Reinforcing Steel (Rebar)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity is for the furnishing and installation of reinforcing steel for prime contractors working on City of Livermore facility projects in Livermore, California. The scope of work includes the installation of reinforcing bars, dowels, chairs, spacers, and bolsters, as well as cleaning reinforcement and applying impervious tape to prevent rust staining. All welding activities must be completed by qualified mechanics in accordance with AWS D1.4 standards to ensure the delivery of a compliant installed reinforcing steel grid. The solicitation was posted on November 4, 2026, with a response deadline of November 24, 2026. Classified under NAICS code 238110, this project is specifically designated for facility improvements within the City of Livermore. Interested parties should refer to the provided procurement link for further submission details.

General Info

Place of Performance

Livermore, CA, 94550, USA

Set-Aside

NONE

Documents

This scope was carved out of DR583018.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Livermore Village Infrastructure Project, Lightwell Stair Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Livermore
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Furnishes and installs reinforcing steel for prime contractors on City of Livermore facility projects. Installs reinforcing bars, dowels, chairs, spacers, and bolsters; cleans reinforcement and applies impervious tape to prevent rust staining. Welding must be performed by qualified mechanics per AWS D1.4. Delivers installed reinforcing steel grid.

Similar Contracts

Same NAICS industry code

More opportunities from California → City of Livermore

Same awarding agency

NAICS: 238910
New
SLED
Livermore Village Infrastructure Project, Lightwell Stair Replacement
Solicitation # DR583018
The City of Livermore is soliciting bids for the L Street Parking Garage Lightwell Stair Replacement project, identified as solicitation DR583018. The scope of work involves the demolition of existing concrete lightwell stairs and the installation of a new steel stair assembly featuring precast concrete treads, handrails, and associated structural framing. The project requires the contractor to provide all necessary concrete formwork, reinforcing steel, and metal fabrication, ensuring that the final assembly complies with the 2010 ADA Standards for Accessible Design and governing building codes. Because the parking garage will remain fully operational during construction, the contractor must implement careful scheduling and temporary traffic control systems. The contract is awarded based on a low-bid selection process, requiring a signed and sealed bid proposal accompanied by a bid schedule and a bid security deposit equal to ten percent of the maximum bid amount. Technical requirements include shop drawings and calculations signed by a California-registered Civil Engineer, with structural designs adhering to AISC, AWS D1.1, and ASCE 7 seismic standards. The contractor is responsible for all temporary utilities, site access, and environmental controls. Performance is monitored by the City and its Engineer, with progress payments processed within 30 days of certification. Required security for the awarded contract includes payment, performance, and warranty bonds.
Site Preparation Contractors

POSTED

about 5 hours ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS