This Solicitation opportunity from Department Of Homeland Security was posted on May 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
CGC BISCAYNE BAY WATER MIST FIRE SUPPRESSION INSPECTION
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract requires a certified HI-FOG technician to perform an annual inspection on the Hi-Fog Water Mist Fire Suppression System aboard the CGC BISCAYNE BAY located in St. Ignace, Michigan. The technician will be responsible for setting up, testing, and restoring the water mist system to normal operation, ensuring that all connections, fittings, and equipment are functioning properly. Minor adjustments and tuning are authorized if no new parts or additional labor costs are involved. Any significant discrepancies or repair needs beyond the scope of the inspection must be documented, and further work is subject to approval by the Government Technical Point of Contact and Contracting Officer. The period of performance for this service is from May 25 to May 28, 2026. The contract is a total small business set-aside under NAICS code 336611 and is managed by the Department of Homeland Security through the SFLC Procurement Branch 2 office in Alameda, California. Points of contact for the contract include Shane C. Witko onboard the CGC BISCAYNE BAY as well as Sean P. McTague and Ulises O. Balmaceda at the contracting agency. The solicitation was posted on May 11, 2026, with a response deadline of May 15, 2026.
General Info
Agency
NAICS
Place of Performance
Saint Ignace, MI, 49781, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
STATEMENT OF WORK
CGC BISCAYNE BAY OPFAC: 17504 LOCATION: ST IGNACE, MI
EQUIPMENT: Hi-Fog Water Mist Fire Suppression System
COMPONENT AFFECTED: ANNUAL INSPECTION OF SYSTEM
MPC: R-A-13380, R-M-13373, R-C-14526
Contractor must be HI-FOG certified Technician. Contractor must set up water mist system for testing; complete the water mist system test; and place water mist system back in normal operation once test is completed. Contractor must ensure all connections, fittings, and equipment within the water mist system are operating correctly as well. Contractor shall use MPC R-A-13380 as guidance.
The contractor is authorized to perform minor adjustments and tuning as required to restore the system to normal operation, provided these actions do not require any new parts or incur any additional labor costs.
Any discrepancy found that requires new parts or significant labor beyond the scope of a standard annual inspection shall be documented in the Final Service Report. The contractor shall not proceed with any repairs. The Government Technical Point of Contact (TPOC) will route the report to the Contracting Officer, who is the sole authority for authorizing any work that results in additional cost.
POP: 25MAY26-28MAY26
LOCATION/POC:
Witko, Shane CWO-2 USCG CGC BISCAYNE BAY (USA) Shane.d.witko@uscg.mil
Address:
CGC BISCAYNE BAY WTGB (104)
1075 HURON ST
ST IGNACE, MI 49781-0000
958-285-2047
