Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Cabinet and Vanity Refacing or Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Oklahoma → Choctaw Nation Housing AuthorityView Agency

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

Idabel, OK, 74745, USA

Set-Aside

NONE

Documents

This scope was carved out of 168797.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

NON-FEDERAL

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOklahoma → Choctaw Nation Housing Authority
ContactsNo contacts available
OfficeN/A
Organization / Agency
Oklahoma → Choctaw Nation Housing Authority
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Repair or replace damaged kitchen and bathroom cabinets and vanities, including hardware upgrades and finish matching.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
Federal
HQ Maintenance Services
Solicitation # HQC01026QE022
The contract is for comprehensive preventive, unscheduled, and emergency maintenance services at the Defense Commissary Agency’s Vogelweh Headquarters in Germany, under solicitation number HQC01026QE022. The contractor must provide all labor, management, materials, and specialized tools to ensure the continuous, safe, and compliant operation of facilities, infrastructure, utilities, and refrigeration systems. Preventive maintenance requires a full initial inventory of equipment and refrigerants, updated semi-annually, with scheduled checks performed as defined. Unscheduled maintenance must be estimated in the Service Order Management System (SOMS) within 14 days of request and completed within 45 days of approval, with delays requiring notification and documentation. Emergency maintenance operates around the clock with a mandatory three-hour on-site response time; repairs under €3,000 must be addressed immediately, while those exceeding that threshold require prior coordination with the Contracting Officer’s Representative. All work orders, inventories, and billing must be managed exclusively through SOMS, with documentation in Microsoft Office formats and all communications in English. The contractor is strictly liable for refrigerant management, including tracking for any unit containing 3kg or more of refrigerant and submitting an annual leak report by January 30. A two-year legal guarantee on all parts and installations is mandated by EU Directive 2019/771, with non-conforming work requiring correction within seven days or facing cancellation without payment. The contractor must maintain a workforce capable of performing at least 70% of work internally, with all personnel proficient in English. A Contract Manager and Alternate with 24-hour accessibility must be designated and registered with the Contracting Officer and COR. Personnel must wear company uniforms, visible photo ID badges, and appropriate safety gear while on base, with access restricted to direct employees unless special arrangements are made for specialists. A mandatory 30- to 45-day Phase-In Period is required upon award to verify inventory, install labels, establish emergency contact procedures, produce an annual preventive maintenance schedule, and submit a Quality Control Plan and Safety Plan within 30 days of the Notice to Proceed. All equipment must be labeled with pre-numbered blue-background, white-text vinyl tags using a three-letter facility code and six-digit number, permanently affixed in visible yet non-customer-facing locations, without contractor branding. Monthly reports including completed work summaries, funds remaining, and PM service lists are due with invoices, while quarterly PM findings and semi-annual
Defense Commissary Agency- Eur Area

POSTED

about 11 hours ago

DEADLINE

in 10 days
View Details

More opportunities from Oklahoma → Choctaw Nation Housing Authority

Same awarding agency

NAICS: 236118
New
SLED
NON-FEDERAL
Solicitation # 168797
The Choctaw Nation Housing Authority is seeking qualified contractors to rehabilitate a 3-bedroom, 2-bathroom brick home approximately 1500 square feet with a shingle roof and slab foundation located in Idabel, Oklahoma. The project requires comprehensive interior and exterior renovations to return the property to move-in ready condition, including full removal and replacement of damaged drywall, flooring, windows, doors, cabinetry, plumbing fixtures, and electrical components. All work must meet or exceed the 2019 International Residential Code and include new waterproof vinyl plank flooring, Delta-branded faucets and mixing valves, new kitchen and bathroom sinks with goose neck faucets, replacement of both bathroom toilets and mirrors, installation of battery-operated smoke detectors, and new pre-hung insulated metal doors with keyed-alike Kwikset hardware. The property will require complete cleaning, debris removal, removal of exterior cameras, restoration of all utilities as needed, and full repainting of interiors and trim. Exterior improvements include gutter repairs with new elbows and splash blocks, fencing repairs using black vinyl chainlink with new posts and latches, and full landscape remediation involving removal of shrubs, grass, rocks, and vines, followed by grading, mulching, and bringing the yard to mowable condition. The HVAC system must be serviced with new filters installed, and new return vents and registers added. Appliances require disposal of the existing refrigerator and stove, cleaning and verification of the dishwasher, and procurement and installation of a new washer and dryer. All window stools, sills, screens, and mini blinds must be replaced or repaired, and all measurements, material quantities, permits, line locates, and cleanup responsibilities fall entirely on the contractor. A mandatory site visit is required prior to bidding, and no change orders will be approved for conditions observable during that visit. The Property Manager, Carla Grimmett, and Inspector, Corey James, are the primary points of contact, and all color selections will be made by the homeowner or property manager. Bids are due by August 21, 2026, and responses must be submitted through the designated portal.
Residential Remodelers

POSTED

2 days ago

DEADLINE

in 10 days
View Details