This Pre-Solicitation opportunity from Department Of Veterans Affairs was posted on November 14, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C1DA--AE Construct Contingency Water Supply Commissioning Project # 583-17-102 Request for SF 330s

Closed
36C25024R0037Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 CPRG NCD SOQ
Solicitation # 2026-SOQ-004
The City of Rogers is soliciting Statements of Qualifications (SOQ) under solicitation number 2026-SOQ-004 for Natural Channel Design services to restore approximately 4,200 linear feet of stream in an urban setting. The scope of work includes engineering, plan design, hydrologic and hydraulic modeling, and the procurement of all necessary local, state, and federal regulatory permits, including potential Letter of Map Revision submissions to FEMA. This project is funded by the Climate Pollution Reduction Grant (CPRG) subaward CPRG-NWA-001 and EPA award 02F75801, requiring compliance with EPA nondiscrimination regulations, Title VI of the Civil Rights Act of 1964, and 40 CFR Parts 5 and 7. Key milestones include the completion and approval of construction plans and permit applications by May 1, 2027, with final construction completion targeted for December 31, 2027. Selection is based on a ranking of qualifications rather than price, with the highest-ranked firm invited to negotiate a contract. Evaluation criteria focus on professional staff expertise, past performance, understanding of the scope, and the quality of the work plan. Interested firms must submit a PDF via OpenGov or hard copy to Colt Craig by November 10, 2026. Submissions are limited to 25 pages and must include Standard Form 330 Part II, an Equal Employment Opportunity policy, the Arkansas DFA Illegal Immigrant Contractor Disclosure Form, and EPA certifications regarding debarment and lobbying for contracts exceeding 100,000 dollars. Additionally, firms must maintain active registration in SAM.gov and demonstrate a commitment to DBE goals through six good faith efforts in subcontracting per 40 CFR 33.301.
Community Development

POSTED

about 2 hours ago

DEADLINE

in 12 days
NAICS: 541330
New
International
Pump Optimisation and Aeration Efficiency Analysis
Solicitation # FA2253
Thames Water Utilities Limited is establishing a single-lot, sole-supplier framework agreement under solicitation FA2253 for pump optimisation and aeration efficiency services. The contract focuses on the monitoring, testing, and analysis of pumping and aeration systems across approximately 60 operational sites, encompassing roughly 200 tests during the AMP period. The primary objective is to reduce whole-life costs and improve operational performance through a structured delivery model that includes site identification, efficiency studies, and performance monitoring. The agreement will feature fixed pricing structures based on an agreed rate card and will be managed through key performance indicators to ensure strategic partnership and continuous improvement. The contract is scheduled for an initial three-year term starting May 10, 2027, with potential extensions up to a maximum of eight years, ending May 9, 2035. Eligible suppliers must demonstrate a proven track record of delivering measurable savings and innovation and must have the capacity to operate within London, the Thames Valley, and the Home Counties. Award selection is based on a 50% technical and 50% commercial weighting. The procurement process is a multi-stage procedure requiring a Pre-Selection Questionnaire via SAP Ariba by October 19, 2026, followed by an Invitation to Negotiate stage. Successful providers must also meet stringent insurance requirements, including 15 million pounds for public and products liability and 10 million pounds for professional indemnity.
Thames Water Utilities Limited

POSTED

about 3 hours ago

DEADLINE

N/A
NAICS: 541330
New
SLED
Request for Qualifications - Conn Dam Stability Assessment, Spillway Improvements, and Feasibility Alternatives Study
Solicitation # 2026-RFQL-054
The City of Napa Utilities Department is seeking a qualified consulting team through Request for Qualifications 2026-RFQL-054 to perform a stability assessment, spillway improvements, and a feasibility alternatives study for the Conn Dam. The project is driven by requirements from the California Department of Water Resources Division of Safety of Dams (DSOD), which identified that the existing spillway does not meet current Probable Maximum Flood (PMF) design criteria and raised concerns regarding the long-term geotechnical stability of the dam embankment. The selected consultant will be responsible for conducting comprehensive subsurface explorations, performing static and seismic slope stability evaluations, and recommending alternatives to mitigate spillway deficiencies. Additionally, the scope includes evaluating options to increase reservoir storage capacity to enhance water supply reliability and flood protection, while supporting future U.S. Army Corps of Engineers (USACE) feasibility studies. This procurement follows a Qualifications-Based Selection process per the Brooks Act, where the award is based on technical capability and experience rather than cost. Evaluation is a two-step process consisting of a Statement of Qualifications weighted at 70 percent and optional oral interviews weighted at 30 percent. A critical project milestone is the submission of a comprehensive geotechnical investigation report to the DSOD by December 31, 2028. The contract requires strict adherence to federal and state regulations, including 2 CFR Part 200 Uniform Guidance, the Build America Buy America Act, and various civil rights and accessibility certifications. Statements of Qualifications are due by October 29, 2026, via the City's Opengov procurement portal.
Utilities Department

POSTED

about 4 hours ago

DEADLINE

in about 5 hours

General Info

NAICS

541330 - Engineering Services

Place of Performance

Department of Veterans Affairs Richard L. Roudebush VA Medical Center 1481 W. 10th St., Indianapolis, OH, 46202

Set-Aside

SDVOSBC

Documents

1

Solicitation 36C25024R0037 - AE Construct Contingency Water Supply Commissioning

DOCX, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 250-NETWORK Contract Office 10 (36C250)
Contacts1 person available
OfficeDAYTON, OH, 45428, USA
Office AddressDAYTON, OH, 45428, USA
Contacts
Jeffery HairstonContract Specialist

Full Description

Show more
Request for SF 330s, AE Construct Contingency Water Supply (Commissioning) Scope of Work The Commissioning Firm shall furnish professional services as a commissioning agent and consultant for project number 583-17-107 Construct Contingency Water Supply project . The project was designed to supply a 500,000-gallon water tower, associated pump house, and all necessary equipment and utilities to complete the system. The project is located at the Richard L Roudebush VA Medical Center addressed 1481 W 10th St, Indianapolis, IN 46202. The Commissioning Agent shall certify that the design and construction meet all applicable federal mandates. The Commissioning Firm will be used as a consultant and subject matter expert to support the Contracting Officer (CO) and Contracting Officer Representative (COR) during construction of the Project. The Commissioning Firm must follow all commissioning standards and procedures listed in the construction specifications included with this solicitation. The Commissioning Firm Shall: Conduct a preliminary review of all drawings and specifications included in the construction documents to ensure compliance with all applicable current codes and regulations. Review all project RFI s, submittals, and shop drawings to ensure compliance with the contract documents. Review of submittals, shop drawings, and RFI s shall be completed, and a response returned to the COR within 3 business days of receipt. Review installation of all specified materials, equipment, and utilities to ensure compliance with the contract drawings and specifications. Develop a commissioning plan. The construction process has already begun. Due to this, the Commissioning Firm is responsible for assessing all in-place work for compliance with the contract documents. The commissioning plan shall indicate a schedule to assess all in-place work in a timely manner to catch up to ongoing construction. The remainder of the commissioning plan shall align with the current project schedule. Critical construction items shall be identified in the commissioning plan. The commissioning plan will be updated if the construction schedule is changed. Perform weekly visits throughout the project duration. A minimum of forty-five (45) site visits should be performed throughout the duration of the contract period in addition to the final site visit taking place during the warranty period. Site visits shall be coordinated to observe critical construction items throughout the project duration. Verify the proper performance of installed components and systems. This shall include inspection and testing of Fire Suppression, Plumbing, and Electrical systems, subsystems, and equipment for compliance. The Commissioning Firm shall conduct equipment startup testing for any applicable equipment installed as part of this project. Provide a detailed report following each site visit describing any items that were not installed according to the contract documents. The report should also describe items that were corrected since the previous site visit and their compliance with the contract documents. This report shall be submitted to the COR within 3 days after conducting a site visit. Provide a plan of remediation for all work found not to be in compliance with the contract documents or applicable codes. This process will include submitting corrective drawings and specifications clearly noting all items needing remediation. Be responsible for clarifying any discrepancies between the construction drawings, specifications, and any applicable codes. The Commissioning Firm shall provide necessary recommendations and drawings to correct any discrepancies. Be available to attend any virtual or onsite meetings at the request of the CO or COR when given a notice of at least 3 business days. Respond to the VA within 24 hours on items clearly designated an emergency. Train the VA s Operations and Maintenance personnel in accordance with the specifications. Monitor construction progress related to the project schedule and notify the COR of any delays. Perform the final punch list noting any items needing remediation prior to project close-out. Assist in the preparation and review of the operation and maintenance manuals for all equipment included in this project. Provide a final commissioning report. Commence work and initial site visit within 7 days of receiving the NTP. Follow and comply with all project applicable commissioning specifications listed on The VA Technical Information Library (TIL) available at http://www.cfm.va.gov/til/index.asp Additional Commissioning Firm Responsibilities: RLR VAMC is a federal facility. Contractors and subcontractors shall comply with all Federal, State, and local laws. The most stringent law shall apply regardless of agency hierarchy. The Commissioning Firm shall utilize all current codes applicable to this project. The Commissioning Firm shall obtain all necessary licenses and/or permits required to perform this work. The Commissioning Firm shall take all reasonable precautions necessary to protect persons and property from injury or damage during the performance of this contract. The Commissioning Firm shall be responsible for any injury to their employees, as we as any damage to personal or public property that occurs during the performance of this contract. The Commissioning Firm shall maintain personal liability insurance and property damage insurance having coverage for limits required by Indiana State Law. No travel for government employees as a result of this project is anticipated. Employees of the Commissioning Firm will be required to travel from their place of business to the place of performance indicated above for the purpose of field investigations, equipment and system testing, weekly inspections, final inspection, training of VA personnel, and closeout document preparation. These costs must be included in the Commissioning Firm s preliminary proposal. The C&A requirements do not apply and a Security Accreditation Package is not required. Safety The Commissioning Firm shall be thoroughly familiar with all rules and regulations regarding safety. A 30-hour OSHA Competent Person shall be permanently present during all work to be performed, and all additional workers shall have a minimum of a 10-hour OSHA certification. All welders, pipefitters, carpenters, electricians, etc. performing work must present a valid certification for their respectable trade. All work associated with this project shall follow the VA regulations concerning safety, infection control requirements, interim life safety measure requirements, parking, personnel access, and proper removal/safe disposal of construction waste and debris, as listed in the specifications and drawings. The Commissioning Firm shall abide by all ICRA requirements that are put into place by the VA infection prevention team. The COR shall provide requirements and forms to the Commissioning Firm. All work will be performed in accordance with the ICRA, but it will be the responsibility of the Commissioning Firm to keep the construction areas clean and to not damage the existing equipment. If during the work, equipment is damaged, the Commissioning Firm will be responsible for any repairs/replacements that are required. Commissioning Firm shall be responsible for storing all necessary equipment or materials at the Cold Springs Road VA Facility. The Commissioning Firm is responsible for insuring all employees. The Commissioning Firm shall ensure all work complies with all applicable codes and regulations. Selection Criteria Proposed Design Team: The qualifications of all individuals which will be used for these services, including the Project Manager, key personnel and any consultants, will be examined. Specialized Experience: Including technical competence in the type of work required, as well as, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials. Capacity: Ability for the firm to accomplish the work in the required time. Location and Facilities of Working Offices: The geographic proximity of each firm and knowledge of the facility will be evaluated. This criterion will apply to the offices of both the Prime Firm and any Consultants. Past Performance/Reputation: standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. This factor may be used to adjust scoring for any unusual circumstances that may be considered to deter adequate performance by an A/E. Record of significant claims: Any record of claims against the firm due to improper or incomplete architectural and engineering services will be evaluated. Teamwork: Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates shall be included as an evaluation criterion when construction period services is included in the statement of work for A-E services. Secondary Evaluation Criteria: Proposed Design Approach for this Project: The overall proposed design philosophy that the design team will use on this project will be evaluated, along with any anticipated problems associated with this type of design and potential solutions. Project Control/Management Plan: The organization of the proposed design team that will be managing the project during both the design and construction phases and techniques of the proposed design team to control the schedule and costs of this project will both be evaluated. Estimating Effectiveness: A review of the ten (10) most recent projects will be conducted to determine how effective the construction cost estimate provided was to the actual bid costs of those projects. Miscellaneous Capabilities: Many other capabilities of the proposed design team will be evaluated, these criteria will include, but not be limited to: Interior Design, CADD applications used, Value Engineering and Life Cycle Cost Analyses, Environmental and Historic Preservation, CPM and Fast Track Construction. Submittal Instructions. a. Mailed or physical/hard copies will not be accepted. b. All eligible, interested and capable contractors shall submit an electronic copy of their SF330s, via email, by the closing time/date of this announcement. c. Send submissions to the contract specialist: contact@example.gov.

More opportunities from Department Of Veterans Affairs → 250-NETWORK Contract Office 10 (36C250)

Same awarding agency

NAICS: 562119
New
Federal
P100--Facility Scrap and Recycling Services — VA Northeast Ohio Healthcare System – Louis Stokes VA Medical Center
Solicitation # 36C25027Q0075
The Department of Veterans Affairs, Network Contracting Office 10, is soliciting quotes for facility scrap and recycling services for the Louis Stokes VA Medical Center and its associated offsite facilities in Cleveland, Ohio. This small business set-aside under NAICS 562119 involves the on-call removal, recycling, and disposal of scrap materials, including metals, wood, plastics, and ceramics. The contractor must pick up materials within 48 hours of notification, with emergent needs addressed within 24 hours. The contract is structured with five ordering periods and a performance end date of October 14, 2031, with a possible six-month extension. Award will be based on a comparative evaluation of administrative compliance, technical approach, price, and past performance. Technical evaluations focus on the methodology for pickup and disposal, communication and ordering plans, quality control, and the ability to remit recycling proceeds to the Agent Cashier within a strict 14-day deadline. Submissions must include specific administrative documents, such as a Certificate of Insurance and a Limitations on Subcontracting Compliance Worksheet, with pricing submitted exclusively in Microsoft Excel format. The contractor must also adhere to VHA Directives for waste-stream reporting and comply with VA cybersecurity and HIPAA privacy regulations.
Other Waste Collection

POSTED

about 6 hours ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS