Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cable Creek Basin (Upper) RFP

Closed
PWG126-ADMIN-6438State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 9 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 15 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The San Bernardino County Flood Control District is soliciting engineering design services for the Cable Creek Basin (Upper) project under RFP PWG126-ADMIN-6438. The primary objective is to reduce peak flow rates into the basin through a scope of work that includes hydrology and hydraulic analysis, geotechnical services, utility coordination, and environmental compliance with CEQA and NEPA. The selected consultant will be responsible for delivering a series of progress packages, culminating in 100 percent Plans, Specifications, and Estimates (PS&E) and a final drainage report. The contract term extends up to five years, from August 2026 to August 2031, with performance located in San Bernardino, California. Proposals are evaluated based on a best-value trade-off approach, prioritizing qualifications and experience (35 percent), technical review (25 percent), scope of work (25 percent), and references (15 percent). Submission requirements are strict: the main proposal must be submitted electronically via the County Electronic Procurement Network (ePro), while the fee proposal (Attachment E) must be delivered in a separately sealed physical envelope. Following Addendum No. 1, the final response deadline is September 4, 2026. Awarded contractors must adhere to California prevailing wage determinations and maintain professional licensing for civil engineering, land surveying, and geotechnical services.

General Info

Submit proposals by September 4, 2026, to San Bernardino, CA, via ePro or hard copies only.

Documents

6

Addendum No. 1 to RFP PWG126-ADMIN-6438 Design of Cable Creek Basin

PDF, High priority: read this firstamendment
High

California Prevailing Wage Determination C-14-X-2-2026-1

PDF, High priority: read this firstwage-determination
High

RFP-PWG126-ADMIN-6438 Design of Cable Creek Basin

PDF, High priority: read this firstrfp
High

230241CableCreekTopoSBCO2025 dwg

OCTET-STREAM

Cable Creek Field Notes.zip

ZIP

Right of Way Base Map.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Landdevcontracts - Public Works - Land Development & Contracts
Contacts1 person available
OfficeSan Bernardino, CA, 92415-0835, USA
Office AddressSan Bernardino, CA, 92415-0835, USA
Contacts
Michael ReynaPurchaser

Full Description

Show more
Proposals will not be accepted by email or facsimile (not bid questions). Proposals must either be submitted electronically through the County Electronic Procurement Network (ePro) or via (Paper) with three (3) hard copies with original/electronic signature and one (1) digital copy in Universal Serial Bus (USB) drive submitted to the above address. The completed and signed proposal must be received by the Deadline

More opportunities from California → Landdevcontracts - Public Works - Land Development & Contracts

Same awarding agency

New
SLED
Randall Avenue Sidewalk
Solicitation # H15254
Solicitation H15254 is a project issued by the San Bernardino County Department of Public Works for the construction of a concrete sidewalk along the north side of Randall Avenue, extending 0.36 miles from Beech Avenue to Poplar Avenue in Fontana, California. The scope of work includes the installation of new concrete sidewalks, the construction and reconstruction of fifteen ADA-compliant ramps and ladder-style crosswalks, and the removal of specific vegetation. The project is anticipated to be completed within 60 working days, with a performance period starting March 27, 2026, and expiring no later than March 26, 2028. Work must adhere to the 2025 Caltrans Standard Specifications and Standard Plans. The contract will be awarded to the lowest responsible bidder who submits a responsive proposal, including a required Noncollusion Declaration and registration with the Department of Industrial Relations. Bidders must provide a bid security of at least 10 percent of the bid amount, and the successful awardee must provide Labor and Materials and Faithful Performance bonds each totaling 100 percent of the contract price. Compliance requirements include the Build America Buy America Act, general and federal prevailing wage rates, and California Air Resources Board regulations for off-road diesel fleets. The project also emphasizes the use of a Quality Control Program and encourages participation from Emerging Small Business Enterprises and Disadvantaged Business Enterprises.

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details
New
SLED
Muscoy Area Rehabilitation - Phase 1
Solicitation # PWG127-LANDD-6584
The Muscoy Area Rehabilitation - Phase 1 project, solicitation number PWG127-LANDD-6584, is a local government construction contract issued by the San Bernardino County Department of Public Works. The scope of work involves comprehensive pavement rehabilitation, including cold planing asphalt concrete at various thicknesses, the application of Type A asphalt, Type G rubberized asphalt, and Type II rubberized emulsion aggregate slurry. Additionally, the project requires the removal and construction of concrete curbs, gutters, sidewalks, and ADA-compliant ramp detectable warning surfaces. All work must adhere to the 2025 Caltrans Standard Specifications and Standard Plans, with specific requirements for thermoplastic pavement markings and various grades of retro-reflective sheeting for signage. The contract will be awarded to the responsive and responsible low bidder. Bidders must provide a bid security of at least 10 percent of the bid amount and a signed Noncollusion Declaration to be considered responsive. The successful contractor will be required to furnish Labor and Materials and Faithful Performance bonds, each equal to 100 percent of the contract price. Key administrative requirements include compliance with general prevailing wage rates, the Build America Buy America Act for domestic material procurement, and the submission of a detailed Quality Control Program. Proposals are due by December 3, 2026, and can be submitted electronically via the ePro system or as paper submissions to the County Public Works office in San Bernardino.

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
North San Bernardino ADA Ramps
Solicitation # PWG127-LANDD-6577
The North San Bernardino ADA Ramps project, solicitation number PWG127-LANDD-6577, is a local government contract issued by the San Bernardino County Department of Public Works. The scope of work involves installing and updating ADA-compliant ramps, curbs, gutters, and sidewalks at various locations in the Del Rosa area, including specific intersections at Pumalo Street with Osbun Road and Rosena Avenue. Additional deliverables include the removal of two trees and the installation of slot drains and root barriers. The project is anticipated to be completed within 40 working days and must adhere to Caltrans 2025 Standard Specifications and Plans, MUTCD 2014, and SPPWC Standard Plans 2021. The contract will be awarded to the lowest responsive and responsible bidder based on the total price of all items. Bidders must submit a signed proposal, a noncollusion declaration, and a bid security of at least 10 percent of the bid amount via the ePro system or physical delivery by November 19, 2026. The successful contractor must provide a Labor and Materials Bond and a Faithful Performance Bond, each equal to 100 percent of the contract price. Key compliance requirements include registration with the Department of Industrial Relations, adherence to general prevailing wage rates, and certification of compliance with California Air Resources Board regulations. Contractors are also required to maintain project records for three years following final payment and comply with strict nondiscrimination and equal employment opportunity standards.
Highway, Street, and Bridge Construction

POSTED

7 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS