Categorical Exemption for the Geotechnical Investigation for the City of Palo Alto Project for Grade Separation: Churchill Avenue, Meadow Drive, and Charlest

Forecast
E25-0106State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Peninsula Corridor Joint Powers Board, in coordination with the City of Palo Alto, is initiating a targeted geotechnical investigation to support the Palo Alto Grade Separation Project. This project involves conducting three rotary wash borings and approximately thirteen cone penetration tests to depths of 50 to 60 feet at the Churchill Avenue, Meadow Drive, and Charleston Road crossings. The primary objective is to collect subsurface data necessary for 15 percent design-level evaluations, independent cost estimates, and 35 percent design refinements, while also supporting early hazard identification required by the Rail Crossing Elimination Grant. The estimated value for this work is approximately $117,740, with an expected start date in July 2025. All field activities will be confined to City-owned public rights-of-way and will not occur within the Caltrain rail corridor or near sensitive environmental or cultural resource areas. The scope includes vacuum excavation for utility locating, followed by temporary borings that must be backfilled and resurfaced according to City and Valley Water standards. Contractors must hold a valid C-57 or C-61/D-09 license and maintain primary insurance with minimum limits of $1,000,000 for personal injury and property damage. Strict regulatory compliance is required, including adherence to Cal/OSHA safety rules, coordination with Valley Water's Well Ordinance Program, and the immediate cessation of work should any archaeological resources be discovered. All applications and traffic control plans must be submitted electronically through the Palo Alto Online Permitting System.

General Info

Geotechnical investigation for Palo Alto Grade Separation Project, valued at $117,740, starting July 2025.

Place of Performance

Churchill Avenue. Meadow Drive, and Charleston Road crossings of the Caltrain Corridor, includin, Palo Alto, CA, 94305

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Peninsula Corridor Joint Powers Board
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Michael TauchenDeputy Director

Full Description

Show more
Caltrain, in coordination with the City, is proposing to conduct a series of geotechnical borings and cone penetration tests at and near Churchill Avenue, Meadow Drive, and Charleston Road crossings. This investigation will collect subsurface data necessary to inform 15 percent design-level evaluations and independent cost estimates for the grade separation alternatives outlined above. The data will also support 35 percent design refinements and early hazard identification as part of the Rail Crossing Elimination Grant requirements. The proposed field work includes rotary wash borings to depths of approximately 50-60 feet and cone penetration to depths of approximately 60 feet. All boring locations are confined to City-owned public ROW and are outside the Caltrain rail corridor. The borings will be temporary, and all boreholes will be backfilled and resurfaced per applicable regulations and City standards. The proposed geotechnical work is summarized as follows: • Three (3) rotary wash borings to depths of approximately 50-60 feet; o Churchill Avenue, Meadow Drive, and Charleston Road • Thirteen (13) cone penetration tests to depths of approximately 60 feet; o Alma Street, Mariposa Avenue, Charleston Road, Park Boulevard, and Coleridge Avenue • Use of vacuum excavation to locate existing utilities prior to boring; and • Backfilling and full surface restoration per City standards. All boring and cone penetration tests will occur in paved roadways or shoulders. No work will occur on or next to sensitive environmental or cultural resource areas. No tree trimming or removal will occur.

Similar Contracts

Same NAICS industry code

More opportunities from California → Peninsula Corridor Joint Powers Board

Same awarding agency

NAICS: 237310
SLED
Guadalupe River Bridge Replacement ProjectThe Guadalupe River Bridge Replacement Project, managed by the Peninsula Corridor Joint Powers Board, involves the reconstruction and extension of two rail bridges over the Guadalupe River in San Jose, California, to address critical safety issues. The scope of work includes widening the Guadalupe River channel, establishing a new long-term site access on Willow Street, and performing site preparation activities such as grading, erosion control, and the installation of access mats and temporary gravel for pipe support. The project has undergone multiple environmental evaluations, including three addendums to the Mitigated Negative Declaration to address updated habitat management plans, changes in project sequencing, and revised construction activities. To offset the jurisdictional impacts of the bridge work, the project incorporates the Hicks Creek Mitigation Project located within the Midpeninsula Regional Open Space District Sierra Azul Open Space Preserve. This restoration effort involves removing invasive plants, concrete structures, and old bridges to restore a natural creek bed and revegetating the area with native species. The project adheres to CEQA guidelines and requires compliance with certifications from the San Francisco Bay Regional Water Quality Control Board, the U.S. EPA, and the California Department of Fish and Wildlife. A Notice of Determination was filed on September 9, 2026, following project approval on August 6, 2026.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS