Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Agriculture was posted on May 17, 2007. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C -- Hemlock Dam Removal and Channel Construction Design

Awarded
AG-05K3-S-07-0030Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Engineering And Traffic Surveys Supporting The Town's Speed Limits To Continue Radar Enforcement
Solicitation # 27-004
The Town of Los Gatos, through its Parks and Public Works agency, is soliciting proposals for solicitation number 27-004 to conduct engineering and traffic surveys across 65 designated roadway segments and all existing school zones. The primary objective is to renew the surveys supporting prima facie speed limits to ensure continued legal radar enforcement in compliance with the California Vehicle Code and AB 382. The selected consultant, who must be a California-licensed Professional Engineer qualified in traffic engineering, will perform speed data collection on 31 high-volume segments using radar and 34 low-volume segments using 24-hour mechanical counters. The scope also requires a review of three years of accident history, field checks of each segment, and the delivery of a final engineering report in searchable PDF format containing 85th-percentile speeds and a speed-limit recommendation matrix. The contract is for a one-year term beginning in January 2027 with no option for renewal. Proposers must submit electronic bids by November 27, 2026, and will be evaluated through a two-phase process consisting of a pass/fail responsiveness check followed by a 100-point scoring system based on qualifications, work plan, price, and references. Awardees must maintain significant insurance coverage, including 2 million dollars in general liability, 1 million dollars in automobile liability, and 1 million dollars in professional liability. The agreement includes strict non-discrimination requirements with potential liquidated damages of 100 dollars per day for non-compliance and allows for termination by either party with 15 days written notice. Payment is structured as monthly invoicing with net 30-day terms.
Parks and Public Works

POSTED

about 8 hours ago

DEADLINE

in 29 days
NAICS: 541330
New
SLED
On-Call Structural and Seismic/Disaster Engineering Services
Solicitation # FAS 2026-037
The City of Seattle Finance and Administrative Services Capital Development division is seeking to establish two on-call contracts for professional structural and seismic/disaster engineering services under solicitation FAS 2026-037. The selected consultants will provide technical expertise on an as-needed basis for small to medium projects throughout the planning, design, procurement, and construction phases, utilizing delivery methods such as Design-Bid-Build, Job Order Contracting, and the Small Works Roster. The scope of work includes structural engineering studies, seismic evaluations, confidence testing, fall protection design, and the preparation of construction documents stamped by a licensed engineer. All deliverables must adhere to specific CAD standards, including software compatibility with AutoCAD 2025.1.3 and AIA/US National CAD Standard V5. Eligible firms must be licensed to practice in Washington State and the City of Seattle, demonstrate experience with current code compliance, and provide three relevant projects completed within the last seven years. The contract features an initial one-year term with up to four optional one-year renewals, for a maximum duration of five years. Evaluation of proposals is based on relevant technical experience (40 percent), approach and methodology (30 percent), and an inclusion plan (15 percent) focusing on women and minority-owned businesses. Responses are due by December 2, 2026, via the OpenGov portal, with a target contract execution date of December 15, 2026. Consultants are required to maintain Commercial General Liability insurance and comply with various local and federal regulations, including ADA and City of Seattle labor ordinances.
Finance and Administrative Services

POSTED

about 16 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The U.S. Department of Agriculture Forest Service is seeking architect and engineering services for the Hemlock Dam removal and channel construction project on the Mt Adams Ranger District near Carson, Washington. The selected firm will be responsible for conceptual and final construction documents, cost estimation, and consulting services throughout the construction phase. The project objective is to restore historic fish passage and natural stream processes by decommissioning the dam, removing sediments, constructing a new channel using native materials, and rehabilitating riparian vegetation in compliance with federal, state, and local regulations. This procurement is a 100 percent set aside for HUBZone small business concerns under NAICS code 541330, though non-HUBZone firms may submit qualifications if an adequate number of qualified HUBZone firms are not identified. Evaluation is based on the Brooks Act, focusing on professional qualifications, specialized experience in natural channel design and dam removal, capacity to meet timelines, past performance, geographical proximity to the site, and management quality. Interested firms must submit a Standard Form 330 by June 18, 2007, for a performance period estimated to run from July 16, 2007, through December 31, 2008, or until construction is complete.

General Info

Contract Value

$236,540

NAICS

541330 - Engineering Services

Place of Performance

Gifford Pinchot National Forest, 10600 NE 51st Circle, Vancouver, WA 98682, WA, USA

Set-Aside

HZC

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Gifford Pinchot National Forest
Contacts1 person available
OfficeVANCOUVER, WA, 98661, USA
Office AddressVANCOUVER, WA, 98661, USA
Contacts
Justin C HolderContracting Officer

Full Description

Show more
The U.S. Department of Agriculture, Forest Service, Pacific Northwest Region has a requirement for Architect/Engineering Services for design of a dam removal and channel construction project on the Mt Adams Ranger District near Carson, Washington. Required services will include conceptual design document preparation, preparation of final construction documents, including all appropriate architectural and engineering disciplines, and a firm estimate of construction cost. In addition, applicants must provide consulting services through the construction period. The completed channel and surroundings shall be designed to restore historic fish passage, to incorporate native materials in the design, to permit natural stream processes such as floods, sediment movement and deposition, and to retain the capability for channel adjustment in response to disturbance.Design services are required for the decommission and disposal of the dam and associated facilities, removal of sediments from behind the dam, and for construction of a channel through the stream reach currently occupied by the reservoir or influenced by the dam. Disposal of construction materials from the dam and associated facilities, and disposal and stabilization of sediments will be part of the design, as will water management during construction activities. In addition, designs will include site prep and post-dam removal rehabilitation to restore native riparian vegetation to the disturbed areas. Constructed channel and all site rehabilitation and water management shall meet Federal, State and Local regulations and standards. The applicable NAICS code for this project is 541330 with a corresponding size standard of $4.5 million. This procurement is 100% set aside for HUBZone small business concerns. Both HUBZone and non-HUBZone firms are encouraged to submit their Standard Form (SF) 330 in response to this announcement. In the event that there are an inadequate number of SF 330s received from interested HUBZone firms that are evaluated and ranked as highly qualified, SF 330s from non-HUBZone firms will be considered. Firms will be evaluated and ranked in accordance with the terms of the Brooks Act. The estimated contract start date is July 16, 2007 with the performance period running through December 31, 2008 or until project construction is complete. Evaluation Criteria The following factors will be used for the purpose of evaluation and determination of the most highly qualified firms, among which the awardees will be selected. Submitted SF 330?s should address these areas specifically: 1) Professional qualifications necessary for satisfactory performance of required services (25%). Of importance to the Government in establishing a firm as highly qualified in this area will be: a) A designer of record professionally registered in their discipline and licensed in the state of Washington. b) The presence of highly qualified personnel in key applicable positions such as Engineers, Hydrologists, Aquatic Biologists, and Fluvial Geomorphologists. 2) Specialized experience and technical competence in the type of work required (25%). Of importance to the Government in establishing a firm as highly qualified in this area will be: a) Recent successful experience in designs of natural channels with bankfull discharges of 1500 cubic feet per second or greater. b) Experience managing surface and subsurface water in construction areas and on similar-sized streams to maintain water quality at levels that meet state standards and permit requirements. c) Experience incorporating deformable banks and prioritizing use of native materials into project designs. d) Experience designing and implementing dam removals of similar scale. e) Experience working in streams in steep mountainous terrain characteristic of the Pacific Northwest. 3) Capacity to accomplish the work in the required time (10%). Of particular importance to the Government in establishing a firm as highly qualified in this area will be: a) The ability to provide design services in a timely fashion starting immediately upon issuance of the notice to proceed. b) The availability of assistance during the construction phase, and the ability to provide that assistance in a timely fashion. 4) Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules (15%). In establishing a firm as highly qualified in this area the Government will be looking for the following: a) A record of successful work in systems of similar scope, scale and characteristics. b) Past work that has been constructed and in place long enough to establish long term project success on streams of the scale indicated above. c) Breadth of experience in channel designs that includes multiple projects of similar scope and scale as identified under this advertisement (i.e. including natural channel design, removal of concrete dams, site restoration). d) A record of responsiveness and the ability to work with construction firms during the construction phase of projects. 5) Location in the general geographical area of the project and knowledge of the locality of the project (5%). Of particular importance in establishing a firm as highly qualified in this area the Government will look for: a) The ability to make frequent scheduled and unscheduled visits to the construction site during construction activities and an office work environment close enough to the project to allow for rapid exchange of work products during construction. b) Firms located such that response time for scheduled and unscheduled field visits will not unduly affect construction activities, or add significant cumulative costs to the project. c) A preference will be shown for firms that are able to meet a three hour response time to the project location during the construction assistance phase of the project. Due to the importance of response time during the construction phase, a firms location in proximity to the project site will be considered with closer being viewed as better. 6) Organization, management and quality control (20%). In evaluating firms on this criterion, those viewed as highly qualified will have: a) The ability to design and provide technical services during construction for complex aquatics projects that require sequencing of multiple construction activities. b) An established and successful working relationship between all team members that work under this contract, and clear lines of authority on the proposed team. c) Experience in working outside the firm?s typical area of operation, and have established methods to ensure quality control under these circumstances. SF 330s will be evaluated to determine the most highly qualified firm based on criteria responses. Evaluating past performance and experience may include review of information provided by the firm, customer inquires, Government databases, and publicly available sources. Failure to provide requested data, inaccessible points of contact, or invalid phone numbers could result in a firm being considered less qualified. SUBMISSION PACKAGE REQUIREMENTS The SF 330 is limited to 75 single-sided pages. Minimum font size is 10. Submit five (5) copies of SF 330 for the prime offeror (SF 330 should also include team?s key sub consultants). Firms with branch offices and consultants must submit Part II of Standard Form 330 that should include project samples. Firms must separately address the evaluation factors and relate where information can be found in the submittal package relevant to each factor. Interested firms capable of performing the services described herein are invited to respond by submitting a completed Standard Form 330, Part I and Part II, to the office address listed above by June 18, 2007. Firms shall provide one (1) original and four (4) copies of their entire proposal. The submittal should be forwarded with a cover letter that states the firm is requesting consideration for Solicitation Number AG-05K3-S-07-0030 and identifying whether the firm providing the submittal is a HUBZone or non-HUBZone firm. Personal interviews may be scheduled for firms ranked as most highly qualified. Firms slated for interviews may be asked to explain management and design team components, quality control process; and to provide design solutions to actual/hypothetical projects, etc. Elaborate presentations are not desired. Site visits will not be arranged during the period of this advertisement.

More opportunities from Department Of Agriculture → Gifford Pinchot National Forest

Same awarding agency

NAICS: 238290
Federal
Johnston Ridge Observatory Backup Generator Repairs Gifford Pinchot National Forest
Solicitation # 1240BD27Q0009
Solicitation 1240BD27Q0009 is a Request for Quotation issued by the USDA Forest Service for a Firm-Fixed Price contract to provide inspection, scheduled maintenance, and system repair for the backup diesel generator system at the Johnston Ridge Observatory in Toutle, Washington. The equipment consists of a Simpower Generator Systems 1000KW, 1250KVA system featuring a Mitsubishi engine and a MagnaMax Synchronous AC Generator. The scope of work includes manufacturer recommended service maintenance up to 3,000 hours for the engine, radiator, exhaust, diesel fuel systems, controller, alternator, and automatic transfer switch, as well as repairs for any existing malfunctions. This acquisition is a Total Small Business Set-Aside under NAICS code 238290. The award will be granted to the offeror with the highest technical rating, provided the price is fair and reasonable and past performance is acceptable. The government will not necessarily select the lowest-priced quote. Qualified offerors must submit three separate attachments containing technical approach, pricing via the provided SF-1449 and Schedule of Items, and past performance documentation. All submissions must be emailed to Jorge Somoza by November 3, 2026, at 2:00 PM PST. Once awarded, the contractor must commence work within 14 calendar days of the notice to proceed and complete all services within 90 days. Compliance with FAR Part 12 for commercial items and SAM registration is required.
Other Building Equipment Contractors

POSTED

9 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS