Civil/Concrete Work for Generator Pad

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves comprehensive civil and concrete work to prepare a site for the installation of a 25kW generator at a lift station, requiring excavation, precise grading, and the pouring of a load-bearing concrete pad designed to safely support the equipment. Proper drainage systems must be integrated into the pad construction to ensure water management and long-term structural integrity under operational conditions. The work must meet all engineering and safety standards to accommodate the generator’s weight and environmental exposure. This subcontract opportunity is posted by the Eastern Municipal Water District in California with a response deadline of August 24, 2026. The North American Industry Classification System code 238110 applies, indicating it falls under concrete work services. The project is accessible via a public portal, and all bids must be submitted by the stated deadline. There is no set-aside classification specified, and the place of performance and contact details are not provided in the data, though the work is located within the district’s service area in California.

General Info

Concrete pad construction for 25kW generator at lift station, with drainage, meeting safety and engineering standards.

Documents

This scope was carved out of RFP-HH-3965.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

REBID 25kW Standby Generator and Automatic Transfer Switch - Menlo Lift Station

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Eastern Municipal Water District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Site preparation including excavation, grading, and pouring of a load-bearing concrete pad with proper drainage to support the 25kW generator at the lift station.

More opportunities from California → Eastern Municipal Water District

Same awarding agency

NAICS: 237110
SLED
Menifee and Watson Road II Booster Pump Station and Matthews Transmission Pipeline ProjectThe Eastern Municipal Water District is initiating the Menifee and Watson Road II Booster Pump Station and Matthews Transmission Pipeline Project in Menifee, Riverside County. The project scope involves the construction of two new booster pump stations, the Watson Road II BPS and Menifee BPS, which will be housed in a new 12,600-square-foot building on a 1.96-acre vacant parcel west of the Antelope Road and Watson Road intersection. Additionally, the project requires the decommissioning and removal of the existing Romoland BPS located at the intersection of Ethanac Road and Antelope Road. Infrastructure development includes the installation of approximately 1.85 miles of transmission pipeline. Key components consist of a new 36-inch diameter pipeline connecting the facility to the Perris Valley North/South Pressure Zone, a 30-inch diameter transmission main in Watson Road connecting the Watson Road II BPS to the existing Watson BPS, and a 300-foot long, 36-inch steel pipeline connecting the new stations to the Romoland Feeder. The project has undergone environmental review under CEQA, including a Mitigated Negative Declaration, to address potential impacts on special-status species, cultural resources, and noise. Coordination with agencies such as the California Regional Water Quality Control Board and the South Coast Air Quality Management District is required, and compliance with Cal/OSHA standards is mandatory.
Water and Sewer Line and Related Structures Construction

POSTED

6 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS