City of Barstow General Plan and Barstow International Gateway Project Draft Environmental Impact Report

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Barstow, in conjunction with BNSF Railway, is advancing the Barstow International Gateway Project, a large-scale integrated rail and logistics facility designed to enable direct transloading of freight containers from ships at the Ports of Los Angeles and Long Beach onto the BNSF mainline via the Alameda Corridor. The project involves the development of approximately 4,400 acres of previously undeveloped land in and around Barstow, California, including construction of an intermodal rail yard, block swap yard, transload warehouse, and private solar utility, alongside off-site infrastructure upgrades such as rail extensions, stormwater systems, and roadway modifications. This initiative is part of a broader update to the City’s General Plan extending to 2048 and requires approval under the California Environmental Quality Act (CEQA), including the preparation of a comprehensive Environmental Impact Report. The project directly impacts 3,968.20 acres of Agassiz’s desert tortoise habitat and 3,947.68 acres of western burrowing owl habitat, resulting in incidental take of both species, which are protected under the California Endangered Species Act. To authorize this take, the California Department of Fish and Wildlife has issued an Incidental Take Permit (No. 2081(b)-2026-009-06), contingent on implementation of extensive mitigation and conservation measures. All environmental compliance, public disclosures, and approval processes are managed through the City of Barstow as the lead agency, with oversight tied to formal findings, mitigation conditions, and a Statement of Overriding Considerations. No federal acquisition regulations or contractual terms apply—this is a state-level land use and environmental planning effort, with funding and fees handled through administrative channels rather than traditional procurement mechanisms. No formal contract value, line item pricing, or federal contracting clauses are identified; the project’s structure is rooted in environmental permitting, land use planning, and regulatory compliance under CEQA rather than a conventional government contract for goods or services.

General Info

Barstow approves major rail-logistics project with conservation easement and environmental review.

Agency

California → City of Barstow

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Barstow, CA

Set-Aside

NONE

Documents

(108)

Appendix 5.3 Big-1 Air Quality Technical Report

PDFother

Appendix 3

PDF

Water Supply Assessment for Barstow International Gateway

PDFwater-supply-assessment

Energy Section Analysis for Barstow International Gateway Project

PDFenvironmental-impact-analysis

CDFW Comment on City of Barstow General Plan and Barstow International Gateway Project DEIR

PDFcomment

Environmental Impact Report Section 5.2 Agriculture and Forestry Resources

PDFenvironmental-impact-report

Appendix 5.7 BIG-2 Mineral Resources Technical Report November 2025

PDFtechnical-report

City of Barstow General Plan and Barstow International Gateway EIR Project Description

PDFenvironmental-impact-report

Appendix 5 Air Quality Technical Report Part 2

PDFtechnical-report

Appendix 5.14 GP-1: Public Services Letters for Barstow General Plan Update

PDFsupporting-document

BNSF Barstow International Gateway Energy Assessment Appendix 5.6

PDFenergy-assessment

Appendix 5.12 BIG-1 Noise and Vibration Technical Report

PDFtechnical-report

CHP Comment Letter on Barstow General Plan Update SCH# 2024020501

PDFcomment-letter

Appendix 5

PDF

Appendix 5.15 GP-1: Transportation Study for Barstow General Plan Update

PDFstudy-report

Appendix 5

PDF

Appendix 5 Air Quality Technical Report Part 9

PDFtechnical-report

Appendix 5.9 Hazardous Materials and Wastes Technical Report

PDFtechnical-report

Appendix 5 Air Quality Technical Report Part 8

PDFtechnical-report

Environmental Impact Report Section 7 - Other CEQA Considerations

PDFenvironmental-impact-report

SCH 2024020501 Barstow General Plan Draft EIR Review Extension Memo

PDFmemorandum

Notice of Determination - City of Barstow General Plan Update 2026

PDFnotice-of-determination

Appendix 5.11 GP-1: Proposed General Plan SBLAFCO Cortese-Knox Hertzberg Local Government Reorganization Act

PDFappendix

Appendix 5 Air Quality Technical Report Part 6

PDFother

Barstow International Gateway Geology and Mineral Resources Report

PDFenvironmental-impact-report

Appendix 5

PDF

Appendix 5.3 BIG-1 Air Quality Technical Report

PDFother

Appendix 5.11 Economic and Fiscal Impact Analysis for Barstow International Gateway

PDFeconomic-impact-analysis

Appendix 5 Air Quality Technical Report Part 5

PDFother

Appendix 5.7 Big-1 Geology, Soils, and Seismicity Technical Report

PDFtechnical-report

Appendix 5.9 Big-1 Hazardous Materials and Wastes Technical Report

PDFtechnical-report

Biological Resources Section of Environmental Impact Report

PDFenvironmental-impact-report-section

Barstow International Gateway Utility Assessment Technical Report

PDFtechnical-report

2024020501_RWQCB_Comment on Barstow DEIR

PDFcomment

Appendix 5

PDF

Appendix 5.9 Big-1 Hazardous Materials and Wastes Technical Report

PDFtechnical-report

Barstow International Gateway Project Environmental Impact Report

PDFenvironmental-impact-report

Barstow International Gateway Project Aesthetics Impact Analysis

PDFenvironmental-impact-report

Appendix 5

PDF

Appendix 5

PDF

Barstow General Plan and BIG Population and Housing EIR Section

PDFenvironmental-impact-report-section

_Memo - CH to LCI State Clearinghouse 2024020501 (Extend Comment Period to 1-12-25)

ZIP

Environmental Impact Report Alternatives Analysis Section 8

PDFenvironmental-impact-report

Notice of Determination for Barstow International Gateway and General Plan Projects

PDFnotice-of-determination

Appendix 5.15 BIG-1 Barstow International Gateway CEQA Transportation Analysis

PDFenvironmental-assessment

Appendix 5.3 Big-1 Air Quality Technical Report

PDFother

Appendix 6 - BIG Cumulative Projects List

PDFother

City of Barstow General Plan Update and Barstow International Gateway Specific Plan NOP

PDFnop

Appendix 8.0 BIG-1 Alternative Market Analysis

PDFmarket-analysis

Barstow International Gateway Air Quality Technical Report November 2025

PDFtechnical-report

Appendix 5.9 Big-1 Hazardous Materials and Wastes Technical Report

PDFtechnical-report

Barstow International Gateway Cultural Resources Assessment November 2025

PDFcultural-resources-assessment

Appendix 5.9 BIG-1 Hazardous Materials and Wastes Technical Report November 2025

PDFsow

City of Barstow Proposed General Plan and Barstow International Gateway Project DEIR Notice of Completion

PDFnotice-of-completion

Appendix 5.1 BIG-1 Methodology for Evaluating Aesthetic Impacts

PDFsow

Notice of Determination for Barstow International Gateway Project ITP 2081(b)-2026-009-06

PDFnotice-of-determination

Appendix 5.16 GP-2: Tribal Correspondence Matrix

PDFother

Appendix 5.9 Hazardous Materials and Wastes Technical Report

PDFtechnical-report

Appendix 5 - California LESA Model for Barstow International Gateway

PDFother

City of Barstow General Plan and Barstow International Gateway Environmental Analysis

PDFenvironmental-analysis

Appendix 5.6 GP-1 Energy Modeling Report

PDFother

Barstow Project Context and History Overview

PDFother

Appendix 5.3 Big-1 Air Quality Technical Report Part 7

PDFother

Appendix 5.13 GP-1: 2023-2048 Population, Housing, and Employment Projections

PDFsupporting-document

Appendix 5.3 Big-1 Air Quality Technical Report

PDFother

Appendix 5

PDF

Environmental Impact Report Section 5.10 Hydrology and Water Quality

PDFenvironmental-impact-report

Appendix 5.11 GP-1 SBLAFCO Cortese-Knox Hertzberg Local Government Reorganization Act

PDFappendix

Appendix 5.16 GP-1: NAHC Response - Native American Consultation List

PDFspecial-notice

Appendix 5.10 BIG-1 Hydrology and Hydraulic Design Technical Report

PDFtechnical-report

City of Barstow General Plan Update Conditions Infrastructure Report

PDFreport

City of Barstow General Plan Update and BIG Project Draft EIR

PDFenvironmental-impact-report

Appendix 5.3 GP-1: Air Quality and Greenhouse Gas Emissions Modeling

PDFsow

Appendix 5.17 GP-2: Service Provider Questionnaire for Barstow General Plan Update EIR

PDFquestionnaire

Barstow International Gateway Noise and Vibration Environmental Report Section 5.12

PDFenvironmental-assessment

Environmental Impact Report Section 6: Cumulative Impacts Analysis

PDFeir-section

Appendix 5.12 GP-1 Noise Monitoring and Modeling Data

PDFother

Barstow International Gateway Greenhouse Gas Emissions Assessment November 2025

PDFenvironmental-assessment

Appendix 5.3 BIG-1 Air Quality Technical Report Part 14

PDFtechnical-report

2024020501_CARB Comment Letter on Barstow General Plan DEIR

PDFcomment-letter

Appendix 5.1 BIG-2 Solar Farm Glare Study Memorandum

PDFstudy-report

Environmental Impact Report Section 5.11 Land Use and Planning

PDFenvironmental-impact-report

Section 5.16 Tribal Cultural Resources Environmental Impact Analysis

PDFenvironmental-impact-section

EIR Consultation and Preparation Document for City of Barstow General Plan

PDFsow

Appendix 5.3 BIG-1 Air Quality Technical Report Part 15

PDFother

CPUC Comment Letter on Barstow General Plan DEIR SCH 2024020501

PDFcomment-letter

Appendix 5.9 BIG-1 Hazardous Materials and Wastes Technical Report

PDFtechnical-report

Appendix 5 Air Quality Technical Report Part 3

PDFother

City of Barstow Proposed General Plan and Barstow International Gateway Specific Plan DEIR Summary

PDFenvironmental-summary

Appendix 3-2 Barstow Code Title 19 Zoning Updates

PDFspecifications

Barstow International Gateway Paleontological Resources Assessment Appendix 5.7

PDFenvironmental-assessment

Appendix 5.9 BIG-1 Hazardous Materials and Wastes Technical Report

PDFtechnical-report

Air Quality Technical Report Appendix 5

PDFtechnical-report

Environmental Impact Report Section 5.17 Utilities and Service Systems

PDFenvironmental-impact-report

NOA for Barstow General Plan Draft Environmental Impact Report

PDFnotice-of-availability

Barstow International Gateway Project Hazardous Materials and Wildfire Section

PDFenvironmental-impact-section

Appendix 5.3 BIG-1 Air Quality Technical Report

PDFsow

Cultural Resources Section of Environmental Impact Report

PDFenvironmental-impact-report-section

Environmental Impact Report Section 5.14 Public Services and Recreation

PDFenvironmental-impact-report

Appendix 5.17 Big-3 Solar Farm Development Plan

PDFother

Appendix 5.3 Big-1 Air Quality Technical Report

PDFother

Barstow International Gateway and General Plan Greenhouse Gas Emissions Analysis

PDFenvironmental-impact-report

Appendix 5.3 BIG-1 Air Quality Technical Report Part 4

PDFtechnical-report

City of Barstow General Plan and Barstow International Gateway Project Draft Environmental Impact Report November 2025

PDFenvironmental-impact-report

Barstow General Plan and BIG Transportation Impact Analysis

PDFenvironmental-impact-report-section

Barstow General Plan and International Gateway Air Quality Impact Analysis

PDFenvironmental-impact-report

City of Barstow General Plan November 2025

PDFgeneral-plan

Barstow Proposed General Plan Population, Housing, and Employment Projections Methodology

PDFsow

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Amendment 1

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Barstow
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Barstow
Office AddressN/A
Contacts
Scott JakubowskiEnvironmental Scientist
Chris HeldrethBuilding Inspector

Interested Companies (1)

Show more
PlaceWorks
Santa Ana, CA

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has issued an ITP (No. 2081(b)-2026-009-06), pursuant to Section 2081(b) of the Fish and Game Code to Burlington Northern and Santa Fe (BNSF) Railway. The Project’s primary function is to create an integrated rail facility to allow direct transfer of freight containers from ships at the Ports of Los Angeles and Long Beach to trains for transport through the Alameda Corridor onto the BNSF mainline and to the Project Area. Once at the Project Area, freight will be transloaded from international containers to domestic containers for subsequent nationwide distribution. The Project includes the development of approximately 4,400 acres of previously developed undeveloped, vacant, and agricultural land. The Project will relocate existing facilities, construct new facilities, expand existing facilities, and includes operations and maintenance. The Project will result in impacts to 3,968.20 acres of Agassiz’s desert tortoise (Gopherus agassizii) habitat and impacts to 3,947.68 acres of western burrowing owl (Athene cunicularia ssp. hypugaea) habitat. The project is expected to result in incidental take of Agassiz’s desert tortoise (Gopherus agassizii), which is designated as an endangered species under the California Endangered Species Act (CESA), and incidental take of western burrowing owl (Athene cunicularia ssp. hypugaea), which is designated as a candidate species under CESA. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
Federal
PROJECT VA GWMP CLI-CULTURAL RESOURCE SURVEY
Solicitation # 693C7326Q000015
The contract is a Request for Quotation issued by the Federal Highway Administration’s Eastern Federal Lands Highway Division for the development of a Cultural Landscape Inventory for the Spout Run Parkway segment of the George Washington Memorial Parkway in Arlington, Virginia, covering approximately 46 acres bounded by the Memorial Parkway to the north, Interstate 66 to the south, the North Highland neighborhood to the east, and the Woodmont neighborhood to the west. The contractor must possess specialized expertise in cultural resource surveying and be capable of conducting technical analyses to produce a comprehensive final inventory that includes a narrative and graphic chronology of physical history, an integrity assessment, a condition evaluation, treatment recommendations, maps, GIS geodatabases, and supporting documentation adhering to National Park Service standards, including the NPS Cultural Landscapes Inventory Professional Procedures Guide (2025), the Secretary of the Interior’s Standards for Archeology and Historic Preservation, and the Chicago Manual of Style (18th Edition). All deliverables must comply with Section 508 accessibility requirements, be produced using NAD83 (2011) datum for GIS data, and follow the NPS Core Data Standards model, with final GIS layers requiring explicit approval by NPS GIS staff. The contract is firm-fixed price and requires itemized cost breakdowns for all tasks, including reimbursable travel expenses limited to GSA per diem rates for McCalla, Alabama, with receipts mandatory for airfare, rentals, and miscellaneous costs, and administrative expenses must detail actual hours and costs. Award will be determined based on best value rather than lowest cost, evaluating proposed methods and techniques, contractor qualifications and experience alongside price, with no small business set-aside and no formal weighting system provided. Contractors must maintain an active SAM registration with up-to-date UEI, CAGE, and tax information and affirm representations related to entity responsibility, non-inversion, tax compliance, and small business status. The contract incorporates unique clauses including a deviation of FAR 52.212-4 for commercial services, a requirement to comply with 52.222-90 prohibiting racially discriminatory DEI activities, and mandates for electronic invoicing through the DOT’s Delphi eInvoicing portal accessed via Login.gov, with a copy emailed to the FHWA COR. All work product becomes the sole property of the U.S. government, and contractors may retain only copies. Performance is required through December 30, 2027, with final government acceptance scheduled from August
693C73 Eastern Federal Lands Division

POSTED

about 9 hours ago

DEADLINE

in 4 days
View Details
NAICS: 541620
New
Federal
F107--Asbestos Baseline Survey Northern California VA Health Care System
Solicitation # 36C26126Q1100
The Department of Veterans Affairs, through its Network Contracting Office 21, is seeking information from contractors capable of performing an Asbestos Baseline Survey at the Northern California VA Health Care System under NAICS code 541620, with a small business size standard of $19 million. This is a sources sought announcement only, not a solicitation, and no binding commitments or payments are guaranteed. Responses must be submitted by email to Angela Gerlitzki no later than 10:00 a.m. EST on August 14, 2026, and must include the company’s legal name, SAM Unique Entity Identifier, socioeconomic status, certifications, capability statements, similar past projects, teaming or subcontracting plans complying with FAR and VAAR limitations, GSA contract number if applicable, and a completed price estimate. Participation requires current SAM registration and, for SDVOSB or VOSB firms, active certification in the SBA’s database. The anticipated period of performance is from September 8, 2026, to September 7, 2027, with the solicitation number 36C26126Q1100 to be referenced in all communications. All submissions will be used solely by the VA to inform future procurement decisions and will not be disclosed outside the government. Failure to provide all requested information will result in a non-responsive submission.
261-NETWORK Contract Office 21 (36C261)

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details