This Solicitation opportunity from Government of Canada was posted on February 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Canadian Air and Precipitation Monitoring Network – Bonner Lake

Closed
5000090636International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541620
New
SLED
The NHDES Coastal Program is the recipient of a National Fish and Wildlife Foundation National Coastal Resilience Fund FY2025 grant entitled “Coastal Watershed Resilience Plan” (CWRP). The CWRP seeks to mitigate coastal and freshwater flood risk t...
Solicitation # RFP 2026-22
The New Hampshire Department of Environmental Services is soliciting proposals for the New Hampshire Coastal Watershed Flood Hazard Assessment and Resilience Plan Project. Funded by a National Fish and Wildlife Foundation grant, this initiative aims to mitigate coastal and freshwater flood risks to critical infrastructure, transportation, natural resources, and community assets within the state's coastal watershed. The project is divided into two primary phases: a Flood Hazards Assessment to identify Resilience Opportunity Areas based on asset inventories and flood exposure data, and the subsequent development of a Phase II Engagement Plan and specific action plans. The selected consultant will join a Core Project Team including the NHDES Coastal Program, DNCR, PDA, and various regional planning commissions. The contract is expected to begin in January 2027 and must be completed by June 30, 2029. The total estimated value is 393,500 dollars, consisting of a 377,000 dollar cap for project labor and expenses and 16,500 dollars in GBS engagement funds. Award selection is based on a weighted evaluation of the proposed scope of work, relevant experience, previous related work, and the realism of the project schedule and budget, rather than the lowest cost. All deliverables must adhere to ADA Title II and Section 508 accessibility standards, and the contract is governed by the Standard Terms and Conditions of the State of New Hampshire and OMB Uniform Guidance. Proposals must be submitted in PDF format by August 31, 2026.
Department Of Environmental Services

POSTED

about 15 hours ago

DEADLINE

in 18 days
NAICS: 541620
New
SLED
Housing Plan Program EIR
Solicitation # 2022040209
The City of Santa Barbara is advancing its 6th Cycle Housing Element through a comprehensive programmatic environmental review process under CEQA, aimed at facilitating the approval of up to 8,010 new housing units by 2035. This initiative includes a suite of regulatory and policy reforms such as the adoption of an Adaptive Reuse Ordinance, amendments to the Average Unit-Size Density Incentive Program, updates to the Accessory Dwelling Unit ordinance, and the establishment of Objective Design and Development Standards to align with state housing laws. The plan also involves revising the General Plan, Municipal Code, and Local Coastal Program to ensure consistency with state mandates and climate goals, while implementing procedural improvements to streamline permitting processes. The environmental analysis, conducted as a Program Environmental Impact Report, evaluates cumulative impacts across resource areas including air quality, greenhouse gas emissions, noise, hazardous materials, and biological resources, using CEQA Guidelines and the City’s Climate Action Plan as foundational standards. The analysis employs qualitative greenhouse gas assessments due to the programmatic nature of the initiative and does not authorize specific developments but establishes the regulatory framework within which they may proceed. The effort is led by the City of Santa Barbara, with environmental oversight and compliance responsibilities vested in government agencies, including the California Coastal Commission, State Lands Commission, and California Department of Fish and Wildlife. Key points of contact include Julia Pujo, Environmental Analyst, and Chris Bersbach, Director of Environmental Planning for Rincon Consultants. The initiative’s timeline is bounded by a public review period from January 30, 2026, to March 17, 2026, with prior comment deadlines established for the Draft EIR in 2022. While the document references accounting codes and transportation regulations for hazardous materials, no formal contract pricing, payment instructions, invoicing methods, or procurement evaluation criteria are present, indicating this is a planning and environmental compliance action rather than a contracted procurement. Attachments include supporting documents such as the Community Wildfire Protection Plan and Storm Water BMP Guidance Manual, and submissions are accepted electronically or in hard copy, with PDF being the implied standard format. No representations, certifications, or clauses typical of federal contracting are included, as the focus remains squarely on regulatory alignment, environmental analysis, and policy implementation under state housing and environmental law.
City of Santa Barbara

POSTED

about 22 hours ago

DEADLINE

N/A

General Info

Agency

Government of Canada → Department of the Environment (ECCC )View Agency

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

*Ontario (except NCR), CAN

Set-Aside

NONE

Documents

(2)

5000090636_Solicitation_EN.pdf

PDF

5000090636_Solicitation_FR.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Department of the Environment (ECCC )
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Department of the Environment (ECCC )
View Agency Profile
Office AddressN/A
Contacts
Nathalie ShannonPoint of Contact

Full Description

Show more
The Contractor hereby agrees to: 1. Objective Environment and Climate Change Canada (ECCC) requires a Contractor for daily technical support (7 days per week, 52 weeks per year) at the Canadian Air and Precipitation Monitoring Program (CAPMoN) Bonner Lake site located approximately 8 km northeast of Moonbeam, Ontario with coordinates N 49.385528° latitude, W 82.121250° longitude. 2. Background ECCC operates an environmental research and monitoring station in the area which forms part of ECCC’s national network of CAPMoN stations. The primary focus of this monitoring station is the daily collection of precipitation and/or air samples. Environmental data is collected from both automatic and manual samplers. A contract operator is required to attend to the station to retrieve and process the samples according to the CAPMoN Standard Operating Procedures (SOP's). The samples are then packaged and shipped for analysis to the CAPMoN National Laboratory located in Toronto, Ontario. Other daily duties include reading and recording of various gauges, diagnostics, and regular servicing, troubleshooting, and minor repair of a variety of monitoring equipment. On-site training will be provided by ECCC technical staff. 3. Details of Work to be Performed All sampling, shipping, and maintenance must be performed in accordance with the Site Operations Reference Manuals; and in accordance with any amendments to the aforementioned manuals. The routine may involve additional collectors, passive samplers and various climatological and meteorological instruments. ECCC will provide the Contractor the aforementioned manuals and amendments. 4. Tasks and Deliverables: Firm Requirement: 1. The Contractor will be responsible for servicing: a. Air Filter Sampling System See Appendix 1 to Annex A b. Ozone Sampling System: See Appendix 2 to Annex A c. Precipitation Collector: See Appendix 3 to Annex A d. PM Measurements: See Appendix 4 to Annex a 5. General Conditions: 1. The Contractor must have knowledge of local weather conditions. 2. The Contractor will be supplied with a phone number and name for emergencies. Only the Technical Authority can make any changes to the sampling program. All changes will be made known to the Contractor, either orally or in writing, or both. 3. The Contractor must have at least two resources (to a maximum of four resources), a Primary resource and a Back-up resource. The back-up resource(s) must service the measurement site at least once per month. 4. The Primary resource and Back-up resource(s) must be proficient in English, both written and oral. 5. All resources (including the designated backup(s)) must make themselves available for two inspections each year as well as for certifications as required. The inspections will be during normal sample collection periods and should take less than 2 hours each. 6. Smoking is not permitted within 500 meters of the compound. Vehicles must not approach closer than the designated parking area. The Contractor must not enter the building with contaminated clothing or footwear. 7. The Contractor must not bring toxic or contaminating compounds such as oil based products, road salt, soaps, disinfectants, or insect repellents to the CAPMoN station. No paints, solvents or glues must be used onsite or in the vicinity of the compound. 8. The Contractor must clean and wash the interior of the building when required using only distilled or de-ionized water as supplied by ECCC and dust must be swept or vacuumed. 9. The Contractor must contribute to the security of the site by adhering to the use of locks where applied. Any suspicious activity or tampering of the site equipment must be reported to the Technical Authority, as should any event or activity that may compromise the sampling integrity. 10. No animals or pets are to be inside the building. 11. The Contractor must have access to reliable transportation to and from the Site. 12. The Contractor must ensure the issue of working alone at an isolated location is addressed by using a buddy type system. 13. The primary resource and back-up resource(s) must review and sign off on all site safe work procedures (SWP) and task hazard analysis (THA) every year. Failure to comply with safety practices could result in the discontinuation of the contract. 14. All Contractors must hold a valid Reliability Security Clearance.

More opportunities from Government of Canada → Department of the Environment (ECCC )

Same awarding agency

NAICS: 541620
International
Technical Assessment and Cost-Benefit Analysis on Fuel Storage Tank Systems Life Cycle (Installation, Maintenance and Removal)
Solicitation # 5000089014
Environment and Climate Change Canada is seeking proposals for a Technical Assessment and Cost-Benefit Analysis on the life cycle of fuel storage tank systems, covering installation, maintenance, and decommissioning, with a contract period running from October 1, 2026, to December 31, 2027. The work requires a comprehensive evaluation of current industry practices in Canada, including compliance with the National Fire Code of Canada, CSA B139, the CCME Code of Practice, and other applicable authorities, to identify environmental impacts, resource needs, benefits, challenges, and operational and policy risks such as regulatory misalignment or unintended socioeconomic consequences. The analysis must consider the perspectives of both the regulated community and key industry stakeholders like certified installers, professional engineers, project managers, consultants, and manufacturers. Contractors must deploy a project team consisting of at least a Licensed Professional Engineer, a Petroleum Storage Tank System Technician, a Petroleum Storage Tank Systems Compliance Specialist, and a Project Manager, with the stipulation that the Professional Engineer cannot also serve as the Technician; other roles may be combined. Proposals must be submitted electronically by September 11, 2026, to a designated email address, with a maximum total file size of 25 MB, and must be organized into three distinct sections: Technical Offer, Financial Offer, and Offer Submission and Declaration Forms. The contract is firm-fixed-price with a maximum value of $150,000, and offers exceeding this amount will be non-responsive. Evaluation will be based on mandatory compliance criteria and weighted technical factors, including relevant project experience (20 points) and qualifications of key personnel (15 points), with a trade-off approach favoring value over lowest price. All work must be performed remotely from the contractor’s site, primarily supporting operations in Canada’s National Capital Region, using ECCC-provided IT systems, and all personnel accessing PROTECTED A information must hold valid RELIABILITY STATUS security clearances. Subcontractors require prior written approval from ECCC Security, and the Government retains exclusive ownership of all intellectual property generated under the contract. Contractors must adhere to accessibility and green procurement standards, deliver all outputs electronically in accessible formats, and are prohibited from using paper submissions. The Contracting Authority is Garvin Suepaul, and no Contracting Officer’s Representative or Certificate of Technical Responsibility has been assigned at this time. Violations of ethics, conflicts of interest, or security protocols—including unauthorized use of contractor systems for protected data—may result in contract termination,
Environmental Consulting Services

POSTED

9 days ago

DEADLINE

in 29 days
View Details
NAICS: 541990
International
Operation & Maintenance (O&M) Manual DevelopmentThe contract titled Operation & Maintenance (O&M) Manual Development requires the preparation of complete and detailed operation and maintenance manuals for all installed systems, organized systematically by each individual component. These manuals must be delivered in both electronic and hardcopy formats to ensure accessibility and usability across multiple platforms and user preferences. The work scope centers on compiling accurate, clear, and comprehensive documentation that supports the long-term operation, troubleshooting, and servicing of the systems, with an emphasis on clarity and technical precision. The project is being managed under a subcontract arrangement by the Government of Canada through the Department of the Environment (ECCC), with the place of performance located in Ottawa. The solicitation was posted on July 28, 2026, with a firm response deadline of August 21, 2026, at 19:00 Eastern Time. The North American Industry Classification System (NAICS) code 541990 applies, indicating this work falls under Other Professional, Scientific, and Technical Services. There is no set-aside designation or specific organization type specified, and the contract does not include detailed point of contact information. Interested parties must submit proposals through the official Canada Buys portal at the provided URL, ensuring compliance with all technical, formatting, and submission requirements outlined in the tender notice.
All Other Professional, Scientific, and Technical Services

POSTED

17 days ago

DEADLINE

in 8 days