Chorro Valley Access Road Repair Project. Project No. 300716/ ED26-0091

Forecast
ED26-0091State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The County of San Luis Obispo Flood Control and Water Conservation District is planning the Chorro Valley Access Road Repair Project to address significant erosion along a 300-foot section of the road caused by storm events in January 2023. This erosion has compromised the embankment supporting the roadway and threatens the integrity of a nearby buried water pipeline. To mitigate these risks, the project will install a soldier pile retaining wall along the affected segment, along with repairs to existing culverts, replacement of the roadway surface, and installation of a guardrail. The work is designed to stabilize the slope without altering natural habitats or impacting jurisdictional waterways, ensuring environmental compliance while safeguarding critical infrastructure. Construction is expected to be completed within approximately three months and is being managed under Project No. 300716/ED26-0091. The opportunity was posted on June 23, 2026, and is forecasted for future procurement, with Kate Shea, Division Manager, serving as the primary point of contact for inquiries. The project will be carried out within San Luis Obispo, California, and is not subject to any set-aside requirements. All activities are scoped to restore safety and functionality to the road without expanding its footprint or affecting protected environmental areas.

General Info

Repair 300-foot eroded road in San Luis Obispo with retaining wall, culvert fixes, and guardrail, no environmental impact.

Agency

California → San Luis Obispo County

Place of Performance

Chorro Valley Access Road, San Luis Obispo, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Luis Obispo County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Luis Obispo County
Office AddressN/A
Contacts
Kate SheaDivision Manager

Full Description

Show more
The County of San Luis Obispo Flood Control and Water Conservation District is conducting the Chorro Valley Access Road Repair Project to stabilize an eroded section of Chorro Valley Access Road and to protect an adjacent buried water pipeline. Storm events in January 2023 eroded approximately 300 feet of embankment supporting the roadway, creating an unstable slope and increasing the risk of future damage to both the road and pipeline. The Project would construct a soldier pile retaining wall along the eroded roadway segment and include installation of a guardrail, repair of existing culverts, and roadway surface repairs. Construction is expected to take approximately three months. The project is not expected to alter habitat and is not within jurisdictional waterways.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site preparation, civil works, and surface improvements. Specific requirements encompass land surveying, site clearing, shoring, asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. Additionally, the project requires environmental and support services including storm water pollution prevention (SWPPP), quality control, and the supply of ready mix and precast concrete. This opportunity is specifically targeted toward qualified Small Business (SB), Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) firms, including MBE, VBE, and OBE certifications. To be considered responsive, bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested parties must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
250218.01 Reconstruction of 84th Avenue and Riley Street Bike Path
Solicitation # 250218.01
The City of Zeeland is soliciting bids for the reconstruction of 84th Avenue and the Riley Street Bike Path in Ottawa County, Michigan. This project involves approximately 1,450 feet of street and drive reconstruction and a shared use path, including HMA paving, storm sewer improvements, and the installation of manholes and catch basins. Major work items include 5,800 square yards of 8-inch aggregate base, 540 feet of 18-inch sewer in stone trench, and 2,800 feet of modified concrete curb and gutter. The engineer's estimate for the project is 1,111,000 dollars, and the work will be entirely funded by the City of Zeeland. Encrypted bids must be submitted via the Bid Express e-bidding system by 11 a.m. local time on Thursday, November 12, 2026. Bids will be evaluated on a unit price basis, and only bidders prequalified by the City of Zeeland will have their proposals opened. Submissions must include a proposal guarantee in the form of a bid bond or certified check for five percent of the bid amount. The successful contractor will be required to provide performance and lien bonds for 100 percent of the contract value, as well as certification of Workmen's Compensation Insurance. All work must adhere to MDOT Standard Specifications for Construction and be performed by a licensed DC contractor under the direction of the project engineer.
Moore & Bruggink, Inc

POSTED

about 3 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237310
New
SLED
26-33-1
Solicitation # 26-33-1
St. Tammany Parish Government is soliciting quotes for the Wildwood Farms Subdivision Drainage project in Pearl River, Louisiana. The scope of work requires a contractor to provide all labor, equipment, and materials to improve drainage by removing and replacing drain pipes, catch basins, and driveway pipes along Max Mercer Rd (R06I026) and Cecil Fleming Rd (R06I009). The project must be completed within 45 calendar days from the issuance of the Notice to Proceed. Key deliverables include approved shop drawings and final record drawings of all changes, including underground utilities. The contract will be awarded to the lowest responsive monetary quote from a contractor holding a Highway, Street, and Bridge Construction classification. For projects estimated at 50,000 dollars or more, contractors must be licensed under Chapter 24 of the Louisiana Revised Statutes, Title 37. Bids must be submitted by November 12, 2026, via certified mail, hand-delivery, or courier. Payment is structured through monthly certificates for partial payment at 90 percent of work performed and materials stored, with the final 10 percent released 45 days after filing acceptance and securing a Clear Liens and Privilege Certificate. Contractors must comply with various federal and state regulations, including the Clean Air Act, Clean Water Act, and several non-discrimination and equal opportunity statutes. Safety requirements mandate the use of fences, railings, and lighting around excavations to protect the public. The project is governed by the Manual on Uniform Traffic Control Devices and LADOTD Standard Specifications for Roads and Bridges. Required submission documents include a revised unit price form, corporate resolution of authority, and a W-9 for new vendors.
St. Tammany Parish Government

POSTED

about 6 hours ago

DEADLINE

in 2 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS