CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail

Closed
6982AF24B000019Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This project involves the reconstruction and replacement of a damaged 2,871-foot-long, ABA accessible raised timber boardwalk trail within a sensitive environmental area in Death Valley, California. The work includes removing remnants of the previous damaged structure, reconstructing the trail following a new alignment due to recent flood events, and upgrading related infrastructure such as the trailhead parking lot and a 400-foot roadway section with a special rock embankment. The project emphasizes environmental protection, requiring paleontological monitoring, limited equipment use, and careful planning to minimize disturbance in natural and cultural resource areas. The scope of work encompasses extensive timber and concrete construction, debris removal via helicopter, embankment building, and installation of amenities like a vault toilet. Scheduled to be advertised in September 2024 with construction planned from November 2024 to June 2025, the project is estimated to cost between $5 million and $10 million. It is set aside exclusively for small businesses under a total small business set-aside program, with a focus on firms experienced in similar large-scale projects within protected environments such as national parks or forests. The contract is managed by the Department of Transportation’s Central Federal Lands Division, with the primary point of contact being Kelly Palmer. The project aims to restore a critical recreational and interpretive trail while adhering to strict environmental and operational constraints.

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Death Valley, CA, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6982AF Central Federal Lands Divisi
Contacts1 person available
OfficeLAKEWOOD, CO, 80228, USA
Office AddressLAKEWOOD, CO, 80228, USA

Full Description

Show more
THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. TOTAL SMALL BUSINESS SET-ASIDE PROJECT DETAILS: CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail This project will consist of replacement and reconstruction of the approximately 2,871-foot-long, ABA accessible, raised timber boardwalk trail (6-feet wide) that was completely destroyed during flash flooding on August 5, 2022. The project also includes removal of remaining portions of damaged and displaced boardwalk from sensitive environmental areas including wilderness, reconstructing the trailhead parking lot, and reconstructing a 400-foot section of roadway with special rock embankment. The boardwalk alignment will be placed in a modified alignment to follow the new post-flashflood stream course (August 2022 and Tropical Storm Hillary August 2023 events). All of the work is occurring in cultural and natural resource sensitive areas and there are numerous environmental constraints including paleontological monitoring, limitations on large equipment in the boardwalk area, and matting that will affect the construction schedule and type of operations. Great attention to detail will be required in achieving customer satisfaction in areas of roadway and parking lot construction, traffic control, visitor relations and timely completion of work. Prior experience on projects of similar magnitude within National Parks, National Forests, or similar environments is required. Principle work items include: 2,100 square yards of thermally modified timber structural decking, 58 thousand board feet measure (MFBM) of structural timber, treated, 5,800 linear feet of timber, 6-inch curbing, 700 linear feet of timber bridge railing, 650 each helical piles (2-7/8, 5-1/2 & 7 diameter), 1,300 square yards of removal of timber boardwalk debris (by helicopter) 2,000 cubic yards of embankment construction, 400 cubic yards of special rock embankment, 680 square yards of concrete sidewalk and pavement, 400 linear feet of concrete curb, and 1 each vault toilet (double occupancy unit) The anticipated advertisement date for the project is September 2024 with construction anticipated from November 2024 to June 2025. The estimated price range of the project work is between $5,000,000 and $10,000,000.

More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi

Same awarding agency

NAICS: 237310
New
Federal
TX FW LGA 10(5) Steve Thompson Wildlife Drive
Solicitation # 6982AF27B000006
Solicitation 6982AF27B000006 is a firm fixed price, small business set-aside contract issued by the Federal Highway Administration for the rehabilitation of Steve Thompson Wildlife Drive and Bayside Drive at the Laguna Atascosa National Wildlife Refuge in Cameron County, Texas. The project covers approximately 12.33 miles of roadway and involves full-depth reclamation of existing chip seal and gravel surfaces, the installation of a new aggregate base course and gravel surfacing, roadway realignment, and widening. Additional scope includes the installation of an aluminum gate, a small concrete pad, safety improvement signs, and 13 brand-name Rubberform Recycled Products modular speed bumps. The estimated project value ranges between 2 million and 5 million dollars. The contract will be awarded to the lowest responsive and responsible bidder based on the total price for Schedule A, which includes Alternate 2. Bidders must also provide pricing for Alternate 1 and Alternate 3, as the government reserves the right to award Schedule A in combination with one of these alternates. Performance must begin within 10 calendar days of the notice to proceed. Compliance requirements include the Davis-Bacon Act for wages, the Buy American Act, and adherence to FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. Bidders must be registered in the System for Award Management under NAICS 237310 and provide original bid bonds and resumes for key personnel.
Highway, Street, and Bridge Construction

POSTED

about 16 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
Federal
OK FW TSM 10(1) NFH Entrance Road and Parking Improvements
Solicitation # 6982AF27B000003
Solicitation 6982AF27B000003 is a firm fixed price contract issued by the U.S. Department of Transportation, Federal Highway Administration, for entrance road and parking improvements at the Tishomingo National Fish Hatchery in Johnston County, Oklahoma. This total small business set-aside project, with an estimated value between 700,000 and 2,000,000 dollars, focuses on road resurfacing, drainage, and safety enhancements. The scope of work includes full depth reclamation of existing asphalt to 6 inches, the application of 3 inches of new asphalt concrete pavement, super elevation correction, and culvert replacement. Additionally, the contractor will construct new parking areas, install two new entrance gates, and ensure the installation of Architectural Barriers Act compliant curb ramps and parking spots. The project is governed by the FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects and requires the implementation of a Stormwater Pollution Prevention Plan. Key deliverables include a comprehensive Operation and Maintenance manual, a minimum five-year material warranty, and a one-year workmanship warranty for gate components. Award will be granted to the lowest responsive responsible bidder. Performance must begin within 10 calendar days of the notice to proceed. The contract includes strict compliance requirements, including Davis-Bacon Act labor standards, Buy American Act regulations, and liquidated damages of 2,600 dollars per calendar day for delays. Invoicing is primarily handled through the DOT DELPHI system.
Highway, Street, and Bridge Construction

POSTED

about 16 hours ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS