Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Civil Engineering and Pavement Design Services

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Civil Engineering and Pavement Design Services involves providing engineering design and technical specifications for road rehabilitation projects within the Resort Municipality of Whistler. The selected provider will be responsible for validating projects from the 2025 Pavement Management Plan, creating 90 percent Detail Design Packages, and producing tender drawings and cost estimates utilizing CAD and pavement management software. A critical requirement for this contract is that the design certification must be performed by a licensed Professional Engineer. The primary deliverables include comprehensive Technical Specifications and Detail Design Packages. Interested parties must submit their responses by October 8, 2026, as part of the procurement process managed under the Province of British Columbia.

General Info

Civil engineering and pavement design services for Whistler road projects by licensed engineers.

Agency

Province of British Columbia → Resort Municipality of WhistlerView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

This scope was carved out of T10002.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFP T10002 Road and Valley Trail Reconstruction Program 2027-2029 Design, Tender, CA and Construction Services

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyProvince of British Columbia → Resort Municipality of Whistler
ContactsNo contacts available
OfficeN/A
Organization / Agency
Province of British Columbia → Resort Municipality of Whistler
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs engineering design and technical specifications for road rehabilitation for prime contractors on Resort Municipality of Whistler (RMOW) projects. Validates projects from the 2025 Pavement Management Plan, develops 90% Detail Design Packages, and prepares tender drawings and cost estimates using CAD and pavement management software. Requires P.Eng licensure for design certification. Delivers Detail Design Packages and Technical Specifications.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Power Constructors Co. is soliciting sub-quotes for the Scattergood GS Units 1&2 Green Hydrogen-Ready Modernization project, owned by the City of Los Angeles Department of Water and Power. The project requires a diverse range of technical and professional services, including civil, structural, mechanical, electrical, and instrumentation engineering support, as well as utility locating, geotechnical investigations, BIM/3D modeling, and environmental compliance monitoring. Additional required scopes include land surveying, LIDAR, hazardous materials surveys, and CPM scheduling. This solicitation specifically seeks participation from Disadvantaged Business Enterprises (DBE), Minority Business Enterprises (MBE), Women Business Enterprises (WBE), and Other Business Enterprises (OBE) that hold valid certifications from recognized agencies such as the SBA or CUCP. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected electronic system. Responsive bidders are required to hold a valid California Contractor’s license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors must provide bonding for 100% of their contract value, though Kiewit will reimburse bond premiums. Kiewit is a signatory to several collective bargaining agreements and prioritizes bidders who can maintain labor harmony on the project. The bid deadline is September 11, 2026, and all inquiries regarding licensing, insurance, bonding, or the project schedule should be directed to Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 11 days
View Details
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The primary objective of the project is to address sewer system deficiencies in southwest Bend by extending a gravity mainline sewer, installing service laterals to facilitate the conversion of properties from private septic systems to public sewer, and decommissioning existing pump stations. The scope may also include transportation improvements, such as ADA curb ramp and curb design. This project is funded by the Clean Water State Revolving Fund through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars sourced from the Water Reclamation Capital Improvement Program and Stormwater funds. The solicitation, identified as number 27-3214, is open to various small business set-asides, including SDB, WOSB, HUBZone, and SDVOSB. Proposals are due by September 29, 2026, and must be submitted electronically via the City of Bend eProcurement Portal. Evaluation is based on project understanding, team qualifications, and firm experience, with a potential optional interview. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion. The City aims to advertise for construction services in Fall or Winter 2027. Parametrix is actively pursuing a good faith effort to solicit firms with recognized federal, tribal, state, local, or independent DBE certifications.
Parametrix

POSTED

about 5 hours ago

DEADLINE

in 11 days
View Details

More opportunities from Province of British Columbia → Resort Municipality of Whistler

Same awarding agency

NAICS: 541330
New
International
RFP T10002 Road and Valley Trail Reconstruction Program 2027-2029 Design, Tender, CA and Construction Services
Solicitation # T10002
The Resort Municipality of Whistler is seeking qualified engineering consultants for the Road and Valley Trail Reconstruction Program for 2027-2029. The selected proponent will provide comprehensive services including engineering design, tendering, contract administration, and construction support. A primary objective is to review and validate projects from the 2025 Pavement Management Plan, supporting an annual program budget of approximately 1,500,000 dollars. The contract is structured as an initial one-year agreement for the 2027 program, with the possibility of two additional one-year extensions for 2028 and 2029, subject to satisfactory performance. Key deliverables include detailed design packages, Class A and B cost estimates following ACEC guidelines, tender packages, and post-construction record drawings. The consultant is responsible for part-time on-site supervision and inspection, typically occurring from May to September, with a requirement to provide weekly inspection reports. The agreement includes a maximum aggregate liability cap of 2,000,000 dollars and requires payment via direct deposit with net thirty-day terms. Proposals are evaluated based on a weighted matrix considering corporate qualifications, technical capability, project understanding, and cost, with the municipality selecting the best overall proposal.
Engineering Services

POSTED

about 19 hours ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS