This Government Contract opportunity from Texas was posted on July 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Civil and Water Infrastructure Engineering Design
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract seeks the development of construction-ready plans and specifications for water lines, storm drainage systems, and associated infrastructure, requiring progressive design submittals at 60%, 90%, and 100% stages, each must be sealed by a Texas-licensed Professional Engineer. The work must comply with all applicable technical and regulatory standards to ensure full readiness for construction, with deliverables serving as the foundation for permitting and field implementation. All design documentation shall reflect a thorough understanding of local hydrology, geotechnical conditions, and municipal requirements to support durable and compliant infrastructure. The opportunity is posted as a subcontract under NAICS code 541330, issued by the Alamo Area Council of Governments in Texas, with a response deadline of August 21, 2026. While specific location details for performance are not provided, the project is intended to serve municipal or regional needs within Texas, requiring proposers to be familiar with state and local engineering practices and licensing requirements. Contractors must demonstrate experience in civil infrastructure design and the ability to deliver technically accurate, sealed documents at each milestone, ensuring alignment with public agency expectations for safety, functionality, and regulatory compliance.
General Info
Agency
NAICS
Place of Performance
TX, USASet-Aside
Documents
This scope was carved out of RFQ-26-03.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
RFQ-26-03-MIRR-Port San Antonio Water Infrastructure Design Project Professional Engineering Services
AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
