Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

China Slough Routine Maintenance Agreement - Yolo County

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The China Slough Routine Maintenance Agreement involves the removal of debris and overgrown vegetation along an 11-mile stretch of China Slough in unincorporated Yolo County, California, to improve water conveyance and support the Yolo-Zamora Groundwater Recharge Pilot Project. The work spans from coordinates 38.724371, -121.856330 to 38.821645, -121.795349 and is intended to restore functional flow in the channel to ensure consistent downstream water delivery for groundwater recharge efforts. Administered by the Yolo Subbasin Groundwater Agency, the project is processed under California’s Environmental Quality Act (CEQA) as a categorical exemption under Sections 15301 and 15302, which apply to routine maintenance of existing water conveyance facilities. No federal acquisition regulations or standardized contract clauses were applied, as this is a state-level environmental compliance action rather than a federal procurement. The lead agency, located at 34274 State Highway 16 in Woodland, CA, is responsible for oversight, with Erik Cadaret serving as the primary point of contact and acting in a contractor-level execution role. The administrative process requires the submission of a Notice of Exemption, a California Department of Fish and Wildlife No Effect Determination, and evidence of a previously paid $50 filing fee, all filed with the Yolo County Clerk-Recorder’s Office. There are no specified performance timelines, delivery schedules, or contract pricing details in the documentation, and the contract value remains undefined beyond the nominal environmental filing fee. No packaging, marking, preservation, or logistics standards were outlined, and no federal payment systems, invoicing platforms, or contracting officer roles are involved. The entity is classified as a local public agency, with no small business or socioeconomic certifications claimed, and no Unique Entity ID or CAGE code provided. The entire process is paper-based, with no electronic submission portals, digital signatures, or online platforms referenced. All documentation is centralized around environmental compliance approvals rather than traditional contract administration, reflecting a streamlined, locally managed approach to maintaining critical water infrastructure for regional groundwater sustainability efforts.

General Info

Routine maintenance of 11-mile China Slough channel for groundwater recharge, state-compliant, locally administered.

Agency

California → Yolo Subbasin Groundwater Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption - China Slough Routine Maintenance Agreement - Yolo County

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Yolo Subbasin Groundwater Agency
Contacts1 person available
OfficeN/A
Organization / Agency
California → Yolo Subbasin Groundwater Agency
Office AddressN/A
Contacts
Erik CadaretAssistant General Manager

Full Description

Show more
The purpose of this project is to remove debris blockages and overgrown vegetation from China Slough with the goal of improving water conveyance in the channel and enhance water delivery downstream to facilitate the Yolo-Zamora Groundwater Recharge Pilot Project.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details