Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Commerce was posted on May 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C--Manchester Pier Shimming Project

Closed
1305M326Q0067Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract titled "Manchester Pier Shimming Project" (Solicitation Number 1305M326Q0067) issued by the Department of Commerce NOAA aims to address structural restoration at Manchester Pier in Port Orchard, Washington. This design-build project involves shimming over 60 non-bearing or partially bearing timber piles to restore vertical load paths and improve the pier’s stability. The contract, posted in May 2026 with a response deadline later that month, calls for compliance with detailed technical and environmental standards, incorporating design, construction, and documentation phases within a 180-day performance period. The scope emphasizes the need for contractors to deliver pre-final and final design packages, conduct the installation with photographic documentation, and provide comprehensive as-built reports. Key project constraints include working within tidal conditions and adhering to environmental protection requirements. The work location is managed by the NOAA office in Seattle, WA, with Sarah Waugh designated as the primary point of contact. This contract falls under NAICS code 237990, which concerns specialized foundation, structure, and building exterior contractors. The comprehensive scope of work ensures that contractors not only restore structural integrity but do so in a manner that respects both operational and ecological considerations.

General Info

Design-build project shimming 60+ timber piles at Manchester Pier within 180 days, meeting environmental standards.

Agency

Department Of Commerce Noaa

NAICS

237990 - Other Heavy and Civil Engineering Construction View NAICS

Place of Performance

WA

Set-Aside

NONE

Documents

(12)

Amendment 0001 to Solicitation 1305M326Q0067

PDFamendment

2026_04_30_-_Contractor_Site_Visit_Sign-In_Sheet_0001.pdf

PDF

Amendment 0002 to Solicitation 1305M326Q0067

PDFamendment

1305M326Q0067_SOW_A5_Storage_and_Laydown_Area_0001.jpg

JPG

1305M326Q0067 Statement of Work Appendix A - Locations Requiring Shimming and Stubs

PDFsow

WA20260126 Davis-Bacon Wage Determination for Kitsap County Heavy Construction

PDFwage-determination

1305M326Q0067 Manchester Pier Inspection Report Amendment 1

PDFsow

1305M326Q0060_SSN_A1_SOW Draft 1 - Manchester Pier AMP Shimming Project

PDF12 pagessow

image_%289%29_0002.png

PNG

1305M326Q0067 Manchester Pier AMP Shimming Project SOW Draft 2

PDF12 pagessow

Solicitation 1305M326Q0067 Manchester Pier Shimming Project

PDFifb

Manchester Pier Load Rating Analysis Report 1305M326Q0067

PDFsow

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Amendment 2

Contract was updated

Posted

Combined Synopsis

Amendment 3

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Noaa
Contacts1 person available
OfficeSEATTLE, WA, 98115, USA
Organization / Agency
Department Of Commerce Noaa
Office AddressSEATTLE, WA, 98115, USA
Contacts

Full Description

Show more
Manchester Pier Shimming Project Amendment 0002 Laydown/Storage update