This Solicitation opportunity from Government of Canada was posted on September 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Port Moody is soliciting proposals under RFP26-29 for a qualified roofing or general contractor to replace the gutter system and install a de-icing system at the Civic Centre entrance, specifically between the Galleria wall and the glass canopy. The project aims to resolve existing leaks and prevent ice buildup to ensure public safety. The scope of work includes the removal and disposal of existing gutters and downspouts, the installation of a new gutter system—updated via addenda to 18 gauge 304 stainless steel—and the design and installation of a chemical-free de-icing system, with a preference for electric self-regulating heating cables. The contractor is responsible for all necessary electrical infrastructure, permits, and safety equipment, including aerial work platforms and scaffolding, with a target completion date of late November 2026.
Proposals will be evaluated based on a weighted system consisting of 60% technical specifications—covering the technical proposal, comparable work experience, team qualifications, company profile, and warranties—and 40% financial proposal. Mandatory submission requirements include resumes for the Site Supervisor and Lead Electrician, a WorkSafeBC clearance letter, a City of Port Moody business license, and a project timeline in Gantt format. The closing date for submissions via the electronic bidding system was extended to October 16, 2026. The final contract will be based on the City's Standard Service Contract, the successful proponent's submission, and the defined Scope of Services.
General Info
Port Moody seeks a contractor for Civic Centre gutter replacement and de-icing installation.
HighAI Summary for City Hall/Theatre and Library - Electrical Lighting Plan E8: Architectural and engineering drawing (Plan E8) for the Port Muddy City Hall, Theatre, and Library project, specifically focusing on electrical lighting. The document includes general notes on dimensions, compliance with local codes (Section 240.1550), and material requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Council Chamber East Elevations - A5.3: Architectural drawing specifications for the Council Chamber East Elevations, including recessed facade south elevation and side cross sections. Document includes scales and wall lengths, dated between June 1961 and March 1962, attributed to architect James E Kim Cheng for Indian Head Village.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Reference Elevations - A5.1 (Le Brevois de l'Europe): Architectural reference elevations and specifications for the Le Brevois de l'Europe project, dated June 2023. The document includes detailed parameters for wall, roof, and eave heights, as well as electrical and plumbing workshop details, produced by James Kim Chew Studio.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Reference Material E1 - Roof Plan - A4.6: Technical roof plan document (Version 1) detailing the work scope area, dimensions, load capacity, and fire resistance innovation plan for a project by James Kim Cheng Architecture Design and Literary.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Reference Material E4 - Library South Elevations - A5.5: Architectural drawing document from James M. Chesmert Architects featuring south elevations and section views of the library west entry and customer lounge.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Reference Material E5 - Partial Building Sections - A6.1: Architectural drawing sections and details for building components, including councillors offices, city hall offices, fascia panels, and service cores. Produced by James Kim Cheng Architectural Designer PC.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Reference Material E6 - Building Sections - A6.2: Technical building section drawings and specifications detailing the reinforcement core framework, earth rocking system, wall/door locations, and foundation elements. Includes specific section details for the house entrance room, stairs, and ceiling, along with general notes on scale and structural analysis methods.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Reference Material E8 - Symbol Schedule / Deck Plan E1: Reference Material E8 for site plan and symbol schedule electrical sheet E1. The document contains sectioned deck construction report and deck layout plan entries, plus a symbol schedule with detailed transmission line parameters and load factor tables. It appears to provide technical plan/specification content rather than a solicitation or contract award.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP26-29 Addendum 01 - Civic Centre Entrance Glass Canopy Gutter Replacement: Addendum 01 issued September 25, 2026, for RFP26-29 regarding the Civic Centre Entrance Glass Canopy Gutter Replacement. This document provides a response to a bidder question concerning gutter design, specifying that the gutter material is amended to 18 ga. aluminum per Detail 6 and confirming a gutter height of 8 inches. It references updated record drawings and an amended Scope of Services.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP26-29 Civic Centre Entrance Glass Canopy Gutter Replacement: Request for Proposals (RFP26-29) for the removal of existing gutters and installation of a new PVC gutter system and de-icing system at the Civic Centre Entrance. The document includes a schedule of prices, requirements for a technical proposal, company profile, experience, and team qualifications. Closing date is October 14, 2026.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 26 29 - Civic Centre Entrance Glass Canopy Gutter Replacement: Request for Proposals (RFP 26 29) issued by the City of Port Moody for the replacement of the Civic Centre Entrance Glass Canopy Gutter. The document outlines instructions for proponents, bidding system registration, evaluation criteria, and terms and conditions, and includes schedules for the scope of services and contract form.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP26-29 Civic Centre Entrance Glass Canopy Gutter Replacement - Addendum 02: Addendum 02 issued October 2, 2026, for the Civic Centre Entrance Glass Canopy Gutter Replacement project. It provides clarifications on the scope of gutter replacement (Public Galleria roof gutter at grid B), requirements for liner membranes, heating specifications for the glass canopy, aerial work platform loading, site access/hours, and confirms that bonding is not required. It also addresses the project completion date and electrical cabling routing.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP26-29 Civic Centre Entrance Glass Canopy Gutter Replacement - Addendum 03: Addendum 03 issued October 8, 2026, for RFP26-29. It extends the closing date to October 16, 2026, and updates the gutter material specification to 18 gauge 304 stainless steel (304SS). It also provides clarifications on site inspection safety requirements and the use of custom fabricated curved gutters.
PDF
PDF, High priority: read this firstsow
HighAI Summary for RFP 26-29 Schedule A - Scope of Services: This document is Schedule A (Scope of Services) for City of Port Moody RFP 26-29. It outlines the requirements for replacing the gutter system and installing a de-icing system at the Civic Centre to prevent leaks and ice buildup on the glass canopy. Key deliverables include the removal of old gutters, installation of a PVC system, electrical work for heating cables, and site safety measures. The project is scheduled for completion by late November 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 26-29 Schedule B - Evaluation Criteria: This document outlines the evaluation criteria for the City of Port Moody RFP 26-29. It specifies the weighting for the selection process, allocating 40% to the Financial Proposal (Project Price) and 60% to technical specifications, including Company Profile (5%), Comparable Work Experience (15%), Team Qualifications (10%), Technical Proposal (25%), and Warranties (5%).
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for RFP 26-29 Schedule C - Form of Contract: This document is Schedule C (Form of Contract) for the City of Port Moody's RFP 26-29. It specifies that the final contract will be based on the Scope of Services, the successful proponent's submission, and the City's Standard Service Contract.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP26-29 Schedule E - Reference Materials: Schedule E of RFP26-29 for the City of Port Moody, providing a comprehensive list of reference materials including roof plans, elevations, building sections, site plans, and electrical plans.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Wall Sections & Details - Galleria and Truss - A8.6: Technical architectural drawings and details for the Public Gallery and Overhead Arcade truss (Truss 6) for the Port Moody Architecture and Leaseholder Auditorium project, including elevations, plans, and lateral sections.
PDF
PDF, Low priorityother
LowAI Summary for James Henry Sims - COO Application: A cover letter and resume for James Henry Sims applying for a Chief Operating Officer (COO) position, dated 12/10/2023. The document outlines his educational background from UBC and professional experience in healthcare project management and clinical coordination.
The City of Port Moody is seeking a qualified roofing or general contractor to replace the existing gutters between the Galleria wall and the glass canopy at the Civic Centre and install a suitable de-icing system to prevent ice buildup at the canopy edge.
More opportunities from Government of Canada → City of Port Moody