Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

City of Calgary - Request for Proposal - SOR 25-2024-S01 Downtown East Siphon Upgrades

Active
AB-2026-06023International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Calgary is seeking proposals for the upgrade of the Downtown East Siphon, a high criticality 1,200 mm steel wastewater asset installed in 1981. Because the siphon is nearing the end of its service life and lacks redundancy, it is prioritized as a high risk infrastructure project. The scope of work is divided into five distinct phases, beginning with conceptual and preliminary design, moving through detailed design and procurement documentation, and concluding with contract administration, field services, and project closeout. This solicitation, identified as SOR 25-2024-S01, is restricted to a specific list of consultants including AECOM Canada ULC, Associated Engineering Alberta Ltd., CH2M Hill Canada Limited, Englobe Corp., and Stantec Consulting Ltd. Interested parties must submit their responses by the deadline of September 15, 2026. The project is managed by the City of Calgary and will be performed within the province of Alberta.

General Info

City of Calgary seeks proposals for Downtown East Siphon upgrades by September 15, 2026.

Agency

City of CalgaryView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

AB, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCity of Calgary
Contacts1 person available
OfficeN/A
Organization / Agency
City of Calgary
View Agency Profile
Office AddressN/A
Contacts
Deji OrungbemiSenior Buyer

Full Description

Show more
The Downtown East Siphon is a 1,200 mm steel wastewater siphon installed in 1981 (approximately 45 years old) that crosses the Elbow River north of the 9 Avenue SE bridge and south of the pedestrian bridge at 8 Street SE and 8 Avenue SE. The siphon has no redundancy and is nearing the end of its service life. Due to its age, size, and lack of redundancy, the Downtown East Siphon is considered a high risk, high criticality asset and is among the City’s top priority infrastructure. The following phases will form the scope of work for this project, with each phase requiring approval from The City to proceed: • Phase 1 Conceptual Design • Phase 2 Preliminary Design • Phase 3 Detailed Design and Preparation of Construction Procurement Documents; • Phase 4 Contract Administration and Field Services; and • Phase 5 Post Construction Services and Project Closeout.
This SOR is open to those Listed Consultants from The City’s RFSO as listed in Schedule A to the Master Agreement.  AECOM Canada ULC  Associated Engineering Alberta Ltd.  CH2M Hill Canada Limited  Englobe Corp.  Stantec Consulting Ltd.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project (Work Order C2305) on behalf of the Elsinore Valley Municipal Water District in California. This professional services agreement seeks qualified DBE firms to provide comprehensive design, bidding support, and engineering services during construction. The scope is divided into two phases: Phase 1 focuses on civil site design, technical specifications, and construction management for the drilling of a new well and the abandonment of the existing one; Phase 2 covers architectural, civil, mechanical, structural, electrical, and I&C design drawings, as well as equipping, testing, and commissioning. Technical requirements specify the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and compliance with AWWA potable water well construction standards, Riverside County, and California State Water Resources Control Board regulations. The contract is set aside for small and disadvantaged businesses, including DBE, WOSB, and SDVOSB entities. Award selection is based on the most advantageous proposal, considering both price and other factors. Key requirements include the provision of performance and payment bonds for 100 percent of the contract price, a bid guarantee of five percent, and adherence to California prevailing wage laws. Consultants must maintain active SAM registration and provide a project manager as the primary point of contact. Payment is processed via monthly itemized statements, with a 45-day review and payment cycle. Proposals must be submitted via PlanetBids by September 1, 2026, and must include a cover letter, a detailed project approach, staff resumes, a five-year representative project list, and three professional references.
Ardurra Group, Inc.

POSTED

about 20 hours ago

DEADLINE

in 3 days
View Details

More opportunities from City of Calgary

Same awarding agency