Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Channel Excavation and Capacity Restoration involves performing dredging, excavation, and capacity restoration of an engineered channel for prime contractors on East Bay Municipal Utility District projects in Bixler, California. The scope of work includes removing sediment and obstructions, regrading or deepening the channel to restore design capacity, and managing runoff to protect the Mokelumne Aqueduct right-of-way. The project requires the use of excavators and dredging equipment while strictly adhering to environmental windows for nesting bird seasons to ensure compliance. The ultimate goal of the contract is the delivery of a fully restored engineered channel within the specified performance area.

General Info

Subcontract for channel excavation and capacity restoration for EBMUD projects in Bixler, California.

Agency

California → East Bay Municipal Utility District

Place of Performance

CA, 94513

Set-Aside

NONE

Documents

This scope was carved out of 2026-00189.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Indian Slough Channel Capacity Restoration Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → East Bay Municipal Utility District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → East Bay Municipal Utility District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs dredging, excavation, and capacity restoration of an engineered channel for prime contractors on East Bay Municipal Utility District projects in Bixler, CA. Removes sediment and obstructions, regrades or deepens the channel to restore design capacity, and manages runoff to protect the Mokelumne Aqueduct right-of-way. Uses excavators and dredging equipment. Adheres to environmental windows for nesting bird seasons. Delivers a restored engineered channel.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
W2SD Endist New England

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS