Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on February 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Canadian Air and Precipitation Monitoring Network – Bonner Lake

Closed
5000090636International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541620
New
International
Fuel Management Prescription Development – Invermere Wildfire Risk Reduction Project Areas
Solicitation # DOI-2026-WRR-RFP-01
The District of Invermere is soliciting proposals for the development of three fuel management prescriptions across approximately 51 hectares of Wildfire Risk Reduction project areas, specifically Pine Ridge (13 hectares), Johnston Road and East DL 4616 (21 hectares), and Industrial Park Hillside (17 hectares). The scope of work includes field and office assessments, data collection, mapping, and the creation of implementation-ready prescriptions. All deliverables must meet provincial standards and the funding requirements of the Community Resiliency Investment – Columbia Basin Wildfire Resiliency Initiative, with final prescriptions requiring the signature of a Registered Professional Forester in good standing with Forest Professionals BC. The contract award is anticipated for January 26, 2027, with proposals due by January 5, 2027. Selection is based on a combination of mandatory criteria, weighted factors, and price. Successful proponents must maintain a District of Invermere business license and provide comprehensive insurance, including at least 2 million dollars in general liability and professional liability coverage, and 3 million dollars in non-owned automobile insurance. Payment is structured around four milestones: 30 percent upon completion of field data collection, 30 percent for draft prescriptions and spatial data, 20 percent following agency review and revisions, and a final 20 percent holdback upon acceptance of all deliverables, which includes a mandatory snow-free verification of site conditions.
District of Invermere

POSTED

about 4 hours ago

DEADLINE

in about 2 months
NAICS: 541620
New
SLED
Sustainable Forestry Initiative Forest Management Standard
Solicitation # ITB FFS 26 27 71
The Florida Department of Agriculture and Consumer Services is seeking competitive bids for audit services to maintain the Florida Forest Service certification under the Sustainable Forestry Initiative (SFI) 2022 Forest Management Standard. The scope of work involves conducting one certification audit and four surveillance audits from 2027 through 2031 for 505,348 acres across the Blackwater River, Four Creeks, Jennings, John M. Bethea, and Tate’s Hell state forests. These audits must be performed by certification bodies accredited by the ANSI National Accreditation Board (ANAB) and adhere to SFI 2022 Standards and Rules as well as ISO/IEC 17021-1 and ISO/IEC TS 17021-2. The initial term of the contract is five years, with a possible renewal for an additional five years, not to exceed a total of ten years. The contract will be awarded to the responsive and responsible vendor offering the lowest Initial Term Total Price. Bidders must submit sealed responses by December 3, 2026, including a signed acknowledgement form and price sheet. Required certifications include E-Verify registration, lobbying and debarment disclosures, and proof of general liability, automobile, and worker's compensation insurance. Final reports and invoices are due by May 15th of each year, and payments are subject to annual legislative appropriation and a 1.0% transaction fee. Preference in the event of tie-breaking may be given to certified business enterprises, veteran-owned businesses, or Florida-based producers.
Department of Agriculture and Consumer Services

POSTED

about 10 hours ago

DEADLINE

in 23 days

General Info

Place of Performance

*Ontario (except NCR), CAN

Set-Aside

NONE

Documents

2
PDF, High priority: read this firstrfb
High
PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline time changed from 8:00 PM UTC to 3:00 PM UTC on Feb 27, 2026. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Department of the Environment (ECCC )
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Nathalie ShannonPoint of Contact

Full Description

Show more
The Contractor hereby agrees to: 1. Objective Environment and Climate Change Canada (ECCC) requires a Contractor for daily technical support (7 days per week, 52 weeks per year) at the Canadian Air and Precipitation Monitoring Program (CAPMoN) Bonner Lake site located approximately 8 km northeast of Moonbeam, Ontario with coordinates N 49.385528° latitude, W 82.121250° longitude. 2. Background ECCC operates an environmental research and monitoring station in the area which forms part of ECCC’s national network of CAPMoN stations. The primary focus of this monitoring station is the daily collection of precipitation and/or air samples. Environmental data is collected from both automatic and manual samplers. A contract operator is required to attend to the station to retrieve and process the samples according to the CAPMoN Standard Operating Procedures (SOP's). The samples are then packaged and shipped for analysis to the CAPMoN National Laboratory located in Toronto, Ontario. Other daily duties include reading and recording of various gauges, diagnostics, and regular servicing, troubleshooting, and minor repair of a variety of monitoring equipment. On-site training will be provided by ECCC technical staff. 3. Details of Work to be Performed All sampling, shipping, and maintenance must be performed in accordance with the Site Operations Reference Manuals; and in accordance with any amendments to the aforementioned manuals. The routine may involve additional collectors, passive samplers and various climatological and meteorological instruments. ECCC will provide the Contractor the aforementioned manuals and amendments. 4. Tasks and Deliverables: Firm Requirement: 1. The Contractor will be responsible for servicing: a. Air Filter Sampling System See Appendix 1 to Annex A b. Ozone Sampling System: See Appendix 2 to Annex A c. Precipitation Collector: See Appendix 3 to Annex A d. PM Measurements: See Appendix 4 to Annex a 5. General Conditions: 1. The Contractor must have knowledge of local weather conditions. 2. The Contractor will be supplied with a phone number and name for emergencies. Only the Technical Authority can make any changes to the sampling program. All changes will be made known to the Contractor, either orally or in writing, or both. 3. The Contractor must have at least two resources (to a maximum of four resources), a Primary resource and a Back-up resource. The back-up resource(s) must service the measurement site at least once per month. 4. The Primary resource and Back-up resource(s) must be proficient in English, both written and oral. 5. All resources (including the designated backup(s)) must make themselves available for two inspections each year as well as for certifications as required. The inspections will be during normal sample collection periods and should take less than 2 hours each. 6. Smoking is not permitted within 500 meters of the compound. Vehicles must not approach closer than the designated parking area. The Contractor must not enter the building with contaminated clothing or footwear. 7. The Contractor must not bring toxic or contaminating compounds such as oil based products, road salt, soaps, disinfectants, or insect repellents to the CAPMoN station. No paints, solvents or glues must be used onsite or in the vicinity of the compound. 8. The Contractor must clean and wash the interior of the building when required using only distilled or de-ionized water as supplied by ECCC and dust must be swept or vacuumed. 9. The Contractor must contribute to the security of the site by adhering to the use of locks where applied. Any suspicious activity or tampering of the site equipment must be reported to the Technical Authority, as should any event or activity that may compromise the sampling integrity. 10. No animals or pets are to be inside the building. 11. The Contractor must have access to reliable transportation to and from the Site. 12. The Contractor must ensure the issue of working alone at an isolated location is addressed by using a buddy type system. 13. The primary resource and back-up resource(s) must review and sign off on all site safe work procedures (SWP) and task hazard analysis (THA) every year. Failure to comply with safety practices could result in the discontinuation of the contract. 14. All Contractors must hold a valid Reliability Security Clearance.

More opportunities from Government of Canada → Department of the Environment (ECCC )

Same awarding agency

NAICS: 541430
New
International
Develop Wayfinding Strategy for Mississippi Lake National Wildlife Area (MLNWA), St Clair National Wildlife Area (SCNWA) and Big Creek National Wildlife Area (BCNWA)
Solicitation # 5000095728
Environment and Climate Change Canada is seeking a contractor to develop wayfinding strategies and complete signage designs for the Mississippi Lake, St Clair, and Big Creek National Wildlife Areas in Ontario. The objective is to improve accessibility and enhance visitor experiences by applying guidance and design standards previously established for the Prince Edward Point National Wildlife Area. Key deliverables include the creation of sign location map booklets, the development of deficiency memos based on site visits, and the provision of fabrication and installation contract administration support, such as reviewing shop drawings and material samples. The contract will be awarded to the compliant offer with the lowest evaluated price, provided they meet all mandatory technical criteria. The initial performance period runs from the date of award to March 31, 2027, with two subsequent option periods extending through the 2028-29 fiscal year. All work must adhere to the Design Brief and Wayfinding Design Intent specifications, and the contractor is responsible for ensuring industry-standard quality assurance and performing final inspections before submitting work to Canada for acceptance. Proposals must be submitted electronically by November 25, 2026.
Graphic Design Services

POSTED

5 days ago

DEADLINE

in 15 days
View Details
NAICS: 337214
New
International
Office Furniture
Solicitation # 5000096974
Environment and Climate Change Canada is soliciting bids for the purchase, delivery, and installation of office furniture in Gatineau, Quebec, with a completion deadline of December 31, 2026. This procurement is issued under the PWGSC Supply Arrangement and is specifically set aside for Indigenous businesses through the Procurement Strategy for Indigenous Business (PSIB). The scope of work includes the provision of 79 electric height-adjustable work surfaces and 98 filing and storage products. Delivery is required on a DDP basis, with the contractor responsible for unloading and moving goods into the specified locations. The standard lead time for delivery and installation is estimated between 6 and 10 weeks. The contract is governed by General Conditions 2010A for medium complexity goods, featuring a 10-year warranty on most components and a 5-year warranty on user-adjustable parts. The contractor must bear all transportation costs for repairs or replacements and certify that no forced labour was used in production. Award selection is based on the lowest evaluated price among responsive bids, following a technical and financial evaluation. Bidders must submit their proposals in three separate PDF sections: a technical offer, a financial offer, and certifications. Payment may be processed via credit card or multiple payment methods, and the contractor must adhere to all site safety and health standards during installation.
Office Furniture (except Wood) Manufacturing

POSTED

6 days ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS