hazard classes and environmental regulatory status.
All Other Miscellaneous Chemical Product and Preparation Manufacturing

POSTED

5 days ago

DEADLINE

in 3 months
View Details
NAICS: 811310
SLED
CHEMICAL MANAGEMENT PROGRAM AND TREATMENT CHEMICALS
Solicitation # 6635-26
The City of Spokane is soliciting proposals under IRFP 6635-26 for a comprehensive Chemical Management Program and treatment chemicals to support the 24/7/365 operations of the Waste to Energy Facility in Spokane, Washington. The scope of work includes providing treatment chemicals to protect boilers and component cooling water systems, supplying lab reagents for water testing and control, and providing necessary equipment such as tanks and feed pump systems. The resulting contract will have an initial two-year term starting April 1, 2027, with options for three one-year renewals, not to exceed a total of five years. Award will be based on the proposal most favorable to the City, evaluated on a 200-point scale focusing on requirements rather than solely on the lowest cost. To be deemed responsive, proposers must be licensed to do business in Washington and possess at least five years of experience managing chemical programs for high-pressure boilers exceeding 900psig. This experience must align with ASME Consensus and ABMA Boiler Water Quality requirements. Mandatory requirements include attending a pre-bid meeting on November 16, 2026, and submitting a proposal by December 21, 2026, via the city's online procurement portal. The successful contractor must provide an all-inclusive, firm-fixed monthly cost and assume full responsibility for all chemical deliveries. Additionally, the firm must maintain specific insurance coverages, including general liability of 1 million dollars per occurrence and 2 million dollars aggregate, and comply with all OSHA safety specifications and federal nondiscrimination laws.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

about 1 month ago

DEADLINE

in about 1 month
View Details
NAICS: 238990
SLED
Scaffolding Services As-Needed For Boiler Maintenance Outages Scheduled and Unscheduled -Prevailing Wages – Unit Price
Solicitation # 6495-26
The City of Spokane is soliciting bids for ITB 6495-26 to provide as-needed scaffolding services for scheduled and unscheduled boiler maintenance outages at the Waste to Energy Facility in Spokane, Washington. This is a one-year unit price contract with a not-to-exceed amount of 870,000 USD, which may be extended for up to three additional one-year periods for a total maximum duration of four years. The scope includes mobilization, demobilization, and scaffolding for both planned outages and emergency situations, the latter of which requires the contractor to be onsite within six hours of notification. A critical performance requirement mandates that upper boiler scaffolding be completed within eight hours of an outage starting to avoid potential liquidated damages. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must attend a mandatory pre-bid meeting on November 2, 2026, and submit electronic bids via ProcureWare by January 19, 2027. Prequalification requires a Washington State Contractor's License, a UBI number, and evidence of safety programs covering lockout-tagout, fall protection, and confined space entry. Additionally, the awarded vendor must provide P.E. approved-engineered prints for boiler scaffolding at the time of contract signing. Financial requirements include a bid bond of 43,500 USD and specific insurance minimums, including 1,000,000 USD for Workers' Compensation and Auto Liability, and 2,000,000 USD aggregate for General Liability. All work is subject to state prevailing wage laws and strict OSHA and WISHA safety standards.
All Other Specialty Trade Contractors

POSTED

about 2 months ago

DEADLINE

in 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS