Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

BUT-70 Roadway Dip (EA 03-2N940)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The BUT-70 Roadway Dip project, identified as EA 03-2N940 and EFIS 0326000262, is a forecast construction effort managed by the California Department of Transportation Caltrans District 3. Located on State Route 70 at post mile 41.44 in Butte County, the project's primary objective is to repair an undermined section of roadway and failed pavement to eliminate hazards to motorists and prevent further structural deterioration. The scope of work includes the placement of hot mix asphalt, aggregate base, rock slope protection, and Geogrid fabric, as well as striping, traffic control, and other incidental work. The project is classified under NAICS code 237310 and has been determined exempt under CEQA Class 1(d) for existing facilities and categorically excluded under NEPA regulations, as the work repairs failed pavement without expanding the existing facility. Key personnel overseeing the project include Project Manager John Wong, Senior Environmental Planner Joshua Faughn, and Environmental Scientist Jason Ammerman. Environmental determination forms were signed in July 2026, confirming that no significant environmental impacts are expected and no additional agency consultations or permits are required.

General Info

Caltrans to improve State Route 70 in Butte County with asphalt, base, rock protection, geogrid, striping, and traffic control.

Agency

California → Caltrans, District 3 - Marysville/Sacramento

Place of Performance

4 Trees Road and State Route 70, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 3 - Marysville/Sacramento
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 3 - Marysville/Sacramento
Office AddressN/A
Contacts
Jason AmmermanEnvironmental Scientist

Full Description

Show more
California Department of Transportation (Caltrans) placement of hot mix asphalt (HMA), place aggregate base (AB), place rock slope protection (RSP), place Geogrid fabric, striping, traffic control, and incidental work on State Route 70 in Butte County.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 19 days
View Details
NAICS: 237310
New
Federal
Jake Rocks Road Reconstruction
Solicitation # 127EAX27Q0003
Solicitation 127EAX27Q0003 is a Request for Quotation issued by the USDA Forest Service for the Jake Rocks Road Reconstruction project in the Bradford Ranger District of the Allegheny National Forest, located in Warren, Pennsylvania. This total small business set-aside under NAICS 237310 requires a contractor to provide all equipment, labor, and materials to rehabilitate approximately 2.97 miles of designated roads, specifically Forest Road 492 and 492A, as well as two recreational parking areas, two overlook parking areas, and two pull-off areas. The scope of work includes milling and overlaying asphalt, full depth replacement and spot repairs, culvert removal and installation, ditch work, guide rail replacement, the installation of erosion and sedimentation controls, and the construction of accessibility features. All work must adhere to FP-14 Standard Specifications, Forest Service Supplemental Specifications, and MUTCD standards for signage. The contract period of performance runs from November 2, 2026, to September 30, 2027, with a delivery requirement of 135 days after the notice to proceed. Award will be based on the lowest price technically acceptable criteria, evaluating the offeror's technical approach, performance schedule, and a record of three similar projects completed within the last three years. Proposals must be submitted as separate PDF files via email to the designated points of contact by October 26, 2026, at 1:00 PM Eastern Time. Required submission documents include a signed SF1442, a priced Schedule of Items, a technical proposal, and a bid guarantee. The project is subject to the Davis-Bacon Act and requires compliance with Buy American requirements and specific environmental protocols, including the cleaning of equipment to prevent the spread of invasive species on Forest Service lands.
Csa Southwest 7 Usda-Fs

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS