Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Transportation was posted on November 12, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail

Closed
6982AF19B000019Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 9 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

This project involves the comprehensive reconstruction and replacement of a damaged approximately 2,871-foot-long, ADA-accessible raised timber boardwalk trail in Salt Creek, located within a sensitive natural and cultural environment. The work includes removing debris from the flood-damaged boardwalk, reconstructing the trail along a new alignment that follows the altered stream course caused by recent flooding events, and upgrading related infrastructure such as the trailhead parking lot and a section of roadway with specialized rock embankments. The scope encompasses installing thermally modified timber decking, structural timber, concrete sidewalks, curbing, and timber railings, as well as constructing embankments and installing a vault toilet. The project emphasizes environmental constraints, including paleontological monitoring and limitations on heavy equipment, requiring meticulous planning and execution. Scheduled to be advertised in September 2024, with construction expected from November 2024 through June 2025, the project has an estimated value between $5 million and $10 million. It is set aside exclusively for small businesses under the Total Small Business Set-Aside program, with a focus on contractors experienced in similar large-scale projects within national parks or forests. The contract is managed by the Department of Transportation’s Central Federal Lands Division in Lakewood, Colorado, and involves coordination with environmental and visitor management considerations to ensure timely completion and customer satisfaction. The response deadline for proposals is October 10, 2024.

General Info

Rebuild Salt Creek Interpretive Trail boardwalk in Death Valley, budget $5-10 million.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Death Valley, CA, USA

Set-Aside

SBA

Documents

26

6982AF24B000019 Amendment A001

PDF, High priority: read this firstamendment
High

6982AF24B000019 Amendment A002 - Salt Creek Interpretive Trail

PDF, High priority: read this firstamendment
High

6982AF24B000019 Amendment A003

PDF, High priority: read this firstamendment
High

6982AF24B000019 Amendment A004

PDF, High priority: read this firstamendment
High

6982AF24B000019 Amendment A005

PDF, High priority: read this firstamendment
High

6982AF24B000019 Amendment A006

PDF, High priority: read this firstamendment
High

6982AF24B000019 - Salt Creek Interpretive Trail

PDF, High priority: read this firstifb
High

6982AF24B000019 - Salt Creek Interpretive Trail Q&A

PDF, High priority: read this firstq-and-a
High

6982AF24B000019 - Salt Creek Interpretive Trail Q&A

PDF, High priority: read this firstq-and-a
High

6982AF24B000019 - Salt Creek Interpretive Trail Q&A

PDF, High priority: read this firstq-and-a
High

6982AF24B000019 - Salt Creek Interpretive Trail Q&A

PDF, High priority: read this firstq-and-a
High

CA ERFO NP DEVA 2022-1(2) Salt Creek Interpretive Trail - Cross Sections

PDF, High priority: read this firstspecifications
High

CA ERFO NP DEVA 2022-1(2) Salt Creek Interpretive Trail Final Hydraulics Report

PDF, High priority: read this firstspecifications
High

CA ERFO NP DEVA 2022-1(2) Salt Creek Interpretive Trail Geotechnical Memorandum

PDF, High priority: read this firstspecifications
High

Salt Creek Interpretive Trail Plans - CA ERFO NP DEVA 2022-1(2)

PDF, High priority: read this firstspecifications
High

6982AF24B000019 - Salt Creek Interpretive Trail Bid Tabulation

PDF, Low priorityaward
Low

6982AF24B000019 Salt Creek Interpretive Trail - Interested Vendors List

PDF, Low priorityother
Low

6982AF24B000019 - Salt Creek Interpretive Trail Interested Vendors List

PDF, Low priorityother
Low

6982AF24B000019 - Salt Creek Interpretive Trail Interested Vendors List

PDF, Low prioritysources-sought
Low

6982AF24B000019 Salt Creek Interpretive Trail Q&A

PDF, Low priorityq-and-a
Low

6982AF24B000019 - Salt Creek Interpretive Trail Q&A

PDF, Low priorityq-and-a
Low

6982AF24B000019 - Salt Creek Interpretive Trail Q&A

PDF, Low priorityq-and-a
Low

6982AF24B000019 - Salt Creek Interpretive Trail Q&A

PDF, Low priorityq-and-a
Low

6982AF24B000019 - Salt Creek Interpretive Trail Q&A

PDF, Low priorityq-and-a
Low

CA ERFO NP DEVA 2022-1(2) - Salt Creek Interpretative Trail Bid Opening Summary

PDF, Low priorityaward
Low

Salt Creek Boardwalk Site Visit Attendee List - 09/24/2024

PDF, Low priorityspecial-notice
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

17 updates
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Oct 3, 2024 to Oct 10, 2024.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Oct 10, 2024 to Oct 16, 2024.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6982AF Central Federal Lands Divisi
Contacts1 person available
OfficeLAKEWOOD, CO, 80228, USA
Office AddressLAKEWOOD, CO, 80228, USA
Contacts

Full Description

Show more
TOTAL SMALL BUSINESS SET-ASIDE PROJECT DETAILS: CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail This project will consist of replacement and reconstruction of the approximately 2,871-foot-long, ABA accessible, raised timber boardwalk trail (6-feet wide) that was completely destroyed during flash flooding on August 5, 2022. The project also includes removal of remaining portions of damaged and displaced boardwalk from sensitive environmental areas including wilderness, reconstructing the trailhead parking lot, and reconstructing a 400-foot section of roadway with special rock embankment. The boardwalk alignment will be placed in a modified alignment to follow the new post-flashflood stream course (August 2022 and Tropical Storm Hillary August 2023 events). All of the work is occurring in cultural and natural resource sensitive areas and there are numerous environmental constraints including paleontological monitoring, limitations on large equipment in the boardwalk area, and matting that will affect the construction schedule and type of operations. Great attention to detail will be required in achieving customer satisfaction in areas of roadway and parking lot construction, traffic control, visitor relations and timely completion of work. Prior experience on projects of similar magnitude within National Parks, National Forests, or similar environments is required. Principle work items include: 2,100 square yards of thermally modified timber structural decking, 58 thousand board feet measure (MFBM) of structural timber, treated, 5,800 linear feet of timber, 6-inch curbing, 700 linear feet of timber bridge railing, 650 each helical piles (2-7/8, 5-1/2 & 7 diameter), 1,300 square yards of removal of timber boardwalk debris (by helicopter) 2,000 cubic yards of embankment construction, 400 cubic yards of special rock embankment, 680 square yards of concrete sidewalk and pavement, 400 linear feet of concrete curb, and 1 each vault toilet (double occupancy unit) The anticipated advertisement date for the project is September 2024 with construction anticipated from November 2024 to June 2025. The estimated price range of the project work is between $5,000,000 and $10,000,000.

More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi

Same awarding agency

NAICS: 237310
New
Federal
TX FW LGA 10(5) Steve Thompson Wildlife Drive
Solicitation # 6982AF27B000006
Solicitation 6982AF27B000006 is a firm fixed price, small business set-aside contract issued by the Federal Highway Administration for the rehabilitation of Steve Thompson Wildlife Drive and Bayside Drive at the Laguna Atascosa National Wildlife Refuge in Cameron County, Texas. The project covers approximately 12.33 miles of roadway and involves full-depth reclamation of existing chip seal and gravel surfaces, the installation of a new aggregate base course and gravel surfacing, roadway realignment, and widening. Additional scope includes the installation of an aluminum gate, a small concrete pad, safety improvement signs, and 13 brand-name Rubberform Recycled Products modular speed bumps. The estimated project value ranges between 2 million and 5 million dollars. The contract will be awarded to the lowest responsive and responsible bidder based on the total price for Schedule A, which includes Alternate 2. Bidders must also provide pricing for Alternate 1 and Alternate 3, as the government reserves the right to award Schedule A in combination with one of these alternates. Performance must begin within 10 calendar days of the notice to proceed. Compliance requirements include the Davis-Bacon Act for wages, the Buy American Act, and adherence to FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. Bidders must be registered in the System for Award Management under NAICS 237310 and provide original bid bonds and resumes for key personnel.
Highway, Street, and Bridge Construction

POSTED

about 13 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237310
New
Federal
ND NP THRO 204(1) Buck Hill Road
Solicitation # 6982AF25B000004
Solicitation 6982AF25B000004 is an Invitation for Bid for the Buck Hill Road project (ND NP THRO 204(1)) located in Theodore Roosevelt National Park, North Dakota. Issued by the Federal Highway Administration Central Federal Lands Highway Division, the project is a full and open competition with a HUBZone price preference. The estimated cost range is between 5 million and 10 million dollars, with a construction period anticipated from April 2027 through November 2027. The contract is awarded to the lowest responsive responsible bidder based on a single base schedule with no options. The scope of work consists of three primary components: the rehabilitation of approximately 0.75 miles of roadway, deep subexcavation of 1,000 linear feet to stabilize an existing landslide, and the reconstruction and expansion of the Buck Hill Overlook parking lot to accommodate larger vehicles. Key work items include the placement of 2,000 tons of hot asphalt concrete pavement, 5,000 tons of roadway aggregate, 11,000 cubic yards of subexcavation, and the installation of 5,100 linear feet of concrete curb and gutter. The project must adhere to FP-14 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. Administrative requirements include the submission of original bid bonds, resumes for key personnel and superintendents, and compliance with the Davis-Bacon Act. Liquidated damages for construction delays are set at 3,900 dollars per calendar day. Invoicing must be processed electronically through the iSupplier (DELPHI) system. The project also involves specific material standards, such as ASTM A36 structural steel and ASTM A307 galvanized bolts, and requires the use of specific National Park Service matching materials for benches and trash receptacles.
Highway, Street, and Bridge Construction

POSTED

about 13 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237310
New
Federal
OK FW TSM 10(1) NFH Entrance Road and Parking Improvements
Solicitation # 6982AF27B000003
Solicitation 6982AF27B000003 is a firm fixed price contract issued by the U.S. Department of Transportation, Federal Highway Administration, for entrance road and parking improvements at the Tishomingo National Fish Hatchery in Johnston County, Oklahoma. This total small business set-aside project, with an estimated value between 700,000 and 2,000,000 dollars, focuses on road resurfacing, drainage, and safety enhancements. The scope of work includes full depth reclamation of existing asphalt to 6 inches, the application of 3 inches of new asphalt concrete pavement, super elevation correction, and culvert replacement. Additionally, the contractor will construct new parking areas, install two new entrance gates, and ensure the installation of Architectural Barriers Act compliant curb ramps and parking spots. The project is governed by the FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects and requires the implementation of a Stormwater Pollution Prevention Plan. Key deliverables include a comprehensive Operation and Maintenance manual, a minimum five-year material warranty, and a one-year workmanship warranty for gate components. Award will be granted to the lowest responsive responsible bidder. Performance must begin within 10 calendar days of the notice to proceed. The contract includes strict compliance requirements, including Davis-Bacon Act labor standards, Buy American Act regulations, and liquidated damages of 2,600 dollars per calendar day for delays. Invoicing is primarily handled through the DOT DELPHI system.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 14 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS