Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Caughlin Road Guardrail_H14888

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Bernardino County Department of Public Works is undertaking a guardrail improvement project on Caughlin Road near Phelan, California, as part of routine infrastructure maintenance to enhance roadside safety in accordance with Caltrans standards. The scope includes the installation of a new guardrail system with standard railing components along with approach and departure terminal systems, accompanied by limited roadside grading up to a maximum depth of 4.5 feet. Approximately 15 minor brush specimens will be removed during site preparation, and construction will utilize equipment such as bobcats, jackhammers, loaders, drill rigs, and dump trucks. The project is scheduled to be completed within 20 working days without the need for traffic detours or nighttime operations. Construction noise is exempt from local restrictions under San Bernardino County Development Code 83.01.80(g)(3), permitting active work between 7:00 a.m. and 7:00 p.m., excluding Sundays and federal holidays. The project site is located at Caughlin Road and the California Aqueduct, and the work is exempt from detailed environmental review under CEQA Class 1 and Class 2 categorical exemptions. The project is listed as a forecast with no solicitation number, formal contract value, or detailed pricing information provided. While the agency is identified as San Bernardino County Department of Public Works with contact details for Manikhone Cruz and Arlene B. Chun, no formal contract clauses from the Federal Acquisition Regulation are applicable or included. No specific evaluation factors, award basis, payment instructions, invoicing systems, or contracting officer representatives are detailed. There is no specification of packaging, marking, inspection criteria beyond Caltrans compliance, or delivery terms such as FOB. No offeror representations, certifications, unique entity IDs, or socioeconomic status requirements are included since the project involves a government entity managing its own infrastructure rather than a competitive procurement requiring vendor submissions. All referenced documentation supports a straightforward, locally administered infrastructure improvement with minimal administrative overhead and no federal contractual obligations.

General Info

San Bernardino County to install guardrail on Caughlin Road with minimal environmental impact, no detours, within 20 working days.

Agency

California → San Bernardino County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Caughlin Road, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Caughlin Road Guardrail_H14888 Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Bernardino County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Bernardino County
Office AddressN/A
Contacts
Manikhone CruzPlanner III

Full Description

Show more
The San Bernardino County Department of Public Works (DPW) is proposing a guardrail improvement project consisting of new railing system per Caltrans standards, which will include, but not be limited to, standard railing, and approach and departure terminal systems, with grading of 4.5 feet deep maximum. Equipment planned for use includes, but is not limited to, bobcat, jackhammer, loader, drill rig, and dump truck. Removal of approximately 15 minor brushes is planned at this project site. No traffic detours or nighttime construction are planned at this time. Construction duration is anticipated for approximately twenty (20) working days. San Bernardino County Development Code 83.01 .80(g)(3): exempts noise from temporary construction, maintenance, repair, or demolition activities between 7:00 a.m. and 7:00 p.m., except Sundays and Federal holidays.

Similar Contracts

Same NAICS industry code