Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

City of Rohnert Park Demonstration Project, Project No. 2026-01NC

Forecast
2026-01NCState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Rohnert Park is advancing a demonstration project to enhance pedestrian and bicycle safety along a 0.3-mile segment of Adrian Drive between Arlen Drive and Southwest Boulevard, east of Highway 101. This corridor, which connects John Reed Elementary, Technology Middle School, Technology High School, Alicia Park, Benicia Park, the Girl Scouts Training Center, churches, and residential areas, has long been plagued by excessive vehicle speeds and non-compliance with stop signs due to its oversized design that does not align with its residential context. The initiative aims to transform the street into a safer, more inviting environment for active transportation through traffic calming measures, improved visibility for pedestrians and cyclists, and aesthetic enhancements that reinforce its role as a key community link. Environmental compliance is supported by a CEQA categorical exemption under Section 15301(c), confirming the project as a maintenance action on an existing public facility. The project is identified as Project No. 2026-01NC and was posted as a forecast on June 22, 2026, with Laura Luchini serving as the primary point of contact for the City’s CIP Program. While the NAICS code 237310 indicates it is a highway and street construction project, detailed pricing, contract value, payment terms, and formal evaluation factors are not provided in the available documentation. The place of performance is clearly defined as Adrian Drive in Rohnert Park, California, and proposals must include a certified document of exemption finding, submitted to the Office of Planning and Research in Sacramento by the posted deadline. No formal contract clauses, special requirements, inspection standards, packaging details, or contractor representations are specified in the provided materials.

General Info

Rohnert Park to calm traffic on Adrian Drive in 2026 for safer student and pedestrian access.

Agency

California → City of Rohnert Park

Place of Performance

Rohnert Park, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Rohnert Park
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Rohnert Park
Office AddressN/A
Contacts
Laura LuchiniCIP Program Manager

Full Description

Show more
The City of Rohnert Park’s Demonstration Project efforts will prioritize safety, comfort and attractiveness of 0.3 miles of Adrian Drive for pedestrian/bicycle use, creating enhanced connectivity on the east side of Highway 101. Treatments will calm vehicle traffic, increase driver visibility of pedestrians and cyclists, and enhance the active transportation context on this key route that connects schools (John Reed Elementary, Technology Middle School, Technology High School) with parks (Alicia Park, Benicia Park), Girl Scouts Training Center, other youth centers, churches, and residences. Adrian Drive, between Arlen Drive and Southwest Boulevard, has a width that does not align with the residential context, encouraging speeding and driver non-compliance to stop signs, and which has a north end terminus at John Reed Elementary and a south end terminus near Technology Middle School. Over many years, residents/families and school administration have spotlighted drivers’ excessive speeds.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site preparation, civil works, and surface improvements. Specific requirements encompass land surveying, site clearing, shoring, asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. Additionally, the project requires environmental and support services including storm water pollution prevention (SWPPP), quality control, and the supply of ready mix and precast concrete. This opportunity is specifically targeted toward qualified Small Business (SB), Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) firms, including MBE, VBE, and OBE certifications. To be considered responsive, bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested parties must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
250218.01 Reconstruction of 84th Avenue and Riley Street Bike Path
Solicitation # 250218.01
The City of Zeeland is soliciting bids for the reconstruction of 84th Avenue and the Riley Street Bike Path in Ottawa County, Michigan. This project involves approximately 1,450 feet of street and drive reconstruction and a shared use path, including HMA paving, storm sewer improvements, and the installation of manholes and catch basins. Major work items include 5,800 square yards of 8-inch aggregate base, 540 feet of 18-inch sewer in stone trench, and 2,800 feet of modified concrete curb and gutter. The engineer's estimate for the project is 1,111,000 dollars, and the work will be entirely funded by the City of Zeeland. Encrypted bids must be submitted via the Bid Express e-bidding system by 11 a.m. local time on Thursday, November 12, 2026. Bids will be evaluated on a unit price basis, and only bidders prequalified by the City of Zeeland will have their proposals opened. Submissions must include a proposal guarantee in the form of a bid bond or certified check for five percent of the bid amount. The successful contractor will be required to provide performance and lien bonds for 100 percent of the contract value, as well as certification of Workmen's Compensation Insurance. All work must adhere to MDOT Standard Specifications for Construction and be performed by a licensed DC contractor under the direction of the project engineer.
Moore & Bruggink, Inc

POSTED

about 3 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237310
New
SLED
26-33-1
Solicitation # 26-33-1
St. Tammany Parish Government is soliciting quotes for the Wildwood Farms Subdivision Drainage project in Pearl River, Louisiana. The scope of work requires a contractor to provide all labor, equipment, and materials to improve drainage by removing and replacing drain pipes, catch basins, and driveway pipes along Max Mercer Rd (R06I026) and Cecil Fleming Rd (R06I009). The project must be completed within 45 calendar days from the issuance of the Notice to Proceed. Key deliverables include approved shop drawings and final record drawings of all changes, including underground utilities. The contract will be awarded to the lowest responsive monetary quote from a contractor holding a Highway, Street, and Bridge Construction classification. For projects estimated at 50,000 dollars or more, contractors must be licensed under Chapter 24 of the Louisiana Revised Statutes, Title 37. Bids must be submitted by November 12, 2026, via certified mail, hand-delivery, or courier. Payment is structured through monthly certificates for partial payment at 90 percent of work performed and materials stored, with the final 10 percent released 45 days after filing acceptance and securing a Clear Liens and Privilege Certificate. Contractors must comply with various federal and state regulations, including the Clean Air Act, Clean Water Act, and several non-discrimination and equal opportunity statutes. Safety requirements mandate the use of fences, railings, and lighting around excavations to protect the public. The project is governed by the Manual on Uniform Traffic Control Devices and LADOTD Standard Specifications for Roads and Bridges. Required submission documents include a revised unit price form, corporate resolution of authority, and a W-9 for new vendors.
St. Tammany Parish Government

POSTED

about 6 hours ago

DEADLINE

in 2 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS