Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Cast-in-Place Concrete

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity is for the provision of cast-in-place concrete services for prime contractors working on City of Livermore facility projects in Livermore, California. The scope of work includes furnishing, placing, and finishing concrete, as well as installing miscellaneous metal items and grouting steel base plates. The selected contractor is responsible for delivering finished concrete structures and providing the necessary facilities for the job curing of test cylinders. All work must be performed in strict compliance with the 2019 CBC, ACI 117, and ACI 211.1 standards. Interested parties must submit their responses by the deadline of November 24, 2026. This project falls under NAICS code 238110 and is specifically designated for facility improvements within the city.

General Info

Place of Performance

Livermore, CA, 94550, USA

Set-Aside

NONE

Documents

This scope was carved out of DR583018.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Livermore Village Infrastructure Project, Lightwell Stair Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Livermore
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Furnishes, places, and finishes cast-in-place concrete for prime contractors on City of Livermore facility projects. Performs concrete placement, installs miscellaneous metal items, and grouts steel base plates. Provides facilities for job curing of test cylinders. Must comply with 2019 CBC, ACI 117, and ACI 211.1. Delivers finished concrete structures.

Similar Contracts

Same NAICS industry code

More opportunities from California → City of Livermore

Same awarding agency

NAICS: 238910
New
SLED
Livermore Village Infrastructure Project, Lightwell Stair Replacement
Solicitation # DR583018
The City of Livermore is soliciting bids for the L Street Parking Garage Lightwell Stair Replacement project, identified as solicitation DR583018. The scope of work involves the demolition of existing concrete lightwell stairs and the installation of a new steel stair assembly featuring precast concrete treads, handrails, and associated structural framing. The project requires the contractor to provide all necessary concrete formwork, reinforcing steel, and metal fabrication, ensuring that the final assembly complies with the 2010 ADA Standards for Accessible Design and governing building codes. Because the parking garage will remain fully operational during construction, the contractor must implement careful scheduling and temporary traffic control systems. The contract is awarded based on a low-bid selection process, requiring a signed and sealed bid proposal accompanied by a bid schedule and a bid security deposit equal to ten percent of the maximum bid amount. Technical requirements include shop drawings and calculations signed by a California-registered Civil Engineer, with structural designs adhering to AISC, AWS D1.1, and ASCE 7 seismic standards. The contractor is responsible for all temporary utilities, site access, and environmental controls. Performance is monitored by the City and its Engineer, with progress payments processed within 30 days of certification. Required security for the awarded contract includes payment, performance, and warranty bonds.
Site Preparation Contractors

POSTED

about 5 hours ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS