Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

City Hall Refurbishment and Safety Project Phase 5

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City Hall Refurbishment and Safety Project: Phase 5 is a major capital improvement initiative under the Fiscal Years 2025-36 program, focused on comprehensive upgrades to City Hall in Laguna Woods, California. The scope encompasses selective demolition, interior renovations including new walls, ceilings, doors, glazing, finishes, and millwork, as well as critical infrastructure enhancements such as lighting, electrical systems, audiovisual equipment, plumbing, and HVAC systems. Additional work includes structural reinforcement for rooftop equipment, accessibility modifications to meet current standards, and comprehensive safety and security improvements designed to ensure the building remains fully functional and secure for public and governmental use. The project is coordinated to integrate seamlessly with existing City-furnished equipment and includes full testing and commissioning to guarantee operational readiness. This effort aims to preserve and modernize the City’s only municipal building and sole seat of government, addressing long-standing maintenance deficiencies while elevating its safety, functionality, and accessibility for all users. The project is being managed by the City of Laguna Woods, with Justin Faylona, Senior Planner, serving as the primary point of contact. All work is scheduled to take place at the City Hall location in Laguna Woods, CA, with the project posted for forecast as of June 23, 2026, signaling the next phase of planning and procurement ahead of full implementation.

General Info

City Hall in Laguna Woods to undergo comprehensive renovation with safety, accessibility, and infrastructure upgrades.

Agency

California → City of Laguna Woods

Place of Performance

Laguna Woods, CA, 92637

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Laguna Woods
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Laguna Woods
Office AddressN/A
Contacts
Justin FaylonaSenior Planner

Full Description

Show more
The City Hall Refurbishment and Safety Project: Phase 5 is included in the Fiscal Years 2025-36 Capital Improvement Program and involves refurbishments and safety improvements at City Hall. The scope of work includes, but is not limited to, selective demolition; interior improvements to City Hall, including new walls, ceilings, doors, glazing, finishes, and millwork; lighting, electrical, audiovisual, plumbing, and heating, ventilation, and air conditioning (“HVAC”) improvements; accessibility and safety improvements; structural support for rooftop equipment; all related work necessary to provide a complete and operational project, including coordination with City-furnished equipment, testing, and commissioning; and, other accessibility, functionality, safety, and security-related work. The project is intended to address maintenance needs and ensure that City Hall remains accessible, functional, safe, and secure. The work will safeguard and enhance the City’s only City-occupied public building and seat of government.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 70Z04726RPCN0018
This project involves the design and construction of a approximately 13,000 gross square foot full motion Weapons System Trainer flight simulator facility for the C-130J aircraft at USCG Base Elizabeth City, North Carolina. The facility will include a simulator bay, classrooms, administrative spaces for 28 personnel, debriefing areas, and various support spaces for electrical, mechanical, and telecommunications systems. Site work includes sidewalks and landscaping, utilizing existing parking areas. The project is issued as a task order under the National Multiple Award Construction Contract III, Pool Two, with an estimated contract value of approximately 16 million dollars and a performance period of 719 calendar days. The contract requires a design-build approach, emphasizing compatibility with the existing Siemens Building Automation System and adherence to US Coast Guard Configuration Standard Technical Orders. Award is based on best value, utilizing tradeoff procedures to evaluate price against non-price factors, specifically the offeror's planning, organization, communication, and construction approach. Key requirements include the appointment of a full-time on-site Quality Control Manager, compliance with the Buy American Act, and strict security protocols requiring US citizenship for all personnel. The project also involves coordination with the North Carolina State Historic Preservation Office and various tribal consultations to ensure environmental and cultural compliance.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside for the construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) building at Joint Base Lewis McChord, Washington. This Design-Bid-Build project, issued as a Firm Fixed Price task order against a MATOC IDIQ contract, has an estimated value between 1 million and 5 million dollars. The scope of work includes site preparation, stormwater mitigation via an infiltration pond, the purchase and erection of the steel building, installation of a concrete slab, underground utilities, a dry pipe fire suppression system, and the installation and testing of desiccant dehumidifying equipment. The facility will also feature a solar-ready roof zone. The project must be completed within 365 calendar days of the notice to proceed, with work commencing within 10 days of that notice. Award decisions will be based on a balanced evaluation of technical capability and price, with both factors being of approximately equal importance. Technical evaluations will focus on the proposed project schedule and the qualifications of key personnel. Bidders are required to provide a bid guarantee and must adhere to prevailing wage rates for Pierce County. All invoices are to be processed through the Wide Area Workflow system. Offers are due by October 18, 2026.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 21 days
View Details
NAICS: 236220
New
South Concourse Evolution (SCE) Bid Package 3
Solicitation # south-concourse-evolution-sce-bid-package-3
Hensel Phelps, acting as the General Contractor/Construction Manager, is soliciting bids for Bid Package 3 of the South Concourse Evolution (SCE) project at the Seattle-Tacoma International Airport in Washington. This solicitation is set aside for Small Disadvantaged Businesses under NAICS code 236220. The scope of work is divided into several subsystems, including Phase 1 glass and aluminum systems, vertical transportation for Phase 1 and select Phase 2, and the demolition and installation of passenger loading bridges. Additionally, the package covers the build-out of main electrical rooms, encompassing masonry, drywall, doors, frames, hardware, and miscellaneous metals. Budget ranges for these subsystems vary, with the glass and aluminum systems estimated between 7.5 million and 10 million dollars and passenger loading bridges between 3 million and 4.5 million dollars. The project is governed by a Project Labor Agreement and requires all subcontracts to be executed on standard Hensel Phelps forms. Bidders must submit a bid bond using the provided forms and successful awardees must furnish Small Business Administration Form ID numbers. The solicitation encourages participation from small, disadvantaged, veteran-owned, service-disabled veteran-owned, and HUBZone businesses. All subcontractors are required to provide a workers compensation waiver of subrogation. The response deadline for this solicitation is October 14, 2026.
Hensel Phelps

POSTED

about 1 hour ago

DEADLINE

in 16 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation by J & J Contractors, Inc. is for the P1102 Weapons Magazine and Ordnance Operations Facility at the Naval Submarine Base in Groton, Connecticut. The project involves a comprehensive scope of work including the construction of six Containerized Long Weapons Storage units, two Box G, and one Box H earth-covered high-explosive magazines. Key construction elements include reinforced concrete floors, grounding and lightning protection, intrusion detection systems, and specialized foundation features such as rigid inclusions and load transfer mats. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection area, and a Sentry building, alongside the demolition of 18 existing magazines and two specific buildings. The project duration is set for 1828 calendar days and encompasses extensive site work, including rock excavation, grading, and wetland mitigation. Required trades span demolition, abatement, structural steel, electrical utilities, plumbing, mechanical, and fire protection, as well as paving and landscaping. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must respond by October 31, 2026, and should contact Rahul Maheshwari to obtain the bid invitation and necessary documentation.
J & J Contractors, Inc

POSTED

about 1 hour ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS