Charging Infrastructure and Shore Power Integration
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Water Emergency Transportation Authority of California is seeking a subcontractor for the design and installation of high-power shore charging stations. This project focuses on integrating shore power infrastructure at ferry terminals located in San Francisco, Oakland, and Alameda to support the rapid recharging of electric vessels. Classified under NAICS code 237130 for highway, street, and bridge construction, the contract was posted on August 25, 2025. The primary objective is to establish the necessary electrical infrastructure to enable the transition to sustainable, electric-powered maritime transportation across these key Bay Area terminals.
General Info
Agency
Place of Performance
CASet-Aside
Documents
This scope was carved out of NOE_WETA_400PAX_Vessel_OPR.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
WETA Acquisition of Two New All-Electric 400-PAX Vessels
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
