Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
Solicitation IFB-2026-019 involves the replacement of heating, ventilating, and air conditioning (HVAC) systems at Carmel Fire Station #344, located at 5032 E Main St, Carmel, IN. The scope of work encompasses the installation of new HVAC systems, including split-system air conditioners and power ventilators, along with related electrical, controls, and ancillary work. Because the station must remain occupied and in continuous 24/7 operation throughout the project, the work must be phased according to a specific Project Plan and Construction Approach Summary. Key deliverables include general conditions such as mobilization and temporary climate control, selective demolition, concrete equipment pads, structural metal supports, and plumbing for condensate and gas piping.
The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit an itemized proposal, a bid bond or certified check for at least 10% of the bid price, and a mandatory financial statement along with State Board of Accounts Form 96. The successful contractor must provide a 100% performance and payment bond and proof of insurance from a company licensed in Indiana. Technical requirements include strict labeling standards for piping and equipment per ASME A13.I, compliance with OSHA and NFPA70E for arc-flash warning signs, and adherence to AMCA standards for fan performance. Payment is managed via AIA Documents 0702 and 0703, with final payment contingent upon the delivery of as-built drawings, operating manuals, and the release of liens.
General Info
HVAC system replacement at Carmel Fire Station #344 via lowest responsive bidder.
HighAI Summary for 5.3 Structural - First Floor Slab and Framing Plan: Architectural and structural drawings from Schmidt Associates dated 10/28/2023. The document includes first floor slab and framing plans, roof opening details, and general construction notes for project 2023-028-4H1, including references to HVAC replacement and framing specifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 5.4 Architecture - General Notes and Specifications: Technical architectural specifications document containing general roof plan notes, material symbols, refrigeration system schematics, and detailed general demolition notes including ASTM standards and contractor requirements.
PDF
PDF, High priority: read this first6 pages · contract-document
HighAI Summary for Agreement for Purchase of Goods and Services - City of Carmel, Indiana: This Agreement for Purchase of Goods and Services is entered into by the City of Carmel, Indiana and a Vendor authorized to do business in Indiana. It outlines terms and conditions including vendor acceptance, performance standards, pricing and payment terms, warranty, time and performance obligations, disclosure requirements, lien restrictions, default conditions, insurance and indemnification, government compliance, and nondiscrimination. The document ensures the vendor provides goods and services conforming to specifications and within agreed pricing, with protections for the City including indemnification and compliance with laws. The Agreement is effective upon execution by both parties and emphasizes timely performance and legal compliance.
PDF
PDF, High priority: read this firstifb
HighAI Summary for CFD Station #344 HVAC Renovation (IFB-2026-019): Invitation for Bids (IFB-2026-019) issued by the City of Carmel for the HVAC renovation at Fire Station #344. The project includes replacing HVAC systems and related electrical and controls work. Bids are due by December 16, 2026, with a mandatory pre-bid conference on December 2, 2026. The project is scheduled to run from January 4, 2027, to March 5, 2027.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of Carmel - Carmel Fire Station #44 Technical Specifications: Technical specifications prepared by Schmidt Associates for the City of Carmel regarding Fire Station #44 (Project No. 2026-028.44H), dated October 21, 2026. The document includes a detailed table of contents covering multiple divisions including selective demolition, concrete, structural steel, roofing, finishes, plumbing, and HVAC, as well as specific requirements for selective demolition (Section 024119).
PDF
PDF, High priority: read this first1 page · field-order
HighAI Summary for City of Carmel Field Order: This document is a Field Order issued by the City of Carmel for a specific project. It directs the contractor to promptly execute minor changes or interpretations of the contract documents without altering the contract price or time. If a change in price or time is needed, the contractor must submit a proposal to the engineer before proceeding. The Field Order may be superseded by a Change Order if the proposal is approved. The document includes sections for description, attachments, engineer, approval by owner's representative, and date.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of Carmel Fire Station #44 HVAC Replacement - General Notes and Life Safety Plan: Technical drawings and general notes for the HVAC replacement project at City of Carmel Fire Station #44 (Project 2026-028.44H). The document includes a scope of work for new roofed area handling units, boilers, chillers, and cooling equipment, along with code summaries and fire and life safety plans dated October 28, 2026.
PDF
PDF, High priority: read this first1 page · modification
HighAI Summary for Contract Change Order - City of Carmel: This document is a Contract Change Order for the City of Carmel. It directs changes to an existing contract, including adjustments to contract price and time. The form includes sections for description of changes, schedule adjustments, referenced documents, and signatures from the engineer, contractor, and city officials. It serves as a formal amendment to the contract, detailing increases or decreases in contract price and time, and confirms full settlement of related costs and time extensions.
PDF
PDF, High priority: read this first1 page · contract-change-request
HighAI Summary for Contract Change Request - City of Carmel: This document is a Contract Change Request form from the City of Carmel. It is used to request changes to an existing contract, including scope of work modifications, reasons for the change, cost adjustments, and potential impacts on contract time and personnel. The form includes sections for identifying attachments and requires preparation and review by relevant personnel, including an engineer. The document is essential for managing contract modifications and ensuring proper authorization and documentation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Electrical Legend and Specifications: This document provides electrical legends, symbols, and abbreviations for lighting, power distribution, wiring devices, and fire alarm systems. It includes general construction notes for floor plans and demolition notes referencing sheets E-01 and E-02 for electrical installation.
PDF
PDF, High priority: read this first17 pages · memorandum-of-understanding
HighAI Summary for E-Verify Memorandum of Understanding for Employers: This document is the E-Verify Memorandum of Understanding (MOU) between the Department of Homeland Security (DHS) and the Employer. It outlines the purpose and authority of the E-Verify program, which electronically confirms employees' eligibility to work in the U.S. The MOU details the responsibilities of the Employer, including compliance with Form I-9 procedures, use of E-Verify access, and notification requirements for tentative nonconfirmations. It references legal authority under the Illegal Immigration Reform and Immigrant Responsibility Act and Federal Acquisition Regulation. The document emphasizes the Employer's obligations to display notices, maintain current contact information, complete tutorials, and adhere to anti-discrimination laws. The MOU is a binding agreement to ensure proper use of E-Verify in verifying employment eligibility.
PDF
PDF, High priority: read this first2 pages · maintenance-bond
HighAI Summary for Maintenance Bond for City of Carmel Public Improvements: This Maintenance Bond document for the City of Carmel guarantees the workmanship and materials used by the contractor in public improvement projects. It is executed by the contractor and a surety company authorized to do business in Indiana and listed on the U.S. Treasury Department's approved surety list. The bond covers a three-year period after acceptance of the work for repairs or replacements due to defective workmanship or materials. The bond is a binding legal obligation ensuring the contractor's responsibility for maintenance and compliance with all applicable laws and contract documents.
PDF
PDF, High priority: read this first1 page · manufacturers-list
HighAI Summary for Manufacturers List and Instructions to Bidders: This document titled 'Manufacturers List' provides instructions to bidders on how to specify the manufacturer for each equipment item listed. Bidders must enter the name of only one manufacturer per equipment item, and failure to do so may render the bid non-responsive. Upon contract award, equipment must be furnished by the named manufacturer unless authorized changes are made. Equipment substitutions require prior consent from the owner. Acceptance of equipment by manufacturer name does not waive compliance with drawings and specifications. The document ensures conformity with contract requirements for equipment items.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Mechanical Specifications and Demolition Notes: A technical document containing receiver hardware specifications (voltage, current, and connector types) and general demolition notes for a residential building project by Schmidt Associates. It includes technical input/output requirements and general contractor guidelines for demolition and waste disposal.
PDF
PDF, High priority: read this first2 pages · payment-bond
HighAI Summary for Payment Bond for City of Carmel Construction Project: This Payment Bond document for the City of Carmel outlines the surety agreement between the contractor and the surety company to guarantee payment to all claimants involved in a public construction project. It includes conditions that the contractor must promptly pay all subcontractors, material suppliers, and laborers. The bond is executed by the contractor and surety, with provisions ensuring the bond remains effective despite contract changes or delays. The document references compliance with U.S. Treasury Department Circular 570 for surety companies and specifies that the bond remains in effect until one year after the owner's final settlement with the contractor.
PDF
PDF, High priority: read this first12 pages · specifications
HighAI Summary for Plumbing Abbreviations and Symbols: A technical reference document containing a comprehensive list of plumbing abbreviations, symbols, and drawing notations. It defines terminology for piping systems (e.g., domestic water, fire protection, acid waste), equipment tags, and fire protection symbols used in project drawings.
PDF
PDF, High priority: read this first1 page · modification
HighAI Summary for Request for Proposal Change - City of Carmel: This document is a Request for Proposal Change issued by the City of Carmel. It requests a proposal within fifteen calendar days showing any increase, decrease, or no change in contract price and/or contract time. The proposal must include a detailed breakdown of quantities, costs, labor, overhead, profit, and justification for additional time if applicable. The document clarifies that this request does not authorize proceeding with the work until a Contract Change Order and Notice to Proceed are issued. It also asks for the effect on the project's Substantial and Final Completion dates if accepted within a specified timeframe.
PDF
PDF, High priority: read this first1 page · subcontractors-list
HighAI Summary for Subcontractors List for Bid Submission: This document is a Subcontractors List intended for bidders to enter the names and types of work for subcontractors proposed to perform work valued at 5% or more of the total bid amount. It includes instructions emphasizing that only one subcontractor per work item should be listed and that the named subcontractors will be employed upon contract award unless changes are authorized. Omissions may render a bid non-responsive if deemed materially advantageous. The document serves as a critical part of the bid submission process to ensure transparency and compliance with subcontracting requirements.
PDF
PDF, High priority: read this first1 page · work-directive-change
HighAI Summary for Work Directive Change - City of Carmel: This document is a Work Directive Change issued by the City of Carmel for a specific project. It authorizes additional or modified work to be completed as outlined, with a contract change order to follow for the associated cost. The document includes references to specifications and drawings, a description of the work covered, reasons for the order, and authorization signatures from the City's Board of Public Works and Safety and City Engineer. It also notes the project completion date adjustment if any.
PDF
PDF, Low priorityaffidavit
LowAI Summary for Exhibit D E-Verify Affidavit: This document is Exhibit D, an affidavit related to the Employer's participation in the federal E-Verify program. It includes statements affirming the affiant's knowledge and authority, the Employer's enrollment in E-Verify, and that the Employer does not knowingly employ unauthorized aliens. The affidavit is sworn under penalty of perjury under U.S. and Indiana laws, with spaces for execution date and printed names.
PDF
PDF, Low priority1 page · special-notice
LowAI Summary for Instructions for Bids - E-Verify Screenshot Requirement: This document provides instructions for bids, specifically requiring that all bids include E-Verify documentation. The documentation must include a computer screenshot of the business's E-Verify webpage. Failure to include these requirements will result in the bid being voided.
PDF
PDF, Low priority1 page · affidavit
LowAI Summary for Non-Collusion Affidavit: This document is a Non-Collusion Affidavit sworn by the contracting party or their representative. It affirms that no collusion, combination, or agreement to pay or receive money outside the contract terms has occurred. The affidavit includes spaces for signature, printed name, title, company, and notarization details including notary signature, county of residence, and commission expiration date.
PDF
PDF, Low priority2 pages · performance-bond
LowAI Summary for Performance Bond for City of Carmel Project: This document is a Performance Bond form for the City of Carmel, Indiana. It outlines the obligations of the Contractor and Surety to the Owner (City of Carmel) to ensure faithful performance of a construction contract. The bond guarantees payment and performance under the contract, including indemnification of the Owner against losses due to Contractor default. The Surety must be authorized and listed on the U.S. Treasury Department's approved list. The bond remains in effect through the contract term, any extensions, and warranty periods, and is not released until one year after final settlement. The document includes execution instructions and signature blocks for the Contractor, Surety, and witnesses.
PDF
PDF, Low priority1 page · contract-document
LowAI Summary for Right of Entry Agreement - City of Carmel, Indiana 2016: This Right of Entry document, dated 2016, grants the City of Carmel, Indiana, and its agents the right to enter specified real property to perform work described in attached exhibits. It outlines the responsibilities of the Grantee to protect and indemnify the Grantor from damages or injuries arising from the work. The document requires restoration of the property to its original or better condition upon completion and specifies termination conditions for the right of entry. It includes signature lines for the Grantor to execute the agreement.
Replacement of the heating, ventilating and air conditioning (HVAC) systems at Carmel Fire Station #344, 5032 E Main St, Carmel, IN 46033, together with related electrical, controls and ancillary work, as shown on the Drawings and described in the Specifications. The station will remain occupied and in continuous 24/7 operation throughout construction; The Work shall be phased and performed in accordance with Article 17 of the Supplementary Conditions, including the Construction Approach Summary and Project Plan requirements of Paragraph 17.11.