Concrete Formwork

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the City of Livermore involves the design, furnishing, and installation of concrete forms for various facility projects. The selected contractor is responsible for constructing forms capable of supporting fluid concrete and superimposed loads, installing necessary alignment bracing, and managing the removal and delivery of all formwork. All work must strictly adhere to ACI 347 and ACI 318 Section 26.11 standards, with specific requirements that exposed concrete meet ACI 303R tolerances. Interested parties must submit their responses by November 24, 2026, for performance within Livermore, California.

General Info

Place of Performance

Livermore, CA, 94550, USA

Set-Aside

NONE

Documents

This scope was carved out of DR583018.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Livermore Village Infrastructure Project, Lightwell Stair Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Livermore
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Designs, furnishes, and installs concrete forms for prime contractors on City of Livermore facility projects. Constructs forms to support fluid concrete and superimposed loads, installs alignment bracing, and removes shores. Work must conform to ACI 347 and ACI 318 Section 26.11, with exposed concrete meeting ACI 303R tolerances. Delivers installed and removed formwork.

Similar Contracts

Same NAICS industry code

More opportunities from California → City of Livermore

Same awarding agency

NAICS: 238910
New
SLED
Livermore Village Infrastructure Project, Lightwell Stair Replacement
Solicitation # DR583018
The City of Livermore is soliciting bids for the L Street Parking Garage Lightwell Stair Replacement project, identified as solicitation DR583018. The scope of work involves the demolition of existing concrete lightwell stairs and the installation of a new steel stair assembly featuring precast concrete treads, handrails, and associated structural framing. The project requires the contractor to provide all necessary concrete formwork, reinforcing steel, and metal fabrication, ensuring that the final assembly complies with the 2010 ADA Standards for Accessible Design and governing building codes. Because the parking garage will remain fully operational during construction, the contractor must implement careful scheduling and temporary traffic control systems. The contract is awarded based on a low-bid selection process, requiring a signed and sealed bid proposal accompanied by a bid schedule and a bid security deposit equal to ten percent of the maximum bid amount. Technical requirements include shop drawings and calculations signed by a California-registered Civil Engineer, with structural designs adhering to AISC, AWS D1.1, and ASCE 7 seismic standards. The contractor is responsible for all temporary utilities, site access, and environmental controls. Performance is monitored by the City and its Engineer, with progress payments processed within 30 days of certification. Required security for the awarded contract includes payment, performance, and warranty bonds.
Site Preparation Contractors

POSTED

about 5 hours ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS