Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Michigan was posted on January 1, 1970. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Call 3 026824.00

Closed
026824.00State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between $80,000,000 and $100,000,000, with a solicitation expected around March 15, 2027. Construction is scheduled to begin in September 2027 and last approximately two years, spanning two dredging seasons from September 1, 2027, to August 31, 2029. The work is divided into two primary sequences: the construction of a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, including an access channel, and the subsequent maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth. The total scope involves mechanically dredging approximately 5,500,000 cubic yards of material using closed clamshell buckets. Specifically, 3,200,000 cubic yards will be removed to create the CAD cell, with material placed at Port Edgewood Basin, Fox Point Reach CAD cells, Prudence Island, and the Rhode Island Sound Disposal Site. The remaining 2,300,000 cubic yards of maintenance material will be placed within the newly constructed Edgewood Shoals North CAD cell. To meet strict environmental windows and project timelines, the contractor must maintain a production rate of at least 300,000 cubic yards every 30 calendar days, operating 24 hours a day, 7 days a week. Interested firms must submit a capabilities package by November 26, 2026, demonstrating experience with these production rates and open water placement in New England during winter months.
W2SD Endist New England

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica Public Works Engineering Division. The project involves comprehensive upgrades and improvements to the San Vicente and Mt. Olivette reservoirs, with an estimated contract value of $27,344,000. Bidders are required to hold a Class A General Engineering license. The scope of work includes civil, structural, and electrical improvements, such as the installation of flexible expansion joints, meter and valve vaults, and concrete-lined swales, as well as cathodic corrosion protection and SCADA integration. The contract specifies a performance period of 730 calendar days, though the sample contract mentions substantial completion within 520 calendar days from the Notice to Proceed. Bids must be submitted electronically via the OpenGov portal by November 5, 2026, at 3:00 pm. Key requirements include the provision of Labor and Material Payment and Performance Bonds for 100% of the contract sum, compliance with prevailing wages, and adherence to the Santa Monica Living Wage Ordinance. Liquidated damages for delays are set at $13,200 per day. The project is subject to rigorous inspection standards, including ASTM and CBC requirements, with the Prime Contractor responsible for contracting and billing Enterprise Automation for specific integration services.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 15 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

Solicitation 026824.00 is a project issued by the Maine Department of Transportation for the construction of a new breakwater, boat launch, and parking lot in Lubec, Maine. The project involves extensive marine and civil engineering work, including the installation of a rubble-mound breakwater, steel piling, asphalt paving, and various utility and electrical components. Technical foundations for the project are supported by comprehensive geotechnical investigations, current and wave collection data, and 2D physical model studies to ensure the stability of the armor layer and toe design. The procurement process includes detailed bidding instructions and a specific schedule of items covering excavation, concrete work, and erosion control. Multiple amendments have been issued to refine the bid book, updating the environmental package and providing clarifications on rock settlement quantities, light standard installation, and material specifications for guardrails and fencing. Bids for this solicitation are due by May 6, 2026.

General Info

Maine DOT project for Lubec breakwater, boat launch, and parking lot by May 2026.

Documents

17

Appendix E: Model Implementation

PDF, High priority: read this first2 pages · specifications
High

Lubec Breakwater Drawing Set Index

PDF, High priority: read this firstsow
High

Lubec Breakwater Subsurface Geotechnical Investigation Report

PDF, High priority: read this firstsow
High

Lubec Breakwater USA Rock Grading Mix Schedule

PDF, High priority: read this first5 pages · specifications
High

Maine DOT Bidding Instructions and Forms

PDF, High priority: read this firstspecifications
High

Maine DOT Proposal 026824.00 - Schedule of Items

PDF, High priority: read this first8 pages · rfb
High

MDOT Breakwater Project Amendment No. 4

PDF, High priority: read this firstamendment
High

WIN:026824.00 Amendment No. 2 - Lubec Breakwater, Boat Launch & Parking Lot

PDF, High priority: read this first2 pages · amendment
High

WIN:026824.00 Amendment No. 4 - Lubec Breakwater, Boat Launch & Parking Lot

PDF, High priority: read this first2 pages · amendment
High

WIN:026824.00 - Breakwater, Boat Launch & Parking Lot Amendment No. 1

PDF, High priority: read this first12 pages · amendment
High

Appendix B - Test Images

PDF, Low priority6 pages · other
Low

dt026824.00 - Series A Camera Analysis Data

PDF, Low priority10 pages · specifications
Low

Lubec 2D Physical Model Studies – Project Report Rev. 1.0

PDF, Low priority30 pages · other
Low

Lubec Breakwater Current and Wave Collection Data Report

PDF, Low priority38 pages · other
Low

nc026824.00.pdf

PDF, Low priority1 page · other
Low

SEC. 1-10-2 State Title 36 study area map

PDF, Low priority1 page · other
Low

wr026824.00 - Wave Calibration and Test Results

PDF, Low priority3 pages · specifications
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMichigan → Maine Department of Transportation
ContactsNo contacts available
OfficeMI, USA
Office AddressMI, USA
ContactsNo contact information available

Full Description

Show more
Suite includes both Bid Tab Analysis and Competitor Insights.Search historical pricing for items and locations to crunch comparisons with other bidders for a competitive advantage.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS