Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Illinois was posted on October 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CHANGE ORDER NOTICE De-Icer for Districts 2-7

Closed
26-494DOT-FINAD-B-49882State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
SLED
Install Pier D High Pressure Air System, NSBREM-724-A
Solicitation # N4425527RB003
Solicitation N4425527RB003 is a Design-Build project for the installation of a permanent high pressure air (HPA) system at Pier D, B724A of Naval Base Kitsap in Bremerton, Washington. The scope of work includes the design, construction, and commissioning of the system, specifically incorporating the existing HPA cross connection into a system supplied by HPA compressors on the south end of Pier D. The contractor must provide HPA to shore risers at five specific locations: East bollards 11, 59, and 101, and West bollards 47 and 59. All new piping is required to be installed under service grates with valves located topside. The project must adhere to strict DoD and Navy design codes, including UFC and ASME standards, with the most stringent requirement governing in the event of discrepancies. This is a 100% set-aside for 8(a) businesses located within SBA Region X, with an estimated construction magnitude between 1 million and 5 million dollars. The contract is a Firm-Fixed-Price task order under the 8(a) MACC with a period of performance of 538 calendar days from award. Award will be based on price and MACC past performance. Key requirements include compliance with EM 385-1-1 safety standards, adherence to MIL-STD101C for piping color coding, and the integration of cybersecurity per UFC 4-010-06. Contractors must manage strict security and base access protocols through the BAVR system and provide a bid guarantee of 20% of the bid price or 3 million dollars, whichever is less.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in 14 days
NAICS: 238220
New
CBP#9772 HVAC Air Handling Unit (AHU) and Ductwork Cleaning Services
Solicitation # CBP#9772
Management & Training Corporation (MTC) is seeking a subcontractor for solicitation CBP#9772 to provide HVAC Air Handling Unit (AHU) and ductwork cleaning services at the Edison Job Corps Center in Edison, New Jersey. This fixed-price, single lump sum contract, with an estimated value between $100,000 and $250,000, requires the thorough cleaning of twelve AHUs, twenty-eight specified coils, and all associated accessible supply, return, and outside-air ductwork. The scope of work includes pre-cleaning inspections with photographic documentation, the installation of durable gasketed access panels, filter replacements, and all necessary ceiling repairs and painting. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work performed between 8:00 a.m. and 3:30 p.m. Bids will be evaluated based on overall best value, and a physical site visit is mandatory prior to submission. Required bid documentation includes a detailed cost breakout and a bid bond guarantee of at least 20% for bids exceeding $25,000. Awarded contractors must provide performance and payment bonds if the bid is $25,000 or more, possess a Unique Entity ID (UEI), and comply with Davis-Bacon prevailing wage determinations for Middlesex County. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. Final acceptance of the work is contingent upon a Center inspection and the submission of a comprehensive final project report.
Edison Job Corps

POSTED

about 7 hours ago

DEADLINE

in about 6 hours
NAICS: 238220
New
CBP7787 ED1 RM 123 HVAC Compressor Replacement
Solicitation # CBP7787 ED1 RM 123
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to replace a failed HVAC/refrigeration compressor at the ED1 Building of the Sierra Nevada Job Corps Center in Reno, Nevada. The project scope is divided into four phases: preparation and environmental safety, demolition and removal, installation of an OEM-specified compressor and related components, and system testing and commissioning. All work must comply with EPA Section 608 regulations for refrigerant recovery and adhere to minimum wage rates and fringe benefits established for building construction in Washoe County, Nevada. The estimated price range for this opportunity is between 0 and 25,000 dollars. Bids are due by November 17, 2026, and must be submitted via email. A physical site visit and signature on the attendance roster are mandatory prior to bid submission. Required documentation includes a signed bid sheet, a detailed bid breakout, and a Unique Entity Identifier (UEI) number. For bids equal to or greater than 25,000 dollars, a bid bond guarantee of at least 20 percent of the base bid, as well as performance and payment bonds from a surety with at least an A- rating, are required. Award decisions will be based on overall best value. Final payment is contingent upon a successful final inspection, submission of a Notice of Final Completion, and the delivery of certified payroll reports and operation and maintenance manuals.
Sierra Nevada Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in about 9 hours
NAICS: 238220
New
Joliet Job Corps-Request for Quote HVAC Replacement Female Dormitory
Solicitation # joliet-job-corps-request-quote-hvac-replacement-female-dormitory
Management & Training Corporation (MTC), operator of the Joliet Job Corps Center, is seeking bids for a fixed-price, single lump sum subcontract to replace the HVAC systems in the female dormitories in Joliet, Illinois. The project involves the removal and disposal of existing equipment and the installation of ten new Carrier furnace and air conditioning systems, along with the installation and integration of a Pelican Building Automation System (BAS) across eleven units. The estimated contract value ranges from $250,000 to $500,000. Bids must be submitted to Frances McGraw by November 23, 2026, and must include a detailed cost breakout, a signed MTC Bid for Lump Sum Contract form, and a completed supplier self-certification packet. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids of $25,000 or more, contractors must provide a bid bond guarantee equal to 20% of the base bid, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. The project is subject to the Davis-Bacon Act, requiring compliance with specific Illinois prevailing wage rates and the submission of certified payroll. Additionally, contractors must maintain general liability insurance of at least $1,000,000 and worker's compensation insurance with employer's liability limits of $500,000. Award decisions will be based on overall best value.
Joliet Job Corps

POSTED

about 7 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
Centennial Dry Sprinkler System & Compressor Replacement Services
Solicitation # centennial-dry-sprinkler-system-compressor-replacement-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to provide dry-type sprinkler system and compressor replacement services at the Centennial Job Corps Center in Nampa, Idaho. The project focuses on eliminating severe piping leaks and preventing equipment wear caused by air compressor short-cycling within the Men's Dormitory (Building CM), Women's Dormitory (Building CW), and Recreation Building (Building D). The scope of work includes the demolition and removal of existing distribution piping and failing compressors, followed by the installation of new equipment and rigorous operational and leak testing. All work must be completed within 30 consecutive business days from the Notice to Proceed and must adhere to NFPA 25 (2023 Edition) and other applicable local, state, and national codes. Bids are due by December 1, 2026, and will be evaluated based on overall best value. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids equal to or greater than $25,000, contractors must provide a bid bond guarantee of 20% of the base bid, and the awarded contractor will be required to provide performance and payment bonds from an A-rated surety company. This solicitation is set aside for HUBZone, Woman-owned, and Service-Disabled Veteran-owned small businesses. Contractors must comply with strict federal labor and regulatory requirements, including the Davis-Bacon Act for prevailing wage rates, the Contract Work Hours and Safety Standards Act, and FFATA reporting for contracts valued at $40,000 or more. Required submission documents include a detailed cost breakout, proof of insurance, and a completed supplier self-certification form. Final payment is contingent upon the submission of a Notice of Final Completion, final certified payroll reports, a Certificate of Release of Liens, and two complete sets of Operation and Maintenance manuals.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in 14 days
NAICS: 238220
New
Inland Empire Job Corps-Request for Quote HVAC Replacement Cafeteria & OA CTS
Solicitation # inland-empire-job-corps-request-quote-hvac-replacement-cafeteria-oa-cts
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to replace packaged HVAC units with gas heating at the Inland Empire Job Corps Center in San Bernardino, California. The project focuses on the Cafeteria and OA/CTS areas and includes the removal of existing units per EPA refrigerant regulations, installation of new high-efficiency units at ground-level or rooftop locations, and the modification of gas piping, ductwork, and electrical disconnects. The estimated contract value ranges from $25,000 to $100,000. Bids are due by November 23, 2026, and must be submitted to Fran McGraw. Award will be based on overall best value, with mandatory requirements including a physical site visit, a bid bond of 20% for bids $25,000 or more, and the ability to provide performance and payment bonds from a surety with at least an A- rating. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of certified payroll reports. Bidders must provide a detailed cost breakout, equipment specifications, and a completed supplier self-certification packet. Required deliverables upon completion include startup testing, two sets of operation and maintenance manuals, and manufacturer warranties.
Inland Empire Job Corps

POSTED

about 7 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
CBP7792 Cafeteria Hot Water Heater Replacement
Solicitation # CBP7792
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to replace the cafeteria hot water heater at the Sierra Nevada Job Corps Center in Reno, Nevada. The project requires a licensed plumbing contractor to isolate, remove, and dispose of an existing failing unit and install a new commercial-grade, 125-gallon natural gas-fired water heater. The estimated price range for this effort is between $25,000 and $100,000, with bids due by November 25, 2026. Award decisions will be based on overall best value, evaluating price, quality, delivery schedule, and relevant experience. Qualified bidders must submit their offers using the MTC Bid for Lump Sum Contract form, accompanied by a detailed cost breakout on company letterhead and three professional references. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from an A-rated surety. The contractor is responsible for all permits, inspections, and the provision of operation and maintenance manuals and warranties. Compliance with federal regulations is mandatory, including the Davis-Bacon Act for prevailing wages in Washoe County, Buy American requirements, and various FAR clauses regarding whistleblower rights, security, and the prohibition of trafficking in persons. Additionally, first-tier subcontractors with awards over $45,000 must disclose their debarment status, and those with contracts over $40,000 are subject to FFATA reporting. Awarded contractors must obtain a Unique Entity Identifier (UEI) and provide proof of insurance before commencing work.
Sierra Nevada Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in 8 days
NAICS: 238220
New
CBP#10027 Replace Cafeteria Waste Line & Floor Restoration
Solicitation # CBP#10027
Management & Training Corporation (MTC) is seeking a subcontractor for a fixed-price, single lump sum project at the Edison Job Corps Center in Edison, New Jersey. The scope of work involves the removal and replacement of compromised underground waste piping serving the cafeteria food line, including saw-cutting floors around 3-inch drains, backfilling, and professional floor restoration. The contractor is responsible for providing all labor, materials, and equipment to ensure a code-compliant, leak-tested system. The estimated price range for this effort is up to 25,000 dollars, with a performance period of 30 consecutive business days following a written Notice to Proceed. Bids are due by November 16, 2026, and must be submitted to Wendy Lawrence. Required documentation includes the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a Certificate of Insurance, and a completed SF 1413 form. For bids equal to or greater than 25,000 dollars, a bid bond of 20 percent is required, along with performance and payment bonds from a surety with at least an A- rating. This project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wage and fringe benefit rates for Middlesex County. Award will be based on overall best value, and the contractor must possess a Unique Entity ID (UEI) for federal funding compliance.
Edison Job Corps

POSTED

about 7 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

This contract involves a Change Order Notice related to the De-Icer for Districts 2-7, issued by the Illinois Department of Transportation. The original solicitation, numbered 26-494DOT-FINAD-B-49882, was posted on October 28, 2025, with a response deadline of November 12, 2025. The primary purpose of this change order is to extend the existing contract identified as 24-494DOT-FINAD-P-59485 by an additional three months, moving the contract duration from December 1, 2025, to February 28, 2026. The contract size is estimated to be between $500,000 and $2,000,000, indicating a substantial scope of work likely involving significant procurement or services related to de-icing operations across multiple districts within Illinois. The contract is managed under the NAICS code 238220, which pertains to plumbing, heating, and air conditioning contractors, suggesting that the work may involve specialized equipment or services related to de-icing. The organization responsible is the Illinois State Law Enforcement Department (SLED), with Timothy G. Neisler serving as the primary contact person. The contract details are accessible via the Illinois bid portal, although the specific documents associated with the change order are unreadable. Overall, this extension reflects ongoing operational needs for winter maintenance and de-icing services in Illinois, ensuring continued support during the winter months of the upcoming season.

Documents

1
PDF, Low priority1 page · other
Low

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Install Pier D High Pressure Air System, NSBREM-724-AOpen now, due in 15 days
  • Water Pump ReplacementOpen now, due in 13 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIllinois Department of Transportation
Contacts1 person available
OfficeN/A

Full Description

Show more
This Change Order Notice is to extend 24-494DOT-FINAD-P-59485 for 3 months. The dates would be 12/1/2025 to 2/28/2026.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS