C1DA--Comissioning of Replace Elevators -- Fort Wayne 610A4-26-201

Closed
36C25026R0023Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 9 hours ago

DEADLINE

in about 1 month

General Info

NAICS

541330 - Engineering Services

Place of Performance

Department of Veterans Affairs VA Northern Indiana Health Care, Fort Wayne, IN, 46805, USA

Set-Aside

SDVOSBC

Documents

1

Solicitation 36C25026R0023 - Commissioning of Replace Elevators Fort Wayne

DOCX, High priority: read this first10 pages · rfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 250-NETWORK Contract Office 10 (36C250)
Contacts1 person available
OfficeDAYTON, OH, 45428, USA
Office AddressDAYTON, OH, 45428, USA
Contacts
Eric SweattContract Specialist

Full Description

Show more
Statement of Work for Commissioning of Project 610A4-26-201, Replace Elevators 1.0 Title of Project: Commissioning of Project 610A4-26-201, Replace Elevators Fort Wayne for the VA Northern Indiana Health Care System Fort Wayne at 2121 Lake Ave, Fort Wayne, IN 46805. 2.0 Background: The Department of Veterans Affairs (VA) will Replace Three Elevators in Building 1 at VA Northern Indiana Health Care System, Fort Wayne Campus, 2121 Lake Ave, Fort Wayne, IN 46805. 3.0 Purpose: Commissioning: Procure a qualified, independent Commissioning Agent (CxA). The CxA is responsible for managing the Cx team, overseeing all Commissioning activities, and ensuring the process is carried out without influence from the design or construction teams. For this document, 'CxA' includes the Commissioning Agent, their staff, or other appointed team members, all of whom must remain independent from other project teams.
Constructability and Coordination review: Have a qualified building professional to independently review the 100% Contract Drawings and Specs. The review should identify potential issues that could affect the construction schedule, cost, or quality before bidding begins. 4.0 Objectives: Commissioning: The project's goal is for the Commissioning Agent (CxA) to handle all commissioning work, reviewing designs, checking construction, confirming everything works, and overseeing the warranty period. These steps cover Design, Construction, Acceptance, and Warranty Phases. The CxA is an independent representative of Veterans Affairs.
Commissioning is a systematic process to verify that building systems perform as intended. This must align with the construction documents and the VA s operational needs. The process covers system documentation, equipment startup, control system calibration, testing and balancing, performance testing, and training. In construction and post-occupancy phases, commissioning aims to meet these contract objectives: Verify that equipment and systems are installed as required and that the manufacturer's instructions are followed Verify and document proper integrated performance of equipment and systems. Verify that Operations & Maintenance documentation is complete. Verify that all components requiring servicing can be accessed, serviced, and removed without disturbing nearby components, including ducts, pipes, cabling, or wiring. Verify that the VA s operating personnel are adequately trained to enable them to operate, monitor, adjust, maintain, and repair building systems in an effective and energy-efficient manner. Document the successful achievement of the commissioning objectives listed above.
1. The commissioning process does not diminish or reduce the responsibility of the Design A/E or construction Contractor(s) to provide a finished, fully functioning product.
The CxA shall perform these services in accordance with the Department of Veterans Affairs Whole Building Commissioning Process Manual and TIL Master Construction Specifications (PG-18-1), Section 01 91 00 General Commissioning Requirements. Commissioning Services include the services identified in the Whole Building Commissioning Process Manual for the design phases identified below. Refer to Whole Building Commissioning Process Manual for complete description of services. The manual is available at: https://www.cfm.va.gov/til/Cx-RCx/CxManual.pdf
The major scope items for this construction project include the following:
Systems To Be Commissioned System Description Conveying Equipment Elevators Interface with other systems (fire alarm, etc) [ASTM testing and certification by others] Electrical Medium-Voltage Electrical Distribution Systems Medium-Voltage Switchgear, Medium-Voltage Switches, Underground duct bank and distribution, Pad-Mount Transformers, Medium-Voltage Load Interrupter Switches, Grounding & Bonding Systems Witness 3rd party testing, review reports Lighting & Lighting Control** Systems Emergency lighting, occupancy sensors, lighting control systems, architectural dimming systems, theatrical dimming systems, exterior lighting and controls Lightning Protection System Witness 3rd party testing, review reports Communications Security Emergency Call Systems Witness 3rd party testing, review reports Integrated Systems Tests Loss of Power Response Loss of power to building, loss of power to campus, restoration of power to building, restoration of power to campus. Fire Alarm Response Integrated System Response to Fire Alarm Condition and Return to Normal Table Notes ** Denotes systems that LEED requires to be commissioned to comply with the Fundamental Commissioning pre-requisite.
The following is the Contract Document Submission crossover chart that identifies Contract Drawing Submission identification and the corresponding Whole Building Commissioning Process Manual identification for this project:
No. Contract Document Submission Whole Building Commissioning Process Manual 1 Schematic Submission SC 2 Design Development Submission DD 3 Construction Document Submission CD 4 Construction Document Bid Set Submission CDBS 5 Final Construction Document Final Design Documents
Commissioning Agent Qualifications: The CxA shall be working through, and reporting to the VA Construction COR. The CxA will be paid by the VA.
Commissioning References: https://www.cfm.va.gov/til/Cx-RCx/CxManual.pdf TIL Master Construction Specifications (PG-18-1), Section 01 91 00 General Commissioning Requirements. This document can be found at https://www.cfm.va.gov/til/spec.asp Construction Project Specifications: To be developed in the design phase. Construction Project Drawings: To be developed in the design phase.
Constructability and Coordination Review: Intent The intent of the Contract Document Review is to provide an independent, comprehensive and structured Constructability and Coordination review of the 100% Submission Contract Document Drawings and Specifications by a qualified construction industry professional(s) to reduce the impact to project construction schedule, cost and quality prior to Bidding.
Review Qualifications Reviewer qualifications must include the following: Reviewer must be experienced in managing contracts, reviewing submittals/ RFI s, participating in progress meetings and have a thorough knowledge of building materials, building techniques, building codes, regulations and sequence of construction. A minimum of 5 years of Contract Document Review experience.
Provide reviewer qualifications/ resume for VA review and approval by the VA Design COR prior to commencement of the review.
Review Checklist Contract Document reviewer to provide the proposed Contract Document Review checklist for review and approval by the VA Design COR prior to commencement of the review.
The Review Checklist should include, but not be limited to the following review areas:
Correct Conflicts (inconsistencies, errors and omissions) Between drawings and specifications Between drawings Between specifications Between all disciplines Clarify Requirements (ability to perform the work) Phasing Staging/ Storage Exterior envelope Buildability Schedule The Contract Document Review is to be completed 21 calendar days after receipt of the 100% Submission Contract Document Drawings and Specifications from the VA and VA approval of the Reviewer Qualifications and Review Checklist. The A/E schedule will be provided to the Reviewer once it has been established.
Deliverables
Before Review Reviewer qualifications/ resume Review checklist After Review Write-up identifying Contract Document Review findings in spreadsheet format Marked-up Drawings as required to convey intent of review findings Marked-up Specifications as required to convey intent of review findings
References VA Master Construction Specifications: https://www.cfm.va.gov/til/spec.asp VA Design Manuals: https://www.cfm.va.gov/til/dManual.asp VA Design Review Checklists: https://www.cfm.va.gov/til/aeDesSubReq.asp VA Whole Building Commissioning Process Manual: https://www.cfm.va.gov/ til/ cx-rcx/ cxmanual.pdf
5.0 Scope of Work: The Commissioning firm shall furnish professional services as a commissioning agent and consultant to the VA for 610A4-26-201, Replace Elevators, Fort Wayne, and the Whole Building Commissioning Process Manual. The Commissioning agent shall certify that the design and construction meet Federal Mandates. The commissioning authority verifies the performance of the components and systems and, to ensure design requirements are met, develops a commissioning plan, including commissioning or requirements in construction documents, verification of installation and performance of commissioned systems (testing and system monitoring), operation/maintenance manuals and training, and a commissioning report. The SOW also includes a Constructability and Coordination review of the 100% Submission Contract Document Drawings and Specifications.. 6.0 Performance Period: The design period of performance for this project is 180 calendar days from the award date. The construction period of performance will be developed and finalized during the design period of performance. 7.0 Place of Performance: Work will mainly take place at the contractor s office. Work is also required at the VA Northern Indiana Health Care System, Fort Wayne. No work at the Government site on Federal Holidays or weekends, unless approved by the Contracting Officer (CO) or their Representative (COR). 8.0 Contract Award Meeting: The contractor must not start work until the CO has held a kick-off meeting or said a meeting is not needed. 9.0 Specific Mandatory Tasks and Associated Deliverables: Commissioning Based on activities identified in the VA Whole Building Commissioning Process Manual Design Phase SC Schematic Submission Work with A/E to develop and provide the Owner s Project Requirements (OPR). Review A/E Design Narrative/ Design Requirements Review of Basis of Design (BD) Submission and provide Design Phase Commissioning Issues Log Provide Design Phase Commissioning Plan/ Schedule Provide Outline Commissioning Specifications Attend SC Design Review Meeting SC A/E Design Review Comment Follow-up - Incorporate into revised Design Phase Commissioning Issues Log
DD Design Development Submission Review/ update the current A/E Design Narrative/ Design Requirements Review 35% Schematic Design Submission and update Design Phase Commissioning Issues Log Set up and attend Controls Meeting No. 1 with A/E and provide meeting minutes Provide updated Design Phase Commissioning Plan/ Schedule Provide Draft Construction Phase Commissioning Plan/ Schedule Provide Draft Commissioning Specifications Attend DD Review Meeting DD2 Design Review Comment Follow-up - Incorporate into revised Design Phase Commissioning Issues Log
Construction Documents/ CD Review/ update/ reconcile the current A/E Design Narrative/ Design Requirements Review Submission and update Design Phase Commissioning Issues Log Provide updated Design Phase Commissioning Plan/ Schedule Provide updated Construction Phase Commissioning Plan/ Schedule Provide Preliminary Commissioning Specifications Provide Preliminary Pre- Functional Checklists (PFC s) Provide Preliminary Systems Functional Test Procedures (FPT s) Set up and attend Controls Meeting No. 2 with A/E and provide meeting minutes Attend CD Review Meeting CD Design Review Comment Follow-up Incorporate into revised Design Phase Commissioning Issues Log
Construction Document Bid Set/ CDBS Review/ update/ reconcile current A/E Design Narrative/ Design Requirements Review Submission and update Design Phase Commissioning Issues Log Provide updated Design Phase Commissioning Plan/ Schedule Provide updated Construction Phase Commissioning Plan/ Schedule Provide Final Project Commissioning Specifications Provide Draft Pre-Functional Checklists (PFC s) Provide Draft Systems Functional Performance Test Procedures (FPT s) Set up and attend Controls Meeting No. 3 with A/E and provide meeting minutes Attend CDBS Review Meeting CDBS Design Review Comment Follow-up Incorporate into revised Design Phase Commissioning Issues Log
Final Construction Document Submission/ Final Design Documents Provide Final Design Narrative Review Final Construction Document Submission and update Design Phase Commissioning Issues Log Provide updated Construction Phase Commissioning Plan/ Schedule Provide Final Commissioning Specifications Provide Design Phase Commissioning Report
Construction Phase Set up and lead Construction Phase Commissioning Kick Off Meeting and prepare meeting minutes. Update Construction Phase Commissioning Plan to reflect team members Provide a Commissioning Duration Schedule Review all pertinent project Shop Drawings, Submittals, RFI s and Change Orders necessary to support the Commissioning Process and provide comments Set up and run a Construction Phase Controls meeting with the DDC Programmer, A/E Commissioning Agent and VAMC Periodically Review and Update Construction Phase Commissioning Plan as necessary based on work completed in the items above Conduct Site Visits and provide Site Observation Reports and updated Construction Phase Commissioning Issues Log Attend monthly Construction Phase Commissioning Team Meetings (by telephone) and develop Meeting Agenda and Meeting Minutes Develop Final Pre-Functional Checklists (PFC s) Develop Final Systems Functional Performance Testing (FPT s) Procedures Review Operations and Maintenance Manuals submitted by Contractors and update the Construction Phase Commissioning Issues Log Review Contractor Equipment Startup Checklists, and update the Construction Phase Commissioning Issues Log
Acceptance and Testing Phase Provide Executed Functional Performance Tests and supporting documentation Provide Long Term Trend Data and Analysis of integrated system performance Prepare Project Systems Manual Review and attend contractor required training as required in the specifications Provide Final Commissioning Report
Warranty Phase Provide current Commissioning Issues Log
Constructability and Coordination Review Reviewer qualifications/ resume Review checklist Write-up identifying Contract Document Review findings in spreadsheet format Marked-up Drawings as required to convey intent of review findings Marked-up Specifications as required to convey intent of review findings
Attachment A: Schedule of Deliverables
Deliverable No. Item Quantity Due Date 1 Schematic Submission
40 calendar days from NTP to SC 2 Design Development Submission 1 84 calendar days from NTP to DD
3 Construction Document Submission 1 128 calendar days from NTP to CD 4 Construction Document Bid Set Submission 1 157 calendar days from NTP to 95% CDBS
5 Final Construction Document 1 180 calendar days from NTP to 100% FDD 6 Construction Phase 1 TBD, based on final Construction Schedule 7 Acceptance and Testing Phase 1 TBD, based on final Construction Schedule 8 Warranty Phase
1 TBD, based on final Construction Schedule
- - - END OF SCOPE - - -
SUBMITTALS INSTRUCTIONS: All interested and capable vendors are to submit a hard copy SF330 package for review. The SF330s can be delivered to the address below (only):
Department of Veterans ATTN: Eric Sweatt Network Contracting Office (NCO) 10 8888 Keystone Crossing Suite 325 Indianapolis, IN 46240 Solicitation: 36C25026R0023
The package must be received in government control no later than 1/15/2026 at 11:00 A.M. EST. This is only for this location; no other locations are to be included.
EVALUATION CRITERIA: The government will evaluate each potential contractor under the terms of its: Professional qualifications necessary for satisfactory performance of required services. Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials. Capacity to accomplish the work in the required time. Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. Location in the general geographical area of the project and knowledge of the locality of the project; provided that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project; and Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract change to include drafting statements of work cost estimates. A selection board has been appointed to complete the functions required by FAR 36.602-3, under the short selection process outlined in FAR 36.602-5(a).
END OF ANNOUNCEMENT

More opportunities from Department Of Veterans Affairs → 250-NETWORK Contract Office 10 (36C250)

Same awarding agency

NAICS: 811210
New
Federal
J066--Sakura Service Agreement | Base 4OY | Start: 1/21/27 | Columbus VAACC
Solicitation # 36C25027Q0049
The Department of Veterans Affairs Network Contracting Office 10 is soliciting a full-service maintenance agreement for Sakura instruments located at the Chalmers P. Wylie Ambulatory Care Center in Columbus, Ohio. The scope of work includes planned and corrective maintenance, emergency services, labor, parts, technical support, and travel for Sakura Tissue-Tek processors, Tissue Tek Film CoverSlipper systems, and Tissue Tek Prisma Plus equipment. All services must be performed by qualified field service engineers in accordance with Original Equipment Manufacturer (OEM) specifications. The contract period consists of a base year starting January 21, 2027, with four optional one-year extensions. Award will be based on the Lowest Price Technically Acceptable (LPTA) evaluation method. To be eligible, offerors must provide proof of OEM authorization to perform the required maintenance and repair services at the time quotes are due. Technical submissions must include a detailed maintenance plan, evidence of competency and proficiency with the specified equipment, and a narrative response. The contractor is required to provide field service reports upon completion of work and maintain calibration certifications for all test equipment traceable to OEM standards. Performance hours are designated as Monday through Friday, 7:00 am to 5:00 pm, excluding federal holidays.
Electronic and Precision Equipment Repair and Maintenance

POSTED

5 days ago

DEADLINE

in 10 days
View Details
NAICS: 561621
New
Federal
H312--Fire Alarm and Testing Inspection FY 2027 Services Procurement - 541 Engineering - VAMC CLEVELAND
Solicitation # 36C25027Q0066
The Department of Veterans Affairs is conducting market research through a Sources Sought notice to determine an acquisition strategy for fire alarm testing and inspection services at the Louis Stokes VA Medical Center in Cleveland, Ohio. The objective is to secure a qualified contractor to provide all labor, materials, equipment, and supervision for the preventative maintenance, inspection, and testing of government-owned Notifier fire alarm and fire suppression components. The scope includes annual, semi-annual, and quarterly testing, as well as specialized inspections for elevator devices and kitchen hoods, all of which must comply with NFPA 72 (2022 edition), NFPA 25, OSHA, TJC, and original equipment manufacturer standards. The anticipated contract will be a firm-fixed-price service agreement consisting of a one-year base period with four option years. To be considered capable, contractors must demonstrate a minimum of five years of experience within the last seven years maintaining Notifier systems of similar size and complexity. Requirements include proof of Notifier Dealer status, programming capabilities, and access to parts and technical support. The contractor will be responsible for providing a site-specific safety plan and detailed electronic reports in Excel and PDF formats. This notice is for informational purposes only and is not a solicitation; the government is not seeking pricing or offers at this time. Interested sources must submit their capabilities and references via email to the designated contract specialist by October 30, 2026. The procurement falls under NAICS code 56121 with a small business size standard of 25 million dollars.
Security Systems Services (except Locksmiths)

POSTED

5 days ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS