This Solicitation opportunity from California was posted on October 9, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Calle Frontera Lift Station Soil Stabilization Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Calle Frontera Lift Station Soil Stabilization Project involves comprehensive maintenance and construction activities aimed at ensuring optimal operation of the lift station. The scope includes maintaining existing lift station functions, clearing and grubbing the perimeter for construction access, and demolishing and disposing of PCC and AC pavements within the station's perimeter walls. The project also entails protecting existing utilities and improvements that are to remain, removing and salvaging the antenna pole, and performing excavations for the installation of new concrete cast-in-drilled-hole pile foundations. Additionally, new concrete pile caps will be constructed, and the salvaged antenna pole will be reinstalled on a new concrete pedestal. The work further involves constructing closure pours between new and existing foundations, repairing perimeter wall expansion joints, and modifying aboveground plumbing to recenter vertical discharge pipes within existing sleeves. The project includes constructing new V-gutter, PCC flatwork, and AC paving, along with the removal, salvage, and reinstallation of pipe supports. Landscaping, planting, and irrigation maintenance and repairs are also part of the scope, ensuring the site is properly restored and stabilized. The project is overseen by the City of San Clemente in California, with a contract value estimated between $500,000 and $1,500,000. It was posted on October 9, 2025, with a response deadline of November 12, 2025. The NAICS code associated with this project is 238910, indicating specialty trade contractors in site preparation. The primary point of contact is Rachel Perez, who can be reached via email at [email hidden] or by phone at [phone hidden]. The project aims to enhance the stability and functionality of the lift station through a combination of demolition, foundation work, utility modifications, paving, and landscaping efforts.
General Info
Place of Performance
CA, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from California → City of San Clemente
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
