California Street Northbound Off-Ramp Relocation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Ventura, in coordination with Caltrans District 7, is advancing the California Street Northbound Off-Ramp Relocation Project to improve traffic flow and infrastructure safety along US-101 near Post Mile 30.1 in Ventura County. The project involves relocating the existing northbound off-ramp from California Street to Oak Street and replacing or extending the California Street overcrossing to eliminate structural deficiencies and enhance connectivity between downtown Ventura and the oceanfront. The initiative follows the “Build Alternative” option, designed to reduce congestion at the US-101/California Street and California Street/Thompson Boulevard intersections while improving bicycle and pedestrian access. Construction is projected to last approximately 18 months and will be subject to stringent environmental, noise, and air quality controls, including adherence to Caltrans Standard Specifications, VCAPCD Rule 55 for fugitive dust, and noise limits prohibiting construction operations above 86 dBA between 9:00 p.m. and 6:00 a.m. at 50 feet. All internal combustion equipment must be fitted with manufacturer-recommended mufflers, and erosion control measures, including sandbagged silt fences, must be implemented in compliance with the Stormwater Pollution Prevention Plan and Construction General Permit. The project must fully comply with the Americans with Disabilities Act, requiring 12-foot ADA-compliant sidewalks and accessible pathways. A comprehensive Traffic Management Plan must be executed during construction, incorporating public information updates, changeable message signs for motorists, incident management protocols, and detailed lane closure schedules to minimize community disruption. Environmental compliance is further ensured through adherence to established technical studies, including archaeological surveys, historic property assessments, and a Finding of No Adverse Effect, with mitigation and avoidance strategies documented in formal appendices. The project operates under Caltrans’ Title VI Non-Discrimination Policy, affirming equal opportunity standards. The solicitation, posted June 22, 2026, under NAICS code 237310, is categorized as a sources-sought action with a response deadline of August 10, 2026, and is managed by Susan Tse Koo, Senior Environmental Scientist at Caltrans District 7. All work will occur in Ventura, California, with no contract value specified in the available documentation.

General Info

Ventura and Caltrans to relocate US-101 northbound off-ramp and upgrade overpass for improved safety and traffic flow.

Agency

California → Caltrans, District 7 - Los Angeles

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

US-101/California Street at Post Mile (PM) 30.1, US-101/OakStreet, Oak Street/Thompson Boulevard, Ventura, CA, 93001

Set-Aside

NONE

Documents

(4)

Summary Form for California Street Northbound Off-Ramp Relocation Project

PDFenvironmental-summary

California Street Northbound Off-Ramp Relocation Project Initial Study and Proposed Negative Declaration

PDFenvironmental-assessment

California Street Northbound Off-Ramp Relocation Project NOA and IS/EA

PDFspecial-notice

NOC_06182026_OCR - Notice of Completion for California Street Northbound Off-Ramp Relocation Project

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 7 - Los Angeles
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 7 - Los Angeles
Office AddressN/A
Contacts
Susan Tse KooSenior Environmental Scientist

Full Description

Show more
The City of Ventura (City/Ventura) in coordination with the California Department of Transportation (Caltrans) District 7, proposes to relocate the existing United States Route 101 (US-101) northbound (NB) off-ramp at California Street to Oak Street, and to replace/extend the California Street Overcrossing in Ventura, Ventura County, California (project). The existing US-101/California Street off-ramp is located near the west end of the Ventura city limits at Post Mile (PM) 30.1, approximately 0.6 mile east of State Route 33 (SR-33) and 0.4 mile west of San Jon Road, near the Ventura County Fairgrounds.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Peninsula Avenue And Delaware Street Traffic Signal Modification Project
Solicitation # 46R031
The Peninsula Avenue and Delaware Street Traffic Signal Modification Project (Project No. 46R031) is a public works solicitation issued by the City of San Mateo, California. The project involves modifying the street lighting system to ensure full functionality and operational capacity, with a scope of work that includes mobilization, temporary traffic and pedestrian control, asphalt paving and base removal, and the installation of various concrete structures, pavement markings, and electrical components. The estimated construction cost is 533,325 dollars, and the project must be completed within 45 working days. Bids are due by 2:00 p.m. on October 15, 2026, and must be submitted as sealed bids to the City Clerk. The contract will be awarded to the lowest responsive and responsible bidder who possesses a Class A contractor's license and the necessary capacity to perform the work. Award criteria include the bidder's experience, the quality of previous work and materials, and the ability to meet the project timeline. Requirements for the winning contractor include providing a bid bond of at least 10 percent of the aggregate bid, as well as performance and payment bonds equal to the full contract price. Additionally, the contractor must comply with California Prevailing Wage Law, ADA accessibility standards, and provide a one-year warranty against latent faults or defective materials. All work must adhere to the 2018 Caltrans Standard Plans and the April 15, 2022, Caltrans Revised Standard Specifications.
CITY OF SAN MATEO, CALIFORNIA

POSTED

about 12 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 13 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS