This Pre-Solicitation opportunity from Department Of Transportation was posted on January 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
CA NP MOJA 11(2) 10(2) Kelso-Cima and Kelbaker Roads
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
General Info
Place of Performance
Cima, CA, 92323, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
THIS IS NOT AN INVITATION FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
CA NP MOJA 11(2) 10(2) KELSO-CIMA AND KELBAKER ROADS
FULL AND OPEN COMPETITION WITH HUBZone PRICE PREFERENCE
PROJECT DETAILS:
The Federal Highway Administration, Central Federal Lands Highway Division (FHWA-CFLHD), in coordination with the National Park Service, Mojave National Preserve, is proposing improvements to approximately 56.5 miles of roads within Mojave National Preserve in San Bernardino County, CA to improve safety and visitor access. Improvements primarily include resurfacing, restoration, and rehabilitation, and work is included on the entire 19.3 miles of Kelso-Cima Road, 22.3 miles of South Kelbaker Road, and 14.9 miles of Morningstar Mine Road.
The Kelso-Cima and South Kelbaker Road improvements consist of full depth reclamation of the existing pavement with placement of new asphalt pavement, increasing the roadway width to a consistent 26 feet, minor horizontal/vertical roadway realignment (reconstruction) in select areas, reinforcing 48 low water crossings (11 on South Kelbaker Road and 37 on Kelso-Cima Road), and improving safety with longitudinal and transverse mumble strips, signing, pavement markings, and paved pullouts. Low water crossings typically consist of buried concrete barriers with riprap revetment.
The Morningstar Mine Road improvements consist of full depth reclamation of the existing pavement and placement of surface-course aggregate. Work also includes realignment of Kelso-Cima Road at the Cima Road/Morningstar Mine Road intersection,
The estimated cost for the work is between $80,000,000 and $120,000,000.
The anticipated advertisement date for the project is February 2026 with construction commencement in early/mid 2026. Construction duration is estimated at 24 to 30 months.
The work is occurring in a natural resource sensitive area and there are environmental constraints that will affect the construction schedule and type of operations. Great attention to detail will be required in achieving customer satisfaction in areas of road construction, traffic control, visitor relations and timely completion of work. Prior experience on projects of similar magnitude in is required.
Principle work items include:
110,000 tons of asphalt concrete pavement,
133,000 tons of roadway aggregate,
81,000 tons of aggregate surface course,
110,000 cubic yards of roadway excavation,
49 miles of full depth reclamation, method 2, 6-inch depth,
17,000 linear feet of concrete barrier (low water crossings),
44 miles of fence, tortoise barrier,
2,400 linear feet of tortoise crossing structure, and
12,000 cubic yards of rip rap
More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
