This Solicitation opportunity from Florida was posted on September 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
CDBG-MIT Construction Services for King & Baker Drainage System Replacement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The DeSoto County Board of County Commissioners is seeking bids from qualified contractors for the federally funded King and Baker Drainage System Improvements project, aimed at replacing or rehabilitating approximately 3,700 feet of aging 66-inch corrugated metal drainage pipes and associated inlet structures. The project is financed through the Community Development Block Grant Mitigation Program (CDBG-MIT), and contractors may submit bids for either the cured-in-place pipe lining alternative or full replacement with reinforced concrete pipe, with the county reserving the right to select the most beneficial option and adjust bid items to align with available funding. Work is scheduled to occur Monday through Friday from 7:00 am to 6:00 pm, with occasional Saturday work subject to mutual agreement, and must be completed within 180 days for substantial completion, with an additional 30 days allocated for final completion, totaling a maximum of 210 days. The bidding process involves specific milestones, including bid advertisement, submission, review, and approval by the County Commissioners, with dates to be determined upon bid package approval. The project’s scope emphasizes long-term durability improvements, with the county retaining discretion to modify the scope to meet budget constraints. The contract size is estimated between two and five million dollars, and interested contractors can access detailed bid information through the provided DemandStar link. The project underscores a structured schedule and clear deadlines to ensure timely completion of the drainage system overhaul, supporting the county’s infrastructure resilience and flood mitigation efforts.
General Info
Agency
Place of Performance
FL, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
SCOPE: This project is federally funded by the State of Florida Department of Economic Opportunity through the Community Development Block Grant Mitigation Program (CDBG-MIT). The project involves mitigations efforts to overhaul the current decaying King and Baker Drainage System and renew it with a system designed with a longer service life. The existing system includes approximately 3,700 linear feet of 66-inch corrugated metal drainage main line piping, inlet structures and connections of smaller drainage pipes. Two alternatives are proposed for this project: a cured in place pipelining approach and a replacement using reinforced concrete pipe. Contractors may bid one or both alternatives. The County will select the alternative which the County believes serves the best interest of the County. The County also reserves the right to reduce the length of pipe replacement or other bid items to bring the construction cost in line with the grant funding.
TIME FRAME: All work shall be performed on Monday through Friday on non-County holidays from 7:00am to 6:00pm. Occasional Saturday work may be approved only upon mutual advanced agreement between the County, CEI, and the Contractor.
Substantial Completion shall be complete within ONE HUNDRED EIGHTY (180) calendar days of the notice to proceed. Final Completion shall include an additional THIRTY (30) calendar days for a maximum construction time of TWO HUNDRED TEN (210) calendar days. Substantial Completion shall be defined as all work excluding minor clean up, sod restoration, asphalt striping demobilization, and correction of punch list items from substantial competition walkthrough which can be performed within the period between substantial completion and final completion.
SCHEDULE: The following schedule shall be adhered to, insofar as practical, in all actions related to this procurement: A. Advertising date of bids: TBD upon approval of Bid Package B. Receipt of bids: TBD upon approval of Bid Package C. Review of bids / Bid tabulation: TBD upon approval of Bid Package D. Projected Board of County Commissioners’ approval: TBD upon approval of Bid Package
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
